05000278/LER-1979-031, Forwards LER 79-031/01T-0

From kanterella
(Redirected from ML19254D696)
Jump to navigation Jump to search
Forwards LER 79-031/01T-0
ML19254D696
Person / Time
Site: Peach Bottom 
Issue date: 10/18/1979
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19254D697 List:
References
NUDOCS 7910290352
Download: ML19254D696 (2)


LER-1979-031, Forwards LER 79-031/01T-0
Event date:
Report date:
2781979031R00 - NRC Website

text

PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101 12151841-400o October 18, 1979 Mr. Boyce H. Grier, Director Of fice of Inspection and Enforcement Region I United States Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406

Dear Mr. Grier:

SUBJECT:

Licensee Event Report Narrative Description The following occurrence was reported to Mr. Greenman, Region 1, Office of Inspection and Enforcement on October 4,1979.

Re ference:

Docket No. 50-278 Report No.

LER 3-79-31/1T Report Date:

October 18, 1979 Occurrence Date:

October 4, 1979 Facility:

Peach Bottom Atomic Power Station R.D. 1, Delta PA 17314 Technical Speci fication Re ference:

Technical Specification 6.9.a(9) requires reporting

" performance of structures, systems, or components that require remedial action or ccrrective measures to prevent. operation in a manner less conservative than assumed in t!'e accident analysis in the sa fety analysis report..."

Descrintion of the Event:

During the seismic anchor inspection program being per-formed in response to IE Bulletin 79-02, a rigid hanger, 3-14-HB-S21, containing two shall type anchor bolts was found detached from the wall.

This hanger is associated with the "B" loop of the Unit 3 Core Spray piping.

The two anchor bolts were replaced with two wedge type anchor bolts.

) 2 2.

q910290 R

Mr. Boyce H. Grier, Director Page 2 Consecuences of Event:

The safety significance of this event is small because Unit 3 reactor is in the cold shutdown condition for refueling.

The system associated with this hanger, "B"

loop of the Unit 3 Core Spray piping, need not be operable under these conditions per Technical Specification 3.5.F.3.

Cause of Event

The most probable cause of failure foc these tuo anchor bolts was improper installation.

Corrective Action

The two failed shell type anchor bolts were replaced with two wedge type bolts. Corrective action has been completed.

Previous Similar Occurrences:

2-79-33/1T, 2-79-35/1T, 3-79-19/1T, 3-79-23/1T, 3-79-25/1T, 3-79-26/1T, 2-79-43/1T, 2-79-44/1T, 3-79-30/1T.

Very truly yours, r

b.J Cooney Supefintendent j

Genbration Division - Nuclear Attachment cc:

Director, NRC - Of fice of Inspection and Enforcement Mr. Norman M. Haller, NRC - Office of Management &