ML19257D335

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-302/79-41 on 790910-15 & Notice of Violation
ML19257D335
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/25/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
FLORIDA POWER CORP.
Shared Package
ML19257D332 List:
References
NUDOCS 8002040131
Download: ML19257D335 (2)


See also: IR 05000302/1979041

Text

.

AS RfC

  1. o

UNITED STATES

8'

NUCLEAR REGULATORY COMMISSION

^

n

$

E

REGION 11

[9

o

101 MARIETTA ST., N.W.. SUITE 3100

ATLANTA, GEORGIA 3o3o3

'

.....

OCT 2 5 1979

In Reply Refer To:

RII:RCS

50-302/79-41

Florida Power Corporation

Attn:

W. P. Stewart, Manager,

Nuclear Operations

Post Office Box 14042, Mail Stop C-4

St. Petersburg, Florida 33733

Gentlemen:

This refers to the inspection conducted by R. C. Sauer of this office on

September 10-15, 1979 of activities authorized by NRC License No. DPR-72 for the

Crystal River facility, and to the discussion of our findings held with G. P.

Beatty, Jr. at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representati

records, interviews with

personnel, and observations by the inspector.

One new unresolved item resulted from this iuspection and is discussed in the

enclosed report.

This item will be examined during subsequent inspections.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements.

This item and references

to pertinent requirements are listed in the Notice of Violation enclosed here-

with as Appendix A.

This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal

Regulations.

Section 2.201 requires you to submit to this office, within 20

days of your receipt of this notice, a written statement or explanation in reply

including:

(1) corrective steps which have been taken by you, and the results

achieved; (2) corrective steps which will be taken to avoid further noncompliance;

and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

1M4

267

8002040

. , :s ;

.

.

Florida Power Corporation

-2-

007 2 5 1979

-

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

E.c.

R. C.

ewis, Acting Chief

Reactor Operations and

Nuclear Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-302/79-41

cc w/ enclosures:

G. P. Beatty, Jr.

Nuclear Plant Superintendent

Post Office Box 1240

Crystal River, Florida 32629

1864

268