ML19249B835

From kanterella
Jump to navigation Jump to search
Forwards LER 79-093/03L-0
Date released: 09/20/2019 Download: ML19249B835


LER 79-093/03L-0:on 790818,during Normal Surveillance Procedure for Main Steam Line Pressure Instrument Functional Test & calibr,2B21-N015A Had Setpoint of 835 Psig Decreasing.Caused by Setpoint Drift.Instrument Recalibr
ML19249B836
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 08/29/1979
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19249B836 (1)
Forwards LER 79-093/03L-0
ML19249B834
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 08/29/1979
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19249B834 (1)