Catawba Nuclear Station UFSAR Appendix 8B. Figures Appendix 8B. Figures

Catawba Nuclear Station UFSAR Figure 8-1 (Page 1 of 1)

(18 APR 2009)

Figure 8-1. Onsite Power System

Catawba Nuclear Station UFSAR Figure 8-2 (Page 1 of 1)

(22 OCT 2001)

Figure 8-2. Duke Transmission System

Catawba Nuclear Station UFSAR Figure 8-3 (Page 1 of 1)

(21 OCT 2010)

Figure 8-3. Deleted Per 2010 Update

Catawba Nuclear Station UFSAR Figure 8-4 (Page 1 of 1)

(22 OCT 2001)

Figure 8-4. Site Plan of Transmission Lines

Catawba Nuclear Station UFSAR Figure 8-5 (Page 1 of 1)

(22 OCT 2001)

Figure 8-5. Newport Transmission Line Plan This figure is currently unavailable in an electronic format. It can be located in a hardcopy version of the FSAR.

Catawba Nuclear Station UFSAR Figure 8-6 (Page 1 of 1)

(22 OCT 2001)

Figure 8-6. Allison Creek Transmission Line Plan

Catawba Nuclear Station UFSAR Figure 8-7 (Page 1 of 1)

(22 OCT 2001)

Figure 8-7. Roddey Transmission Line Plan

Catawba Nuclear Station UFSAR Figure 8-8 (Page 1 of 1)

(22 OCT 2001)

Figure 8-8. Clay Hill Transmission Line Plan

Catawba Nuclear Station UFSAR Figure 8-9 (Page 1 of 1)

(22 OCT 2001)

Figure 8-9. Moser Transmission Line Plan

Catawba Nuclear Station UFSAR Figure 8-10 (Page 1 of 1)

(22 OCT 2001)

Figure 8-10. 230KV Switchyard General Arrangement

Catawba Nuclear Station UFSAR Figure 8-11 (Page 1 of 1)

(22 OCT 2001)

Figure 8-11. 230KV Switchyard 125VDC Auxiliary Power System

Catawba Nuclear Station UFSAR Figure 8-12 (Page 1 of 1)

(22 OCT 2001)

Figure 8-12. 230KV Switchyard and Station Interconnections

Catawba Nuclear Station UFSAR Figure 8-13 (Page 1 of 1)

(17 APR 2012)

Figure 8-13. Offsite Power System Protective Relaying Zones

Catawba Nuclear Station UFSAR Figure 8-14 (Page 1 of 1)

(22 OCT 2001)

Figure 8-14. Stability Analysis Diagram Revised Per CNCE-10888

Catawba Nuclear Station UFSAR Figure 8 Figure 8-18(Page 1 of 1)

(22 OCT 2001)

Figure 8-15. Deleted Per 2000 Revision Figure 8-16. Deleted Per 2000 Revision Figure 8-17. Deleted Per 2000 Revision Figure 8-18. Deleted Per 2000 Revision

Catawba Nuclear Station UFSAR Figure 8-19 (Page 1 of 1)

(18 APR 2009)

Figure 8-19. Non-Class 1E AC Power Systems

Catawba Nuclear Station UFSAR Figure 8-20 (Page 1 of 1)

(22 OCT 2001)

Figure 8-20. 13.8KV Normal Auxiliary Power System and 600 VAC Cooling Tower Auxiliary Power System

Catawba Nuclear Station UFSAR Figure 8-21 (Page 1 of 1)

(24 OCT 2004)

Figure 8-21. Essential and Blackout Auxiliary Power Systems

Catawba Nuclear Station UFSAR Figure 8-22 (Page 1 of 2)

(17 OCT 2013)

Figure 8-22. 125 VDC and 240/120 VAC Auxiliary Control Power Systems

Catawba Nuclear Station UFSAR Figure 8-22 (Page 2 of 2)

(17 OCT 2013)

I I

I I

I I

I

~-

~'~'"'

c~~

I~

~"~~~ l:h;c~-c--~l)-

I SWITD<2K-0 I

~- ______ :~J_:--~

~'

i r--

swJ~~~~~~sA:

  • ~(
~( --------

I

~ ~

~ ~

I I

~ ~

~ ~ ~~~~A~,2~ FWR.

~~ 1 6~~*~' c~~i-E~'l/2R~~G.

~ ~

~s

~ ~

~~

r--

""~UAL I I

SWTl~A~5F1'1isl LDCATEDINAUX.BLDG.,ELEV.554'+1",

F~LA Fll2C I

I SWITCH 2K~"3 O t----~

~ - ! - - - - - _:--~JI _:

~ ~

§~

~:

~:

r--

swI~~~~:ss:

  • ~ (
~(

~ ~

~ ~

N ~

~ ~

~~~~~*~~* 2~~il FWR.

~:~ 1 ~~*~* c~~'rE~w2R~~G.

LDCATEOINAUll..BLDG.,ELEY.554'+m*,

I REV.


e-------------

ED '"'"" mr::~~:.:::::::~:..,

llli 1=-=**

FSARAPPENDIX B. CHAPTER B

TABLES ANO FIGURES FIGURE 8-22 125VOCAND24'1l/120VACAUXILIAR'f CONTROLPOWERSVSTEMS

""""~"""""""--"'*_ll!Yllill___'"'

Catawba Nuclear Station UFSAR Figure 8-23 (Page 1 of 1)

(22 OCT 2001)

Figure 8-23. 250 VDC Auxiliary Power System

Catawba Nuclear Station UFSAR Figure 8-24 (Page 1 of 1)

(24 OCT 2004)

Figure 8-24. 125 VDC and 120 VAC Vital Instrumentation and Control Power System

Catawba Nuclear Station UFSAR Figure 8-25 (Page 1 of 1)

(24 APR 2006)

Figure 8-25. 125 VDC Vital Instrumentation and Control Battery Duty Cycle

Catawba Nuclear Station UFSAR Figure 8-26 (Page 1 of 1)

(17 APR 2012)

Figure 8-26. 125 VDC Diesel Essential Auxiliary Power System

Catawba Nuclear Station UFSAR Figure 8-27 (Page 1 of 1)

(24 APR 2006)

Figure 8-27. 125 VDC Diesel Auxiliary Power Battery Duty Cycle

Catawba Nuclear Station UFSAR Figure 8-28 (Page 1 of 1)

(22 OCT 2001)

Figure 8-28. Peacock Transmission Line Plan