05000302/LER-1979-067-03, /03L-0 on 790723:chloride Concentration in Pressurizer Was 0.18 Ppm.Caused by Steaming Action in Pressurizer During Startup.Spray Flow Increased,Diluting Chlorides to within Spec Limits

From kanterella
(Redirected from ML19249A538)
Jump to navigation Jump to search
/03L-0 on 790723:chloride Concentration in Pressurizer Was 0.18 Ppm.Caused by Steaming Action in Pressurizer During Startup.Spray Flow Increased,Diluting Chlorides to within Spec Limits
ML19249A538
Person / Time
Site: Crystal River 
Issue date: 08/14/1979
From: Cooper J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19249A536 List:
References
LER-79-067-03L, LER-79-67-3L, NUDOCS 7908230548
Download: ML19249A538 (2)


LER-1979-067, /03L-0 on 790723:chloride Concentration in Pressurizer Was 0.18 Ppm.Caused by Steaming Action in Pressurizer During Startup.Spray Flow Increased,Diluting Chlorides to within Spec Limits
Event date:
Report date:
3021979067R03 - NRC Website

text