ML19208D637
| ML19208D637 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 05/18/1979 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML19208D634 | List: |
| References | |
| NUDOCS 7909290143 | |
| Download: ML19208D637 (2) | |
See also: IR 05000321/1979011
Text
a
4
UNITED sT ATEs
kmR80uqjo
NUCLEAR REGULATORY COMMISSION
g
E
REGloN il
o
O
$
101 M ARIETTA STREET. N.W.
2
ATL ANT A. GEORGI A 3o303
\\...../
MAY l 81979
In Reply Refer To:
RII:RFRIII
50-321/79-11
0 gI
' pI ' k
50-366/79-15
ur
O
M
b I
a [ [T
Georgia Power Company
$
ATTN:
J. H. Miller, Jr.
,C,
Executive Vice President
270 Peachtree Street
Atlanta, GA 30303
Gentlemen:
This refers to the inspection conducted by R. F. Rogers of this office on
March 13 - April 6, 1979, of activities authorized by NRC Operating License
No. DPR-57 and License No. NPF-5 for the Plant Hatch facilities, and to the
discussion of our findings held with M. Manry periodically during the
inspection interval.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
During the inspection, it was found that certain activities under yc_r
license appear to be in noncompliance with NRC requirements. These items and
references to pertinent requirements are listed in the Notice of Violation
enclosed herewith as Appendix A.
This notice is sent to you pursuant to the
provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10,
Code of Federal Regulations.
Section 2.201 requires you to submit to this
office, within 20 days of your receipt of this notice, a written statement or
explanation in reply including:
(1) corrective steps which have been taken
by you and the results achieved; (2) corrective steps which will be taken to
avoid further noncompliance; and (3) the date when full compliance will be
achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20
dt.s to this office to withhold such information from public disclosure. Any
such application must include a full statement of the reasons on the basis of
which it is claimed that the information is proprietary, and should be prepared
so that proprietary information identified in the application is contained in
a separate part of the document.
If we do not hear from you in this regard
within the specified period, the report will be placed in the Public Document
Room.
1055
139
7909290 /4/ 3
.
.
.
\\
Georgia Power Company
-2-
,, v
s 137;
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
d
ll
&
ewi(A[ ting [bbief
.
React r Operations and Nuclear
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-321/79-11
and 50-366/79-15
cc w/encls:
M. Manry, Plant Manager
P. O. Box 442
Baxley, GA 31513
L. L. Gray, Jr.
Construction Project Manager
P. O. Box 329
Baxley, GA 31513
C. E. Belflower
Site QA Supervisor
P. O. Box 442
Baxley, GA 31513
"III
, ,k
E.
.
I