1.
ge g
B ALTIMORE G AS AND ELECTRIC COMPANY P.O. B O X 14 7 5 B A LTI M O R E. M A R Y L A N D 2120 3 ARTHUR C. LUN OVALL.JR.
vics Passiotat Sums September 20, 1979 Office of Inspection and Enforcement Docket flo. 50-317 U.S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 Attentica:
Mr. Boyce H. Grier, Director Gentlemen:
This refers to your Inspection Report 50-317/79-11 of Seoterr.ber 6, 1979, which transmitted one item of non-compliance noted during the inscection. Enclosure (l) to this letter constitutes a written explanation in reply to this itea of non-comoliance.
Should you have further questions concerning this reply, we would be pleased to discuss them with you.
Very truly y/*
ours,
fl f/
/ /
d f+ w b"
A. E. Lundvall, Jr.
f Vice President - Supply AEL/ RED /dds Enclosure 1243 186 7910310 D1
l v
ENCLOSURE (1)
REPLY TO APPENDIX A 0F NRC, I&E INSPECTION REPORT 50-317/79-11 As set forth by our letter of August 17,1979 ( A. E. Lundvall, Jr. to Boyce H. Grier, regarding I&E Inspection Report 50-317/79-07; 50-318/
79-06), we have instituted several new methods of insuring locked valves in safety related systems are properly lined up initially and remain lined up and locked during operation. These methods include a monthly surveillance of locked valves during operation and a requirement for independent locked valve line-ups when returning from Cold Shutdown.
These measures were instituted on June 1, 1979, and June 20, 1979, respectively. We believe these measures ha'.e resulted in a substantial improvement in our control of locked valves.
In order to insure that the aforementioned controls are fully and properly administered, we have recently instituted a monthly Quality Assurance surveillance of a random portion of the locked valve list.
Such a surveillance will serve to improve the effectiveness of our management control system in this area. This procedure will be continued until it is determined that our present controls are fully effective or that further improvements are called for.
1243 187