Forwards IE Insp Rept 50-302/79-13 on 790326-0504 & Notice of Violation
ML19207B510
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/31/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
FLORIDA POWER CORP.
Shared Package
ML19207B505 List:
References
NUDOCS 7908300088
Download: ML19207B510 (2)


See also: IR 05000302/1979013

Text

/

%

=

Ih

.

m Mcg

a

UNITED STATES

jo

+

8

NUCLEAR REGULATORY COMMISSION

g

3,,

g

.

REGION 11

t

g

o,

f

101 MARIETT A sT., N.W.. SulT E 3100

ATLANTA. GEORGI A 30303

  • p*

MAY 311379

In Reply Refer To:

RII:TJMcH

50-302/79-13

Florida Power Corporation

ATTH:

W. P. Stewart, Director

Power Production

P. O. Box 14042, Mail Stop C-4

St. Petersburg, FL 33733

Gentlemen:

This refers to the inspection conducted by T. J. McHenry and others of this

office on March 26 through May 4, 1979, of activities authorized by NRC

License No. DPR-72 for the Crystal River Unit 3 facility, and to the

discussion of our findings held with G. P. Beatty at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspectors.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is

discussed in the enclosed report.

During the inspection, it was found that certain activities under your

license appear to be in noncompliance with NRC requirements. These items and

references to pertinent requirements are listed in the Notice of Violation

enclosed herewith as Appendix A.

This notice is sent to you pursuant to the

provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10,

Code of Federal Regulations.

Section 2.201 requires you to submit to this

office, within 20 days of your receipt of this notice, a written statement or

explanation in reply including:

(1) corrective steps which have been taken

by you and the results achieved; (2) corrective steps which will be taken to

avoid further noncompliance; and (3) the date when full compliance will be

achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20

days to this office to withhold such information from public disclosure.

Any

such application must include a full statement of the reasons on the basis of

852 086

7 908300 O g

>

.

.

.

.

.

3

Florida Power Corporation

-2-

MAY 311979

which it is claimed that the information is proprietary, and should be prepared

'

es that proprietary information identified in the application is contained in

a separate part of the document.

If we do not hear from you in this regard

within the specified period, the report will be placed in the Public Document

Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

)?'.l:.

'

R. C.

ewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-302/79-13

cc w/ encl:

G. P. Bestty, Jr.

Plant Superintendent

P. O. Box 1228

Crystal River, FL 32629

,

,

852 087

4

',

i

i

k