Forwards IE Insp Repts 50-413/79-06 & 50-414/79-06 on 790403-06 & Notice of Violation
ML19225A405
Person / Time
Site: Catawba  
Issue date: 05/02/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dail L
DUKE POWER CO.
Shared Package
ML19225A388 List:
References
NUDOCS 7907190137
Download: ML19225A405 (2)


See also: IR 05000413/1979006

Text

.

.,

P

UNITED STATES

[pm Mo

oq

NUCLEAR REGULATORY COMMISSION

og

,

R EGION ll

&

3p

o

$

101 M ARIETTA STREET, N.W.

7

A

3

k

ATLANTA, G EoRGI A 3o303

MAY 0 2 879

In Reply Refer To:

RII:WPA

50-413/79-6

50-414/79-6

Duke Power Company

ATTN:

L. C. Dail, Vice President

Design Engineering

P. O. Box 33189

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by W. P. Ang of this office on

April 3-6, 1979, of activities authorized by NRC Construction Permit Nos.

CPPR-116 and CPPR-117 for the Catawba Nuclear Power Station facility, and to

the discussion of our findings held with D. G. Beam at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your

These items and

license appear to be in noncompliance with NRC requirements.

references to pertinent requirements are listed in the Notice of Violation

enclosed herewith as Appendix A.

This notice is sent to you pursuant to the

provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10,

Code of Federal Regulations. Set; ion 2.201 requires you to submit to this

office, within 20 days of your receipt of this notice, a written statement or

explanation in reply including:

(1) corrective steps which have been taken

by you and the results achieved; (2) corrective steps which will be taken to

avoid further noncompliance; and (3) the date when full compliance will be

achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

If this

inspection report will be placed in the NRC's Public Document Room.

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20

days tc this office to withhold such information f rom public disclosure. Any

such application must include a full statement of the reasons on the basis of

which it is claimed that the information is proprietary, and should be prepared

so that proprietary information identified in the application is contained in

a separate part of the document.

If we do not hear from you in this regard

within the specified period, the report will be_plaped in the Public Document

Room.

,') ; tJ

7907190/37 h

.

' .

e

o.

- ~ -

-

-

-

.

. .

.

.

MAY U 21979

.

Duke Power Company

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

Charles E. Murphy, Chief

Reactor Construction and Engineering

S2pport Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 30-413/79-6

and 50-414/79-6

cc w/ enc 1:

D. G. Beam, Project Manager

P. O. Box 223

Clover, SC 27910