9 to Updated Final Safety Analysis Report, Chapter 16, Selected Licensee Commitments
ML19189A275
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 04/06/2017
From:
Duke Energy Carolinas
To:
Office of Nuclear Reactor Regulation
Shared Package
ML17103A316 List:
References
CNS-17-016
Download: ML19189A275 (7)


Text

Catawba Nuclear Station UFSAR Chapter 16 (09 OCT 2016) 16 - i Table of Contents 16.0 Selected Licensee Commitments 16.1 Introduction 16.2 Relation to Technical Specifications

Catawba Nuclear Station UFSAR Chapter 16 (09 OCT 2016) 16.0 - 1 16.0 Selected Licensee Commitments THIS IS THE LAST PAGE OF THE TEXT SECTION 16.0.

UFSAR Chapter 16 Catawba Nuclear Station 16.0 - 2 (09 OCT 2016)

THIS PAGE LEFT BLANK INTENTIONALLY.

Catawba Nuclear Station UFSAR Chapter 16 (09 OCT 2016) 16.1 - 1 16.1 Introduction The Catawba Nuclear Station selected licensee commitment program provides a single location where certain selected operational related commitments are controlled. While this program constitutes Chapter 16 of the Catawba FSAR, the contents of the program are maintained in a separate manual. This manual, "The Catawba Nuclear Station Selected Licensee Commitments Manual", facilitates the administration of this program, including more timely revision and addition of important commitments and user convenience.

The "Catawba Nuclear Station Selected Licensee Commitments Manual" contains commitments to control important plant equipment and operating conditions not controlled elsewhere.

Issuance of the manual, as well as subsequent revisions, are done under the approval of the Station Manager.

THIS IS THE LAST PAGE OF THE TEXT SECTION 16.1.

UFSAR Chapter 16 Catawba Nuclear Station 16.1 - 2 (09 OCT 2016)

THIS PAGE LEFT BLANK INTENTIONALLY.

Catawba Nuclear Station UFSAR Chapter 16 (09 OCT 2016) 16.2 - 1 16.2 Relation to Technical Specifications The Catawba Nuclear Station Selected Licensee Commitments Manual contains a listing of selected commitments for which Catawba Technical Specification 5.4 (Procedures) requires written procedures to be established, implemented, and maintained.

THIS IS THE LAST PAGE OF THE TEXT SECTION 16.2.

UFSAR Chapter 16 Catawba Nuclear Station 16.2 - 2 (09 OCT 2016)

THIS PAGE LEFT BLANK INTENTIONALLY.