ML19247A124
| ML19247A124 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 05/22/1979 |
| From: | Spencer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Strand N WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML19247A125 | List: |
| References | |
| NUDOCS 7907300098 | |
| Download: ML19247A124 (2) | |
See also: IR 05000508/1979004
Text
t4R REGO
[y
k
UNITE D STATES
-
.
I
NUCLEAR REGULATORY COMM!SSION
E',
,
g
.
.
n
.5
REGION V
0,,
_f
g
1990 N. CALIFORNIA COULEVARD
,
h#
d
SulTE 202, WALNUT CREEK PLAZA
- ,,,*
WALNUT CREEK, CALLFORNIA 9459G
P.AY 2 2 373
Docket flos. 50-508
50-509
Washington Public Pawer Supoly System
P. O. Box 468
Richland, Washington 99352
Attention: Mr. fl. O. Strand
Managing Director
Gentlemen:
Subj ect:
flRC Inspection at Wi!P 3/5 Site
This refers to the inspection conducted by Messrs. D. F. Kirsch, and T. W. Hutson
of this office on April 17-20, 1979, of act:vities authorized by flRC Construction
Permit flos. CPPR-154 and CPPR-155, and to the discussion of our findings held by
Mr. Kirsch with Mr. W. J. Talbott and other members of your staff at the conclu-
sion of the inspection.
Areas examined during this inspection are descri ed in the enclosed inspection
report. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and observa-
tions by the inspectors.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with flRC requirements, as set forth in the
flotice of Violation, enclosed herewith as Appendix A.
This item of noncompliance
has been categorized into a level as described in our correspondence to all NRC
licensees dated December 31, 1974.
This notice is sent to you pursuant to the provisions of Section 2.201, of the
llRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Sec-
tion 2.201 requires you to submit to this office, within thirty (30) days of
your receipt of this notice, a written statement or explanation in reply includ-
ing (1) corrective steps which have been taken by you and the results achieved;
(2) corrective steps which will be taken to avoid further violMions; and (3)
the date when full compliance will be achieved.
490
068
to07300o TE
.
.
Washington Publ'c Power Supply System
-2-
p &; 379
In your reply to this letter and in addition to your response to the specific
item of noncompliance, please inform ts of the steps taken to assure that commit-
ments made to the NRC in response to flotices of Violation are fully met. During
this inspection, we found that commitments in your letter to us of February 21,
1979, regarding procedural changes and timely submittal of Pittsburgh Testing
Laboratory test records to your architect-engineer had not been met.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you believe to be proprietary, it is
necessary that you submit a written application to this office, within 30 days
of the date of this letter, requesting that such infomation be withheld from
public disclosure. The application must include a full statement of the reasons
why it is claimed that the information is proprietary. The application should
be prepared so that any proprietary information identified is contained in an
enclosure to the application, since the application without the enclosure will
also be placed in the Public Document Room.
If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
Should you have any questions concerning this inspection, we will be glad to
discuss them with you.
Sincerely,
_)
f"
G. S. Spencer, Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A - Notice of Violation
2.
IE Inspection Report
Mos. 50-508/79-04
50-509/79-03
cc w/o enclosure 2:
M. E. Witterspoon, Division Manager
Qualit.s Assurance, WPPSS
cc w/ enclosures 1 & 2:
W. J. Talbott, Division Manager, WPPSS
490
069