ML19249B628

From kanterella
Jump to navigation Jump to search
LER 79-072/01T-0:on 790816,during Mode 1,plant Ascended Into Operational Mode.Caused by Personnel Error.Shift Turnover Checklist Developed
ML19249B628
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/22/1979
From: Cooper J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19249B625 List:
References
LER-79-072-01T, LER-79-72-1T, NUDOCS 7909040613
Download: ML19249B628 (2)


Text