Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/21/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19225B182 List:
References
NUDOCS 7907240272
Download: ML19225B195 (2)


See also: IR 05000424/1979007

Text

)

.

[p nuc

o

'o

UNITED STATES

E',

/ ,'n

NUCLEAR REGULATORY COMMISSION

.

c7

E

REGION 11

' '--

i.

$

f

101 MARIE TT A sT., N W., SUIT E 3100

j

AT LANTA, GEORGIA 30303

s,

.....

In Reply Refer To:

RII:MJG

50-424/79-7

50-425/79-7

Georgia Power Company

ATTN:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

This refers to the inspection conducted by M. J. Gouge of this office on

April 25-27, 1979, of activities authorized by NRC Construction Permit Nos.

CPPR-108 and CPPR-109 for the Alvin W. Vogtle Nuclear facility, Units 1 and 2

and to the discussion of our findings held with D. M. Fiquett at the conclusion

of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed

herewith as Appendix A.

This notice is sent to you pursuant to the provisions

of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations.

Section 2.201 requires you to subr.; t to this office,

within 20 days of your receipt of this notice, a written statement or explana-

tion in reply including:

(1) corrective steps which have been taken by you

and the results achieved; (2) corrective steps which will be taken to avoid

further noncompliance; and (3) the date when full compliance will be achieved.

During the inspection it was found that certain activities under your license

appear to deviate from commitments to the Commission and have safety signifi-

cance.

This item is identified in the Notice of Deviation enclosed herewith

as Appendix B.

Please provide us in writing within 20 days of your receipt

of this letter your comments including a description of corrective actions

that have been or will be taken, corrective actions which will be taken to

avoid further deviations, and the date corrective actions were or will be

completed.

790724cMz

415

158

MAY 211979

.

Georgia Power Company

-2-

-

It is our understanding based en discursions held during the exit interview

that no Cate6ory I concrete would be placed with a 91-day design strength

where the PSAR specifies a 28-day design strength requirement pending resolu-

tion of the deviation discussed above.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room. If this

report centains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20

days to this of rice te withhold such information from public disclosure. Any

such application must include a full statement of the reasons on the basis of

which it is claimed that the information is proprietary, and should be prepared

so that proprietary information identified in the application is contained in

a separate part of the document . If we do not hear from you in this regard

within the specified period, the report will be placed in the Public Document

Room.

Should yo i have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

C. E. Murphy, Chi-

Reactor Construction aud

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Appendix B, Notice of Deviation

3.

Inspection Report Nos. 50-424/79-7

and 50-425/79-7

cc w/ enc 1:

K. M. Gillespie,

Construction Project Manager

P. O. Box 282

Waynesboro, GA 30830

E. D. Grover

QA Site Supervisor

P. O. Box 282

Waynesboro, GA 30830

415