ML19249C387

From kanterella
Jump to navigation Jump to search

Forwards Safety Evaluation of 790523 Request for Changes to Tech Specs Re Surveillance Requirements of Dc Electrical Power Sys Batteries.Proposed Changes Are Not Acceptable
ML19249C387
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/13/1979
From: Lainas G
Office of Nuclear Reactor Regulation
To: Reid R
Office of Nuclear Reactor Regulation
Shared Package
ML19249C388 List:
References
TAC-11951, NUDOCS 7909100610
Download: ML19249C387 (2)


Text

![g.ecg$%

~

UNITED STATES NUCLEAR REGULATORY COMMISSION E

WASHINGTON, D. C. 20555

$.1 t

8 gG 131979 MEMORANDUM FOR:

R. Reid, Chief, Operating Reactors Branch #4, D0R FROM:

G. Lainas, Chief, Plant Systems Branch, D0R

SUBJECT:

SAFETY EVALUATION OF PROPOSED CHANGES TO TECH!!ICAL SPECIFICATIONS RE:

SIIRVEILLANCE REQUIREMENTS OF DC ELECTRICAL POWER SYSTEMS FOR CRYSTAL RIVER UNIT 3 (TAC 11951)

Plant Name:

Crystal River, Unit 3 Docket No.:

50-302 Responsible Branch:

ORB #4 Project Manager:

C. Nelson Reviewing Branch:

Plant Systems Branch Review Status:

Complete The Florida Power Corporation by letter dated May 23, 1979, submitted a request for changes to the Technical Specifications regarding the surveillance requirements of DC electrical power systems batteries.

The proposed changes are (1) to delete the battery full electrolyte level correction to the specific gravity reading; and (2) to lower the specific gravity limit of the battery electrolyte from 1.200 to 1.195.

The Plant Systems Branch has reviewed the infomation and bases submitted by the licensee.

Based on our review, we have concluded that the proposed changes are not acceptable.

w~-

G. Lainas, Chief Plant Systems Branch Division of Operating Reactors

Enclosure:

As stated

Contact:

S. Rhow X-28077 cc w/ enclosure:

See next page C

  • :)

7 909100 6 /o.r

, cc w/ enclosure:

D. Eisenhut B. Grimes W. Gamill F. Rosa G. Lainas C. Nelson D. Tondi S. Rhow PSB, Section A r'3r.

'i

_.) I