Draft Ltr Forwarding Fr Notice & Safety Evaluation Re Unit Restart.Requests Schedule for long-term Mods
ML19207B418
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/03/1979
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Stewart W
FLORIDA POWER CORP.
Shared Package
ML19207B419 List:
References
NUDOCS 7908290127
Download: ML19207B418 (2)


Text

'

Sm alc

,'j ] h.

o UNITED STATES g

NUCLEAR REGULATORY COMMISSION WASHINCTO N. D. C. 20555 j;;

E I

N l

0, '

l

'%...../

l Docket No.: 50-302 i

t I

~

Mr. W. P. Stewart Manager, Nuclear Operations t

Florida Power Corporation P. O. Box 14042

' Mail Stop C-4 St. Petersburg, Florida 33733

Dear Mr. Stewart:

- By Order.of May 16, 1979, the Commission confirmed your undertaking a series of actions, both immediate and long-term, to increase the capa-bility and reliability of the Crystal River, Unit No. 3 to respond to various transient events.

In addition, the Order confirmed that you j

would maintain the plant in a shutdown condition until the following actions had been satisfactorily completed:

"(a) Upgrade the timeliness and reliability of delivery from the Emergency Feedwater System by carrying out actions as identified in Enclosure 1 of the licensee's letter of May 1,1979."

"(b). Develop and implement operating procedures for initiating and controlling emergency feedwater independent of Inte-

' grated Control System control."

"(c)

Implement a hard-wired control-grade reactor trip that would be actuated on loss of main feedwater and/or turbine trip."

"(d)

Ccmplete analyses for potential smal1~ t reaks and develop and implement operating instructions to define operator action."

"(e) All licensed reactor operators and senior reestor operators will have completed the TMI-2 simulator training at B&W."

By your letter dated May 1,1979 and supplemented by five letters, dated May 16, June 12,15, 22, and 29,1979, you hn 2 documented the actions taken in response to the May 16 Order.

We have reviewed this submittal, and are satisfied that, with respect to Crystal River, Unit 3, you have satisfactorily completed the actions prescribed in items (a) through (e) of paragraph (1) of Section IV of the Order, the specified analyses are acceptacle, and tne specified implementing procedure: are appropriate.

The bases for these conclusions are set forth in the enclosed Safety Evaluation, q

7908290 / 2 7 857 25%

_a ry

Mr. W. P. Stewart

  • As noted on page 12 of the Safety Evaluation, you are required to conduct a test during power ascension (<l5% rated power) to demonstrate.the capability to provide and control emergency feedwater flow to both steam generators independent of the integrated control system.

Appropriate Technical Specifications for Limiting Conditions for Operation and for surveillance requirements should be developed as soon as practicable and provided to the staff within seven days with regard to the desi.gn and procedural changes which have been completed in compliance with the provisions of the May 16,1979 Commission Order. The revised Technical Specifications should cover:

(1). Addition of flow rate ' indication for the emergency feedwater. system; (2) Addition of the auto start circuitry for the emergency feedwater pumps;

{3) Add.ition of the anticipatory reactor trips; and (4)

Changes in set points for high pressure reactor trip and PORY actuation.

Within 30 days. of receipt of this letter, you should provide us with your schedule for completion of the long-term modifications described in Section II of the May 16 Order.

My finding of satisfactory compliance with the requirements of items (a) through

[

(e) of paragraph (1) of Section IV of the Order will permit resumption of.

t operation in accordance with the terms of the Commission's Order; it in no way affects your duty to continue'in effect all of the above provisions of the Order pending your submission and approval by the Commission of the Tech-8 nical Specification changes necessary for each of the required modifications.

f Sincerely, Harold R. Denton, Director Office of Nuclear Reactor Regulation

Enclosures:

1.

Safety Evaluation 2.

Notice cc w/encis:

See next page 857 29 s

4