Forwards Inservice Insp Rept Beaver Valley Power Station Unit 1,Outage 6, for 1987-1988.Rept Concern ASME Class 1,2 & 3 Components Examined During Sixth Refueling Outage at Facility
ML20154P169
Person / Time
Site: Beaver Valley
Issue date: 05/23/1988
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20154P171 List:
References
TAC-07121, TAC-7121, NUDOCS 8806030234
Download: ML20154P169 (1)


Text

t

- g 4

W!ay Power Staten

'4 y

SYppingpert, PA 150770)04 vi"fM-ow 14121 643 5256 May 23, 1988 U.

S. Nuclear Regulatory Commission Atta:

Document Control Desk Washington, DC 20555

Reference:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-63 Sixth Refueling Outage Inservice Inspection Report Gentlemen; This letter forwards the Inservice Inspection Report on ASME Class 1,

2 and 3

components examined during the sixth refueling outage at Beaver Valley Unit No. 1.

The ASME Boiler and Pressure Vessel

Code,Section XI, Article IWA-6220, paragraph (b) requires that an inservice inspection report be submitted to the enforcement and regulatory authority having jurisdiction at the plant site within ninety (90) days after completion of an inservice inspection.

The latest inservice inspections at Beaver Valley Unit No.

1 were completed on February 26, 1988.

These examinations are part of Interval 1, Period 3 of the Beaver Valley Unit No. 1 ISI inspection schedule.

The inservice inspections were performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code, 1974 edition through summer 1975 addenda.

Please cor. tact my office if you have any questions regarding the attached report.

Sincerely,

$4

. D. Sieber

[VicePresident Nuclear Group Attachment cc:

Mr. J. Beall, Sr. Resident Inspector gq' Mr. W. T.

Russell, NRC Region I Administrator Mr.

P. Tcm, Project Manager I l 8806030234 890523 R

ADOCK 05000334 DCD

-