ML19208B843
Text
u-
- MLA, a: M AMERICAN ELECTRIC POWER Service Co rp o ra tion i
2 Broadway. New York, N. Y.10004 gp (212) 422-4800 JOHN rD0LAN May 16, 1978 s,=nzumwna w Iv=mv Donald C. Cook Nuclear Plant Unit No. 2 Docket No. 50-316 License No. DPR-74 Mr. J. G. Keppler, Regional Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137
Dear Mr. Keppler:
This letter provides the written followup report
('
to our verbal report made to NRC Region III Inspector, Mr. K. R. Baker on' May 3, 1978, which was also confirmed by Shaller to you on May 3, 1978.
At letter from Mr. D. V.
that time we reported that when Unit No. 2 entered Mode 4, the Containment Spray Pump switches were not in the automatic standby position as required by Technical Specification The attached enclosure is submitted in fulfillment 3.6.2.1.
of the requirement of Technical Specification 6.9.1.8 to provide prompt notification with written followup for an event of this nature, very truly yours, b
ohn E. Dolan JED:cib Enclosure R. C. Callen 7 9092104{ 7G.
.cc:
G. Charnoff I hgg"fSt -
P. W. Steketee v
R. J. Vollen 3900S0
('
R. Walsh R. W. Jurgensen 7...,
g 3 jg7g D. V. Shaller - Bridgman 7
..