ML19208D523
| ML19208D523 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 03/29/1979 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML19208D515 | List: |
| References | |
| 50-334-79-05, 50-334-79-5, NUDOCS 7909280541 | |
| Download: ML19208D523 (2) | |
Text
.
APPENDIX A NOTICE OF VIOLATION Duquesne Light Company Docket No. 50-334 Based on the results of an NRC inspection conducted on February 27 -
March 2,1979, it appears that certain of your activities were not conducted in full compliance with NRC regulations and the conditions of your NRC Facility License No. DPR-66, as indicated below.
These items are categorized as Infractions.
A.
Section 6.8.1 of the Appendix A, Technical Specifications (TS) requires, ir. part, that procedures pertinent to emergency planning be implemented.
BVPS Emergency Preparedness Plan, Appendix C,
" Emergency Equipment Checklist and Calibration Procedure," Issue 4, written pursuant to the above requirement, specifies, in part, that respirators and cartridges be checked according to the BVPS Radcon Manual, Chapter 3, Part 10.
The Radcon Manual requires that outdated respirator cartridges be replaced promptly.
Contrary to these requirements, respirator cartridges in Emergency Kits 4 and 5, at the remote emergency control center, became outdated in October 1977 and were not rcplaced until November 4,1978.
~
B.
Section 6.8.1 of the Appendix A, TS requires, in part, that pro-cedures pertinent to emergency planning be implemented.
Section 9.2 of the B!PS Training Manual, " Emergency Preparedness Plan,"
established pursuant to this requirement, specifies, in part, that the following assigned emergency organization personnel be trained /
retrained each two years by completing an assigned Selective Emergency Preparedness Plan Training Checklist:
ECC Chief; Assistant ECC Supervisor; Comunications Operator; Data Recorder and Mapper; Monitoring Teams; and Emergency Squad Me:nbers.
Contrary to the above requirements, as of March 2, 1979, the follcwing assigned emergency organization personnel had not com-pleted the assigned Selective Emergency Preparedness Plan Checklist within the last two years:
7 9092 80 7$
1 1034 ~J
Appendix A 2
ECC Chief - 1 of 3 assigned Assistant ECC Supervisor - 3 of 3 assigned Communications Operator - 10 of 12 assigned Data Recorder and Mapper - 15 of 18 assigned Monitoring Teams - 10 of 24 assigned Emergency Squad Members - 49 of 97 assigned C.
Section 6.8.1 of the Appendix A, TS requires, in part, that procedures pertinent to emergency planning be established and implemented.
The BVPS Emergency Preparedness Plan requires that specific notifi-cations / recommendations be made by the licensee if airborg I-131 concentrations exceed a specified acti.on level of 1 x 10-microcuries/cc in offsite locations.
BVPS EPP Procedure IIB-6, written pursuant to the above requirements, details the sampling and analytical techniques to be used to measure the above concentrations.
Contrary to these requirements, as of March 2,1979, the combination of procedures / emergency kit equipment was inadequgge to meet the requirements,in that, the action level of 1 x 10 ' microcuries/cc of I-131 could not be measured with the existing instrumentation and procedures.
I