UNITED STATES
pgg
,
p
o
NUCLEAR REGULATORY COMMisslON
[
R EGION 1
o
$
j
638 PARK AVENUE
'
KitaC OF PRUSSI A PENN5YLVANIA 19406
%,
/
MG8
mg
Docket Nos. 50-317
50-318
Baltimore Gas and Electric Company
ATTN: Mr. A. E. Lundvall, Jr.
Vice President, Supply
P. O. Box 1475
Baltimore, Maryland 21203
Gentlemen:
Subject:
Combined Inspection 50-317/79-08 and 50-318/79-07
This refers to the inspection conducted by Mr. L. Thonus of this office on May
21-25, 1979 at the Calvert Cliffs Nuclear Power Station, Units 1 and 2, Lusby,
Maryland of activities authorized by NRC License Nos. DPR-53 and DPR-69 and to
the discussions of our findings held by Mr. Thonus with Mr. L. B. Russell of
your staff at the conclusion of the inspection, and to a subsequent telephone
discussion between Mr. Thonus of my staff and Mr. A. J. Kaupa of your staff on
May 30,1979 and Mr. L. B. Russell of your staff on June 14, 1979.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, measurements made by the
inspector, and observations by the inspector.
In addition our inspector reviewed the additional information provided in your
response letter (not dated) to Item B contained in Appendix A, Notice of Violation,
dated September 13, 1978.
Based on inspector review of the additional information supplied, we hereby
withdraw the item of noncompliance identified as Item B contained in tha cbove
Notice of Violation, and accordingly this will be reflected in our records.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This item of noncompliance
has been categorized into the levels as described in our correspondence to you
dated December 31, 1974.
This notice is sent to you pursuant to the provisions
of Section 2.201 of the NRC's " Rules of Practice", Part 2, Title 10, Code of
Federal Regulations.
Section 2.201 requires you to submit to this office,
1147
201
7910180 / 0 4
O
.
'
-
.
Baltimore Gas and Electric
Company
2
within twenty (20) days of your receipt of this notice, a written statement or
explanation in reply including:
(1) corrective steps which have been taken by
you and the results achieved; (2) corrective steps which will be taken to avoid
further items of noncompliance; and (3) the date when full compliance will be
achieved.
Item number A shown in the Notice of Violation enclosed with this letter, is a
recurrent or uncorrected item.
In your response please give this matter your
particular attention.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Lode of Federal Regulations, a copy of this letter and the enclosures will
be placed in the NRC's Public Document Room.
If this report contains any
infomation that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such infomation from public disclosure.
Any such application must be
accompanied by an affidavit executed by the owner of the informtior., which
identifies the document or part sought to be withheld, and which contains a
statement of reasans which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b)(4) of Section 2.790.
The information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
A
J
t&ug .
G
ge
mith, Chief
.
F 1
cility and Materials
Safety Branch
Enclosures:
1.
Append h A, Notice of Violation
2.
Office of Inspection and Enforca. ment Combined Inspection
Report Numbers 50-317/79-08; 50-313/79-07
1147
202
.
Baltimore Gas and Electric
Company
3
ccw/encis:
R. M. Douglass, Manager, Quality Assurance
L. B. Russell, Chief Engineer
W. Gibson, General Supervisor, Operations QA
R. C. L. Olson, Senior Engineer
K. H. Sebra, Principal Engineer
.