ML19259B516
| ML19259B516 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 12/28/1978 |
| From: | Heishman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Howell S CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| Shared Package | |
| ML19259B517 | List: |
| References | |
| NUDOCS 7903010351 | |
| Download: ML19259B516 (2) | |
See also: IR 05000329/1978015
Text
-
'
Pog'
.
.
t**"'G%.
UNIT E D STATES
p
f
".
NUCLE AR RE GULATORY COMr.ilSSIOf.'
.
- . N. f'
1
5 .. N , ' -
neciore m
n . s oa s t. r rn
6[8
- t i e t . s . u o,
.-
'y
....=
,
op
...v
% U
s i v,
Docket No. 50-329
Docket No. 50-330
Consumers Power Company
ATTN:
Mr. Stephen H. Howell
Vice President
1945 West Parnall Road
Jackson, MI 49201
Gentlemen-
This refers to the inspection conducted by Messrs. P. A. Barrett,
G. F. Maxwell, H. M. kescott and K. R. Naidu of this office on
November 1-3, 1978, of activities at Midland Nuclear Power Plant,
Units 1 and 2, authorized by NRC Construction Permits No. CPPR-81
and No. CPPR-82 and to the discussion of our findings with Messrs.
D. B. Miller, J. L. Corley and others of your staff at the con-
clusion of the inspection.
The enclosed copy of our inspection report identifies areas
examined during the inspection. Within these areas, the
inspection consisted of a selective examination of procedures
and representative records, observations, and interviews with
personnel.
During this inspection, certain of your activities appeared
to be in noncompliance with NRC requirements, as described
in the enclosed Appendix A.
This notice is sent to you pursuant to the provisions of Section
2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code
of Federal Regulations.
Section 2.201 requires you to submit to
this office within thirty days of your receipt of this notice a
written statement or explanation in reply, including for each
item of noncompliance: (1) corrective action taken and the results
achieved; (2) corrective action to be taken to avoid further non-
compliance; and (3) the date when full compliance will be achieved.
.
1T903010Stil
h
g
- -
,
Consumers Power Company
-2-
'L
,
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this
letter, the enclosures, and your response to this letter will be
placed in the NRC's Public Document Room, except as follows.
If
the enclosures contain information that you
>r your contractors
believe to be proprietary, you must apply in writing to this office,
within twenty days of your receipt of this letter, to withhold such
information from public disclosure. The application must include a
full statement of the reasons for which the information is considered
proprietary, and should be prepared so that proprietary information
identified in the application is contained in an enclosure to the
application.
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
Y
V R. F. Heish=a , Chief
Reactor Construction and
Engineering Support Branch
Enclosures-:
1.
Appendix A, Notice
of Violation
2.
IE Inspection Reports
No. 50-329/78-15
and No. 50-330/78-15
cc w/encls:
Central Files
Reproduction Unit NRC 20b
Local PDR
Ronald Callen, Michigan Public
Service Commission
Dr. Wayne E. North
Myi a M. Cherry. Chicago