ML19207B507

From kanterella
Jump to navigation Jump to search
Responds to NRC 790531 Ltr Re Violations Noted in IE Insp Rept 50-302/79-13.Corrective Actions:Revised SP-300 to Require Logging of Sump & Recorder Level After Each Shift
ML19207B507
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/24/1979
From: Stewart W
FLORIDA POWER CORP.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19207B505 List:
References
CS-79-215, NUDOCS 7908300080
Download: ML19207B507 (1)


Text

na s n; *y r

  • "_ . a

' ' , ' ,! fg ~. -

eC0 go et.v o er. g # .,I b ei ~ 'i

[f] , i j ,. 3 Florida 24 Jul Power coa * "

3-031979 a-2 CS-79-215 Mr. J. P. O'Reilly, Director Docket No. 50-302 Office of Inspection & Enforcement License No. DPR-72 U.S. Nuclear Regulatory Commission Ref: RII: TJMcH 101 dbrietta St., Suite 3100 50-302/79-13 Atlanta, CA 30303

Dear Mr. O'Reilly:

We offer the following supplemental information to the "B" apparent Item of Noncompliance noted in the referenced inspection report.

Further investigation of this matter hs. revealed that during the time period of 17 to 19 April 1979, the Reactor Building sump in-ventory and discharge were not monitored for a period of about thirty-five (35) hours, as stated in the Notice of Violation. Documented data does not uphold our contention that all sump inventory indicators were "off scale high".

In order to prevent recurrence of this violation w. have:

- Revised SP-300, to require, a) wide and narrow range logging of the Reactor sump level each shift, and b) logging of Reactor Building sump narrow range recorder level each shift.

The implementation of this revision will be ef fective by 1 August 1979 and full compliance will be achieved.

If there are further questions, please contact us.

Very truly yours,

~

g La , eN aeV Nuc1' ear Plant Manager W. P. Stewa.t.

Manager, Nuclear Operations JC/rc 852 083 #f# U 7908300 C$$ '.t> m e,..,