ML19256B040

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 780925-27
ML19256B040
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 11/17/1978
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19256B036 List:
References
50-324-78-22, 50-325-78-22, NUDOCS 7901170426
Download: ML19256B040 (1)


Text

,

NOV 21 B76 APPENDIX A NOTICE OF VIOLATION Carolina Power and Light Co.

License Nos. DPR-71 DPR-62 Based on the results of the NRC inspection conducted on September 25-27, 1978, it appears that certain of your activities were not conducted in full compliance with NRC requirements as indicated below. These items have been categorized as described in our correspondence to you dated December 31, 1974.

Appendix B, Technical Specification 5.3.1, requires written procedures be developed, implemented and maintained to implement the Appendix B requirements. In addition, Specification 5.3.1 states quality assurance procedures will be developed for analysis of samples.

Contrary to the above, on September 26, 1978, the licensee did not have a written procedure for the ND6600 gamma spectroscopy system nor was the licensee adhering to RC&T radiochemistry procedure requirements in RC&T procedures #5102, #5103, #5201, #5203, #5302, v5304, and

  1. 5401, in that the licensee was not calibrating equipment with newly prepared calibration solutions.

This item is considered an inf raction.

790117b(/M,