a
- ,
p nia
UNITED STATES
o
NUCLEAR REGULATORY COMMisslON
3
)p
g
REGION I
$
g
431 PARK AVENUE
1"
KING OF PRUS$3A, PENNSYLVANIA 19406
O
.....#
Docket Nos. 50-317
AUG
S 19 73
50-318
Baltimore Gas and Electric Company
ATTN: Mr. A. E. Lundvall, Jr.
Vice President, Supply
P. O. Box 1475
Baltimore, Maryland 21203
Gentlemen:
Subject:
Inspection 50-317/79-07 and 50-318/79-06
This refers to the inspection conducted by Mr. D. Johnson of this office on
May 1-11, 1979 at Calvert Cliffs Nuclear Power Plant, Units 1 and 2, Lusby,
Maryland of activities authorized by NRC License Nos. DPR-53 and DPR-69 and to
the discussions of our findings held by Mr. Johnson with Mr. R. Denton of your
staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This item of noncom-
pliance has been categorized into the levels as described in our correspondence
to you dated December 31, 1974.
This notice is sent to you pursuant to the
provisions of Section 2.201 of the NRC's " Rules of Practice", Part 2, Title 10,
Code of Federal Regulations.
Section 2.201 requires you to submit to this
office, within twenty (.20) days of your receipt of this notice, a written
statement or explanation in reply including:
(1) corrective steps which have
been taken by you and the results achieved; (2) corrective steps which will be
taken to avoid further items of noncompliance; and (3) the date when full
compliance will be achieved.
Item number A shown in the Notice of Violation enclosed with this letter, is a
recurrent or uncorrected item.
In your response please give this matter your
particular attention.
i'
\\
171
7910120l 4
.
.
Baltimore Gas and Elect:ic Co.
2
/WG
g;g
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosures will
be placed in the NRC's Public Document Room.
If this report contains any
information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written upplication within 20 days to this office to
withhold such information from public disclosure.
Any such application must be
accompanied by an affidavit executed by the owner of the infonnation, which
identifies the document or part sought tc be withheld, and which contains a
statement of reasons which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b)(4) of Section 2.790.
The information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
.
f
4
N
,
Eldon J. Brunner, Chie
Reactor Operations and Nuclear
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcement Inspection
Report Number 50-317/79-07, 50-318/79-06
cc w/encls:
R. M. Douglass, Manager, Quality Assurance
L. B. Russell, Chief Engineer
W. Gibson, General Supervisor, Operations QA
R . C . I. . Olson, Senior Engineer
K. H. Sebra, Principal Engineer
- '
\\
172