Notifies That Review of Safeguards Contingency Plan Involves Consideration of Safeguards Issue,Requiring Payment of Class III Fee.Plans Should Be Submitted by 790823
ML19247B697
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 07/03/1979
From: Diggs R
NRC OFFICE OF ADMINISTRATION (ADM)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
References
TAC-10660, NUDOCS 7908130196
Download: ML19247B697 (2)


Text

- b TE R/i DOCKET NOS. 50-245 JUL 0 31979

($$

ilortheast Nuclear Energy Company ATTH: 11r. W. G. Counsil Vice President P.O. Box 270 HartforJ, Connecticut 06101 Gentlenen:

This office has receiveJ a copy of your letter dated March 23, 1979, which transaitted your SafequarJs Continnancy Plan to the Office of luclear Reactor Regulation for review and approval as required by 10 CFP. 50.32(J) and 73.4D(b) of the Ce=iission's regulations.

The Plan is for the Pillstone :luclear Pouar Station Units 1 and 2 under facility Licenses CPP,-21 and f.PR-65.

The submittal was not acconpanied by an approval /anenJnent fee as requiraJ by Section 170.2

of 10 CFR Part 170.

P,equests for approvals an !/or licen,n amantnents such as identified above should be classified in the nanner set forth in Saction 170.22.

Section 170.12(c) requires that your conpany provi t a proposed deterninatica of the altendment (approval) class, state tha basis therefor, and subait the fee with your application for the approval or anendment.

Based on a preliminary review of your Plan, we have datermined that it invo kes consideration of a safeguards issua requiring a Class III fce of $3,000 for one of the units an ! a duplicate fee of sag 3 for the~ other unit.

Fees are payable to the U.S. Nuclear P,equlatory Com.nission by check, draft or money order.

If after the final.cyaluation of your plan is comoleted it is determine <i that it was incorrectly classificJ, you will be refun hd any overpaynant or billed for any additional amount due.

Althounh it is reco,nized that :;illstone Unit 1 is not essentially identical to Unit 2, because of the nature of the item being considered and the fact that both units are on the same site with one major revicu covering both units, we have determined that for this itea your Company should pay a single Class III and a duplicate fee rather than two Class III fees.

I Your current Contingency Plan, and the Guard Training Plans which are to be j

subnitted by Aus:ust P.3.1979, for revieu an i aanroval are not considerad appli-i cations or filings requestei by the Co.:issica for its convenience for the l

purpose of sinplifying or clarifying a license or its appanded Technical l

Specifications.

So.ie of the itens nou required to be subaitted for review l

and approval are as a result of requlations which ucre promulgated prior to the March 23, 1973 revision of Part 170 which aJded the new Section 170.22.

620353 7908130196

l JUL 03 1979 Northeast Nuclear Energy Co.

-2_

Even though a regulation became ef fective prior to Marci 23, 1970, this does not mean that submittals now received and requiring revie' and approval are exempt frou fees.

It we can be of assistance to you, call 301/492-7225.

Sincerely',

Oricir.a1 Signed by:

P.eba 11. Digga Reba M. Diggs Facilities Prograu Coordinator License Fee Managewnt Dranch Office of Administration DISTRIBUTION:

l POR LPDR LFt1B R/F (2)

LFt13 Reactor File (2)

Reg. Reactor File (2)

MGaitanis, RSLB

?! Conner, ORC-4 RIngram, ORB-4 JShea, ORB-2 HSmith, ORB-2 Ri1Diggs, LFM3 tl 62 360 0

1 i

.tFjk3: ADf4 -

-. f 3; A0il.<

RSLBt.

RO*..

..ASee.50-33L for.

i y M u sic ScsPD.oyax..

nClack-

-RFonner concurrena s.

i

.6hd'79 M /"979

/. 179

../. E9..

om.

ft.........

,-... 2....-...->.4 roc roax us o.763 nacu o24e

,