05000366/LER-1979-093-03, /03L-0:on 790818,during Normal Surveillance Procedure for Main Steam Line Pressure Instrument Functional Test & calibr,2B21-N015A Had Setpoint of 835 Psig Decreasing.Caused by Setpoint Drift.Instrument Recalibr

From kanterella
(Redirected from ML19249B836)
Jump to navigation Jump to search
/03L-0:on 790818,during Normal Surveillance Procedure for Main Steam Line Pressure Instrument Functional Test & calibr,2B21-N015A Had Setpoint of 835 Psig Decreasing.Caused by Setpoint Drift.Instrument Recalibr
ML19249B836
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 08/29/1979
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19249B835 List:
References
LER-79-093-03L, LER-79-93-3L, NUDOCS 7909050508
Download: ML19249B836 (1)


LER-1979-093, /03L-0:on 790818,during Normal Surveillance Procedure for Main Steam Line Pressure Instrument Functional Test & calibr,2B21-N015A Had Setpoint of 835 Psig Decreasing.Caused by Setpoint Drift.Instrument Recalibr
Event date:
Report date:
3661979093R03 - NRC Website

text