ML19253C672
| ML19253C672 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 10/19/1979 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML19253C665 | List: |
| References | |
| 50-302-79-38, NUDOCS 7912060671 | |
| Download: ML19253C672 (1) | |
Text
.
APPENDIX A NOTICE OF VIOLATION Florida Power Corporation License No. DPR-72 Crystal River 3 Based on the NRC inspection September 24-28, 1979, certain of your activities were apparently not conducted in full compliance with NRC requirements as indi-cated below. These items have been categorized as described in correspondence to you dated December 31, 1974.
As required by Technical' Specifications 4.6.3.1.1, the isolation valves of Table 3.6.1 shall be demonstrated operable prior to returning the valve to service after maintenance, repair or replacement work is performed on the valve or its associated actuator, control or power circuit by performance of a cycling test and verification of isolation time.
Contrary to the above, valves MUV 253 and MSV 148 were not demonstrated operable after maintenance on August 8, 1979 and July 2, 1979, respec-tively, in that no verification of isolation time was performed.
This is an infraction.
1506 205 7 9120 6 0 6 7 f