ML19254E108
| ML19254E108 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 09/06/1979 |
| From: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Lundvall A BALTIMORE GAS & ELECTRIC CO. |
| Shared Package | |
| ML19254E103 | List: |
| References | |
| NUDOCS 7910310105 | |
| Download: ML19254E108 (2) | |
See also: IR 05000317/1979011
Text
.I
.
UNtTED STATES
,, n gqq
o
NUCLEAR REGULATORY COMMisslON
)W,(/
3 \\
o
REGION I
,
. k
631 PARK AVENUE
$*i
f
KING OF PRUSSI A, PENNSYLVANIA 19406
,w/
+....
Docket No. 50-317
SEP 0 61979
Baltimore Gas and Electric Company
ATTN: Mr. A. E. Lundvall, Jr.
Vice President, Supply
P. O. Box 1475
Baltimore, Maryland 21203
Gentlemen:
Subject:
Inspection 50-317/79-11
This refers to the inspection conducted by Mr. D. Johnson of this office on July
9-13, 1979 at Calvert Cliffs Nuclear Power Plant, Unit 1, Lusby, Maryland, of
activities authorized by NRC License No. DPR-53 and to the discussions of our
findings held by Mr. Johnson with Mr. L. Russell of your staff at the conclusion
of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within
these areas, the inspection consistec of selective examinations o# procedures
and representative records, interviews with personnel, and observations by the
inspector.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full
omplience with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This item of noncompliance
has been categorized into the levels as described in our correspondence to you
dated December 31, 1974. This notice is sent to you pursuant to the provisions
of Section 2.201, of the NRC's " Rules of Practice", Part 2, Title 10, Code of
Federal Regulations. Section 2.201 requires you to submit to this office,
within twenty (20) days of your receipt of this notice, a written statement or
explanation in reply including:
(1) corrective steps which have been taken by
you and the results achieved; (2) corrective steps which will be taken to avoid
further items of noncompliance; and (3) the date when full compliance will be
achieved.
In addition to the need for corrective action regarding this specific
item of noncompliance, we ara concerned about the implementation of your management
control systems that permitted it to occur.
Consequently, in your reply, you
should describe in particular, those actions taken or planned to improve the
effectiveness of your management control systems.
The item of noncompliance shown in the Notice of Violation enclosed with this
letter, is a recurrent or uncorrected item.
In your response please give this
matter your particular attention.
1243
188
7 910310 f 0 4
.
.
Baltimore Gas & Electric Co.
2
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Neal Regulations, a copy of this letter and the enclosures will
be placed in the NRC's Public Document Room.
If this report contains any
information that you (or your contractue) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must be
accompanied by an affidavit executed by the owner of the information, which
identifies the document or part sought to be withheld, and which contains a
statement of reasons which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b)(4) of Section 2.790.
The information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified period, the report.will be placed in the Public
Document Room.
Should you have any questions concerning this inspecticn, we will be pleased to
discuss them with you.
Sincerely,
f
+
B
H. Grier
Director
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcement Inspection
Report Number 50-317/79-11
cc w/encls:
R. M. Douglass, Manager, Quality Assurance
L. B. Russell, Chief Engineer
W. Gibson, General Supervisor, Operations QA
R. C. L. Olson, Senior Engineer
K. H. Sebra, Principal Engineer
1243
189