4 pR htGuy
,b, UNITED STATES
[ y 3 v, r ' j NUCLEAR REGULATORY COMMISSION 5.,je
.C WASHING TON, D. C. 20555
[
June 27,1979 Docket No. 50-334 Mr. J.chn 00'. an Vice President Duquesne Light Company 435 Sixth Avenue Pittsburgh, Pennsylvania 15219
Dear Mr. Dolan:
In orcer for "-
mplete our review of the Inservice Inspection Program for +,he Beaver.-
- y Power Station, Unit No.1, as submitted by Duquesne Light Company by letters dated October 20, 1976, October 10, 1977 and July 24, 1978, we will need additional infomation.
Your proposed pro-gram includes portions of Class 2 systems listed below that woula not be subjected to nondestructive examination requirements of IWC-2520 of the 1974 edition through summer 1975 Addenda of Section XI of the ASMB code:
1.
SIS accumulators and associated pipin.
2.
Piping from the high head safety injection punp to the RWSi 3.
Baron injection system 4.
Containment spray system These systems perfom either an emergency core cooling or containment depressurization function and are rroposed for exemptions fron exam-ination requirements in accordance with paragrcphs IWC-1220(b) &
IWC-1220(c) based on water chemistry control or not functioning during nomal plant operation. However, experience has shown that neither water chemistry control nor system inoperation during nomal plant operation will preclude the potential for cou1ponent or piping failure.
Because of the importance of the above listed systems to plant safet; it is our position that they must be examined to the require-nent's of IWC-2520 as an augmented examination requirement pursuant to 10 CFR 50.55a(g)(6)(ii). Any examination exemptions that you wish to propose for toe systems should be addressed in regards to the imprac-ticality of the requirement with adequate supporting justifications.
. o
) L 79081)30
Mr. John Dolan An examination plan for these systems and justification for such pro-posed exemptions should be submitted to the NRC within thirty (30) days following receipt of this letter.
If you have any questions, please contact us.
Si ncerely, jutull &
f.
A. 'Schwencer, Chief Operating Reactors Branch #1 Division of Operating Reactors
'i'
.) [
w Mr. John Dolan Duquesne Light Company June 27,1979 cc:
Mr. Joseph H. Mills, Acting Commissioner State of West Virginia Department of Labor 1900 Washington Street East Charleston, West Virginia 25305 N. H. Dyer, M.D.
State Director of Health State Department of Health State Office Building No. I 1800 Washirgton Street, East Charleston, West Virginia 25305 Director, Technical Assessment Division Office of Radiation programs ( AW 459)
U. S. Environmental ?rotectic, Agency Crystal Mall #2 A r'. i ngt on, Vi rgi ni a 20460 U. S. Environmental Protection Agency Region III Office ATTN:
EIS COCRDINATCR Curtis Building - 6th Floor Philadelphia, Pennsylvania 19106 Governor's Office of State Planning and Development ATTN:
Coordinator, Pennsylvania State Clearinghouse P. O. Box 1323 Harrisburg, Pennsylvania 17120 Attorney General Department of Justice Capital Annex Ha rrisburg, Pennsylvania 17120
.O 3[L
-t / /