Forwards IE Insp Repts 50-321/79-11 & 50-366/79-15 on 790313-0406 & Notice of Violation
ML19208D637
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 05/18/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19208D634 List:
References
NUDOCS 7909290143
Download: ML19208D637 (2)


See also: IR 05000321/1979011

Text

a

4

UNITED sT ATEs

kmR80uqjo

NUCLEAR REGULATORY COMMISSION

g

E

REGloN il

o

O

$

101 M ARIETTA STREET. N.W.

2

ATL ANT A. GEORGI A 3o303

\\...../

MAY l 81979

In Reply Refer To:

RII:RFRIII

50-321/79-11

0 gI

' pI ' k

50-366/79-15

ur

O

M

b I

a [ [T

Georgia Power Company

$

ATTN:

J. H. Miller, Jr.

,C,

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

This refers to the inspection conducted by R. F. Rogers of this office on

March 13 - April 6, 1979, of activities authorized by NRC Operating License

No. DPR-57 and License No. NPF-5 for the Plant Hatch facilities, and to the

discussion of our findings held with M. Manry periodically during the

inspection interval.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

During the inspection, it was found that certain activities under yc_r

license appear to be in noncompliance with NRC requirements. These items and

references to pertinent requirements are listed in the Notice of Violation

enclosed herewith as Appendix A.

This notice is sent to you pursuant to the

provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10,

Code of Federal Regulations.

Section 2.201 requires you to submit to this

office, within 20 days of your receipt of this notice, a written statement or

explanation in reply including:

(1) corrective steps which have been taken

by you and the results achieved; (2) corrective steps which will be taken to

avoid further noncompliance; and (3) the date when full compliance will be

achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20

dt.s to this office to withhold such information from public disclosure. Any

such application must include a full statement of the reasons on the basis of

which it is claimed that the information is proprietary, and should be prepared

so that proprietary information identified in the application is contained in

a separate part of the document.

If we do not hear from you in this regard

within the specified period, the report will be placed in the Public Document

Room.

1055

139

7909290 /4/ 3

.

.

.

\\

Georgia Power Company

-2-

,, v

s 137;

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

d

ll

&

ewi(A[ ting [bbief

.

React r Operations and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-321/79-11

and 50-366/79-15

cc w/encls:

M. Manry, Plant Manager

P. O. Box 442

Baxley, GA 31513

L. L. Gray, Jr.

Construction Project Manager

P. O. Box 329

Baxley, GA 31513

C. E. Belflower

Site QA Supervisor

P. O. Box 442

Baxley, GA 31513