MONTHYEARML19339A0741978-04-11011 April 1978 Forwards to All Licensees Current NRC Guidance Re Radiological Environ Monitoring.Branch Technical Position Encl Project stage: Other ML13333A3511979-01-18018 January 1979 Forwards Staff Recommendations Re General Contents of Offsite Dose Calculation Manual to Be Submitted W/Proposed Radiological Effluent Tech Specs.Ltr Addressed to All Power Reactor Licensees Project stage: Other ML19282B5281979-03-0808 March 1979 Notification That License Amend Application to Incorporate Requirements of 10CFR50 App I Into Tech Specs Will Not Be Completed by Requested Date of 780315 Project stage: Request ML15245A1331979-09-17017 September 1979 Informs That Effective Date for Implementation of EPA Std for LWR U Fuel Cycle Is 791201.Requests Compliance W/ Radiological Effluent Tech Spec Implementing LWR Provisions. Method for Implementation Requested by 791101 Project stage: Other ML19211A8161979-12-0404 December 1979 Notifies That Rept Required by Tech Specs 2.4.1.8 & 2.4.3.3 App B Should Include Dose Assessment W/Respect to Conformance W/Code Project stage: Other ML19294B3201980-01-0909 January 1980 Safety Evaluation Re zirconium-water Correction to ECCS Analysis.Nrc Considers ECCS Reanalysis Acceptable for Plant Operation W/Up to 1% of Steam Generator Tubes Plugged Project stage: Approval ML19323C5621980-05-14014 May 1980 Application for Amend 46 to Ol,Providing Proposed Tech Spec Changes.Revisions Include Addition of safety-related Hydraulic Snubbers to Table 3.7-4 & Mod of Surveillance Requirements for Auxiliary Feedwater Sys.Affidavit Encl Project stage: Request ML19350E6891981-05-31031 May 1981 Revised Process Control Program Project stage: Other ML19350E6861981-06-18018 June 1981 Application to Amend License DPR-66,submitted as Proposed Revision to Amend 36 of Tech Spec App A,Permitting Use of Radiological Access Control Permit to Control Entry Into Plant Areas.Forwards Revised Process Control Program Project stage: Request ML19350E6881981-06-18018 June 1981 Proposed Tech Specs 6.12.1,6.12.2 & 6.13 Re Administrative Controls & Radiological Environ Monitoring Program Project stage: Other ML20027C8211982-10-22022 October 1982 Revised Application for Amend to License DPR-66, Incorporating Proposed Radiological Effluent Tech Specs Into App a Project stage: Request ML20027C8191982-10-22022 October 1982 Forwards Revised Application for Amend to License DPR-66, Consisting of Proposed Change Request 36,Revision 3, Incorporating Radiological Effluent Tech Specs Into App A. Offsite Dose Calculation Manual & App B Will Follow Project stage: Request ML20070B3471982-12-0101 December 1982 Forwards Revision to Beaver Valley Unit 1 Offsite Dose Calculation Manual, Supporting 821022 Revision 3 to Proposed Tech Spec Change 36.Revisions to Section 2.2.2, Deleting Refs to Food & Ground Pathways,Forthcoming Project stage: Other ML20072B1141983-02-0303 February 1983 Radiological Effluent Tech Spec Implementation (A-2), Beaver Valley Power Station Unit 1, Technical Evaluation Rept Project stage: Other ML20072R8311983-03-28028 March 1983 Amend 66 to License DPR-66 Establishing New Limiting Conditions for Operation for Quarterly & Annual Average Release Rates Project stage: Other ML20151H5231983-04-26026 April 1983 Revised Pages to Amend 66 to License DPR-66 Incorporating Liquid Effluent Monitoring Instrumentation Into Tech Specs Project stage: Other ML20071Q6461983-05-25025 May 1983 Rev to Amend 66 to License DPR-66,consisting of Tech Spec Page Changes to Correct Administrative Errors Project stage: Other 1981-05-31
[Table View] |
Text
kQ C,
[,I UNITED STATES 79 e(
p, NUCLEAR REGULATORY COMMISSION s -l 7 WASHINGTON, D. C. 20555 s, m /
December 4, 1979 Docket No. 50-334 Mr. C. N. Dunn, Vice President Operations Division Duquesne Light Company 435 Sixth Avenue Pittsburgh, Pennsylvania 15219
Dear Mr. Dunn:
In your letter dated October 29, 1979, Duquesne Light Company provided an interim comitment for demonstrating compliance with 40 CFR 190 at the Beaver Valley Power Station Unit No.1.
The purpose of this letter is to infom you that the report required by Technical Specifications 2.4.1.8 and/or 2.4.3.3 in Apperd_ix B of your Facility Operating License, DPR-66, should include a dose assessaient with respect to conformance with 40 CFR 190, or whenever a variance to 40 CFR 190 is projected.
Sincerely,
/
- h. haNel2q A. Schwencer, Chief Operating Reactors Branch #1 Division of Operating Reactors cc: See next page 1635 332 7 912a2 0 /2(
Mr. C. N. Dunn Duquesne Light Company December 4,1979 cc: Gerald Charnoff, Esquire Mr. James A. Werling Jay E. Silberg. Esquire P1 ant Superintendent Shaw, Pittman, Potts and Trowbridge Beaver Valley Power Station 1800 M Street, N.W.
P. O. Box 4 Washington, D. C.
20036 Shippingport, Pennsylvania 15077 Karin Carter, Esquire Mr. John A. Levin Special Assistant Attorney General Public Utility Commission Bureau of Administrative Enforcement P. O. Box 3265 5th Floor, Executive House Harrisburg, Pennsylvania 17120 Harrisburg, Pennsylvania,17120 Mr. Roger Tapan Stone and Webster Engineering Corporation P. O. Box 2325 Boston, Massachusetts 02107 Mr. J. D. Woodward R & D Center Westinghouse Electric Corporation Building 7-303 Pittsburgh, Pennsylvania 15230 B. F. Jones Memorial Library 663 Franklin Avenue Aliquippa, Pennsylvania 15001 Mr. Jack Carey Technical Assistant Duquesne Light Company P. O. Box 4 Shippingport, Pennsylvania 15077 Mr. R. E. Martin Duquesne Light Conpany 435 Sixth Avenue Pittsburgh, Pennsylvania 15219 Marvin Fein Utility Counsel City of Pittsburgh 313 City-County Building Pittsburgh, Pennsylvania 15219 1635 333