ML19257D335
| ML19257D335 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 10/25/1979 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stewart W FLORIDA POWER CORP. |
| Shared Package | |
| ML19257D332 | List: |
| References | |
| NUDOCS 8002040131 | |
| Download: ML19257D335 (2) | |
See also: IR 05000302/1979041
Text
.
AS RfC
- o
UNITED STATES
8'
NUCLEAR REGULATORY COMMISSION
^
n
$
E
REGION 11
[9
o
101 MARIETTA ST., N.W.. SUITE 3100
ATLANTA, GEORGIA 3o3o3
'
.....
OCT 2 5 1979
In Reply Refer To:
RII:RCS
50-302/79-41
Florida Power Corporation
Attn:
W. P. Stewart, Manager,
Nuclear Operations
Post Office Box 14042, Mail Stop C-4
St. Petersburg, Florida 33733
Gentlemen:
This refers to the inspection conducted by R. C. Sauer of this office on
September 10-15, 1979 of activities authorized by NRC License No. DPR-72 for the
Crystal River facility, and to the discussion of our findings held with G. P.
Beatty, Jr. at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representati
records, interviews with
personnel, and observations by the inspector.
One new unresolved item resulted from this iuspection and is discussed in the
enclosed report.
This item will be examined during subsequent inspections.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements.
This item and references
to pertinent requirements are listed in the Notice of Violation enclosed here-
with as Appendix A.
This notice is sent to you pursuant to the provisions of
Section 2.201 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal
Regulations.
Section 2.201 requires you to submit to this office, within 20
days of your receipt of this notice, a written statement or explanation in reply
including:
(1) corrective steps which have been taken by you, and the results
achieved; (2) corrective steps which will be taken to avoid further noncompliance;
and (3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
1M4
267
8002040
. , :s ;
.
.
Florida Power Corporation
-2-
007 2 5 1979
-
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
E.c.
R. C.
ewis, Acting Chief
Reactor Operations and
Nuclear Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-302/79-41
cc w/ enclosures:
G. P. Beatty, Jr.
Nuclear Plant Superintendent
Post Office Box 1240
Crystal River, Florida 32629
1864
268