ML19256B039
| ML19256B039 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 11/21/1978 |
| From: | Sutherland J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Jackie Jones CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML19256B036 | List: |
| References | |
| NUDOCS 7901170422 | |
| Download: ML19256B039 (2) | |
See also: IR 05000324/1978022
Text
,
UNITED sT ATE s
/g* *iGoq'o,
NUCLE AR REGULATORY COMMISSION
,
REGloN il
,#g
g
101 M ARIETT A sT RE E T, N W.
t
-
[
ATL ANT A. GEoHGI A 30303
j p,
%, '
r
,
- ....
In Reply Refer To:
NOV 211979
RII:GTG
50-324/78-22
50-325/78-22
Carolina Power and Light Company
ATTN:
Mr. J. A. Jones
Executive Vice President
Engineering, Construction
and Operation
336 Fayetteville Street
Raleigh, North Carolina
27602
Gentlemen:
This refers to the inspection conducted by Mr. G. T. Gibson of this office
on September 25-27, 1978, of activities authorized by NRC Operating License
Nos. DPR-71 and DPR-62 for the Brunswick Units 1 and 2 facilities, and to
the discussion of our findings held with Mr. A. C. Tollison, Jr. at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted
of selective examinations of procedures and representative records,
interviews with personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements. This item and
references to pertinent requirements are listed in the Notice of Violation
enclosed herewith as Appendix A.
This notice is sent to you pursuant to
the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations.
Section 2.201 r< quires you to
submit to this office, within 20 days of your neceipt of this notice, a
written statement or explanation in reply including:
(1) corrective steps
which have been taken by you, and the results achieved; (2) corrective
steps which will be taken to avoid further noncompliance; and (3) the date
when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If
this report contains any information that you (or your contrector) believe
790117CH &
.
NOV 211978
.
.
Carolina Power and Light
-2-
Company
to be proprietary, it is necessary that you make a written application
within 20 days to this of fice to withhold such inf ormation f rom public
disclosure. Any such application must include a full statement of the
reasons on the basis of which it is claimed that the information is
proprietary, and should be prepared so that proprietary information
identified in the application is contained in a separate part of the
document.
If we do not hear from you in this regard within the specified
period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
f+
J. T. Sr herland, Chief
Fuel Fotility and Materials
Safety Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-324/78-22
and 50-325/78-22
cc w/ encl:
Mr. A. C. Tollison, Jr.
Plant Managcr
Box 458
Southport, N. C.
28461