lT L
'
e
UNITED STATES
g8R800
NUCLEAR REGULATORY COMMISSION
g
,o
REGloN Il
O
3c -
o
$
101 M ARIETTA STREET, N.W.
7
M'
3
4 )h !
ATLANTA. GEORGI A 30303
o9
%.%. . . . ,5
4
MAY 141979
In Reply Refer To:
RII:WHM
50-324/79-17
50-325/79-17
Carolina Power and Light Company
Attn:
J. A. Jones, Executive Vice President
at.d Chief Operating Officer
411 Fayetteville Street
Raleigh, North Carolina 27602
Gentlemen:
This refers to the inspection conducted by W. H. Miller, Jr. of this
office on April 16-20, 1979 of activities authorized by h3C License Nos.
DPR-71 and DPR-62 for the Brunswick Steam Electric Plant facility,
Units 1 and 2, and to the discussion of our findings held with A. C. Tollison,
Jr. at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with per onnel, and observations by the inspector.
Two new unresolved items resulted from this inspection and are discussed
in the enclosed report. These items will be examined during subsequent
inspections.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with h3C requirements.
Two items
and references to pertinent requirements are listed in the Notice of
Violation enclosed herewith as Appendix A.
This notice is sent to you
pursuant to the provisions of Section 2.201 of the NRC's " Rules of
Practice", Part 2, Title 10, Code of Federal Regulations.
Section 2.20]
requires you to submit to this office, within 20 days of your receipt of
this notice, a written statement or explanation in reply including:
(1)
corrective steps which have been taken by you, and the results achieved;
(2) corrective steps which will be taken to avoid further nor. compliance;
and (3) the date when full compliance will be achieved.
f
During the inspection it was found that certain activities under your
license appear to deviate f rom co::mitments to the Cocaission and have
.
safety significance. This item is identified in the Notice of Deviation
ene'losed herewith as Appendix B.
Please provide us in writing within 20
days of your receipt of this letter your comments including a description
of corrective actions that have been or will be taken, corrective actions
which will be taken to avoid further deviations, and the date corrective
actions were or vill be completed.
368
239
790724& b
-
,
-
,
,
MAY 141979
.
Carolina Power and
Light Company
-2-
In accordance with Section 2.790 of the NRC's " Pules of Practice,"
Part 2, Title 10, Code of Federal Regulations,
copy of this letter and
the enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any information that yvu (or your contractor)
believe to be proprietary, it is necessary that you make a written
application within 20 days to this office to withhold such information
from public disclosure. Any such application must include a full state-
ment of the reasons on the basis of which it is claimed that the informa-
tion is proprietary, and should be prepared so that proprietary information
ideutified in the application is contained in a separate part of the
document.
If we do not hear from you in this regard within the specified
period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
/
<
Ch irles E. Murphy, Chief
Reactor Construction and
-
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Appendix B, Notice of Deviation
3.
Inspection Report Nos. 50-324/79-17
and 50-325/79-17
cc w/ enclosures:
A. C. Tollison, Jr.
Plant Manager
Box 458
Southport, North Carolina 28461
.
.
.
363
240
.
~
-g