Forwards IE Insp Repts 50-317/79-08 & 50-318/79-07 on 790521-25 & Notice of Violation
ML19209C541
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 08/08/1979
From: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML19209C531 List:
References
NUDOCS 7910160106
Download: ML19209C541 (3)


See also: IR 05000317/1979008

Text

.

.,

UNITED STATES

pgg

,

p

o

NUCLEAR REGULATORY COMMisslON

[

R EGION 1

o

$

j

638 PARK AVENUE

'

KitaC OF PRUSSI A PENN5YLVANIA 19406

%,

/

MG8

mg

Docket Nos. 50-317

50-318

Baltimore Gas and Electric Company

ATTN: Mr. A. E. Lundvall, Jr.

Vice President, Supply

P. O. Box 1475

Baltimore, Maryland 21203

Gentlemen:

Subject:

Combined Inspection 50-317/79-08 and 50-318/79-07

This refers to the inspection conducted by Mr. L. Thonus of this office on May

21-25, 1979 at the Calvert Cliffs Nuclear Power Station, Units 1 and 2, Lusby,

Maryland of activities authorized by NRC License Nos. DPR-53 and DPR-69 and to

the discussions of our findings held by Mr. Thonus with Mr. L. B. Russell of

your staff at the conclusion of the inspection, and to a subsequent telephone

discussion between Mr. Thonus of my staff and Mr. A. J. Kaupa of your staff on

May 30,1979 and Mr. L. B. Russell of your staff on June 14, 1979.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, measurements made by the

inspector, and observations by the inspector.

In addition our inspector reviewed the additional information provided in your

response letter (not dated) to Item B contained in Appendix A, Notice of Violation,

dated September 13, 1978.

Based on inspector review of the additional information supplied, we hereby

withdraw the item of noncompliance identified as Item B contained in tha cbove

Notice of Violation, and accordingly this will be reflected in our records.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A.

This item of noncompliance

has been categorized into the levels as described in our correspondence to you

dated December 31, 1974.

This notice is sent to you pursuant to the provisions

of Section 2.201 of the NRC's " Rules of Practice", Part 2, Title 10, Code of

Federal Regulations.

Section 2.201 requires you to submit to this office,

1147

201

7910180 / 0 4

O

.

'

-

.

Baltimore Gas and Electric

Company

2

within twenty (20) days of your receipt of this notice, a written statement or

explanation in reply including:

(1) corrective steps which have been taken by

you and the results achieved; (2) corrective steps which will be taken to avoid

further items of noncompliance; and (3) the date when full compliance will be

achieved.

Item number A shown in the Notice of Violation enclosed with this letter, is a

recurrent or uncorrected item.

In your response please give this matter your

particular attention.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Lode of Federal Regulations, a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room.

If this report contains any

infomation that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such infomation from public disclosure.

Any such application must be

accompanied by an affidavit executed by the owner of the informtior., which

identifies the document or part sought to be withheld, and which contains a

statement of reasans which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b)(4) of Section 2.790.

The information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

A

J

t&ug .

G

ge

mith, Chief

.

F 1

cility and Materials

Safety Branch

Enclosures:

1.

Append h A, Notice of Violation

2.

Office of Inspection and Enforca. ment Combined Inspection

Report Numbers 50-317/79-08; 50-313/79-07

1147

202

.

Baltimore Gas and Electric

Company

3

ccw/encis:

R. M. Douglass, Manager, Quality Assurance

L. B. Russell, Chief Engineer

W. Gibson, General Supervisor, Operations QA

R. C. L. Olson, Senior Engineer

K. H. Sebra, Principal Engineer

.