ML19189A285
Text
Catawba Nuclear Station UFSAR Appendix 3B. Figures Appendix 3B. Figures
Catawba Nuclear Station UFSAR Figure 3-1 (Page 1 of 1)
(22 OCT 2001)
Figure 3-1. Wind Pressure Distribution On The Reactor Building
Catawba Nuclear Station UFSAR Figure 3-2 (Page 1 of 1)
(22 OCT 2001)
Figure 3-2. Wind Pressure Distribution For Rectangular Structures
Catawba Nuclear Station UFSAR Figure 3-3 (Page 1 of 1)
(22 OCT 2001)
Figure 3-3. Turbine Building Tornado Velocity Distribution
Catawba Nuclear Station UFSAR Figure 3-4 (Page 1 of 1)
(22 OCT 2001)
Figure 3-4. Tornado Wind Loads - Design Velocity Vs. Radius From Center Of Tornado
Catawba Nuclear Station UFSAR Figure 3-5 (Page 1 of 1)
(22 OCT 2001)
Figure 3-5. Turbine Missile Ejection Zones
Catawba Nuclear Station UFSAR Figure 3-6 (Page 1 of 1)
(22 OCT 2001)
Figure 3-6. Loss Of Reactor Coolant Accident Boundary Limits
Catawba Nuclear Station UFSAR Figure 3-7 (Page 1 of 1)
(22 OCT 2001)
Figure 3-7. Location Of Postulated Breaks In Main Reactor Coolant Loop
Catawba Nuclear Station UFSAR Figure 3-8 (Page 1 of 1)
(22 OCT 2001)
Figure 3-8. Deleted Per 2001 Update
Catawba Nuclear Station UFSAR Figure 3-9 (Page 1 of 1)
(22 OCT 2001)
Figure 3-9. Reactor Coolant Loop Model
Catawba Nuclear Station UFSAR Figure 3-10 (Page 1 of 1)
(22 OCT 2001)
Figure 3-10. Time-History Dynamic Solution For Loca Loading
Catawba Nuclear Station UFSAR Figure 3-11 (Page 1 of 1)
(22 OCT 2001)
Figure 3-11. Typical Cold Penetration
Catawba Nuclear Station UFSAR Figure 3-12 (Page 1 of 1)
(22 OCT 2001)
Figure 3-12. Typical Main Steam And Feedwater Penetration
Catawba Nuclear Station UFSAR Figure 3-13 (Page 1 of 1)
(22 OCT 2001)
Figure 3-13. Typical Hot Penetration
Catawba Nuclear Station UFSAR Figure 3 Figure 212 (Page 1 of 12)
(22 OCT 2001)
Figure 3-14. Deleted Per 1990 Update Figure 3-15. Deleted Per 1990 Update Figure 3-16. Deleted Per 1990 Update Figure 3-17. Deleted Per 1990 Update Figure 3-18. Deleted Per 1990 Update Figure 3-19. Deleted Per 1990 Update Figure 3-20. Deleted Per 1990 Update Figure 3-21. Deleted Per 1990 Update Figure 3-22. Deleted Per 1990 Update Figure 3-23. Deleted Per 1990 Update Figure 3-24. Deleted Per 1990 Update Figure 3-25. Deleted Per 1990 Update Figure 3-26. Deleted Per 1990 Update Figure 3-27. Deleted Per 1990 Update Figure 3-28. Deleted Per 1990 Update Figure 3-29. Deleted Per 1990 Update Figure 3-30. Deleted Per 1990 Update Figure 3-31. Deleted Per 1990 Update
Catawba Nuclear Station UFSAR Figure 3 Figure 212 (Page 2 of 12)
(22 OCT 2001)
Figure 3-32. Deleted Per 1990 Update Figure 3-33. Deleted Per 1990 Update Figure 3-34. Deleted Per 1990 Update Figure 3-35. Deleted Per 1990 Update Figure 3-36. Deleted Per 1990 Update Figure 3-37. Deleted Per 1990 Update Figure 3-38. Deleted Per 1990 Update Figure 3-39. Deleted Per 1990 Update Figure 3-40. Deleted Per 1990 Update Figure 3-41. Deleted Per 1990 Update Figure 3-42. Deleted Per 1990 Update Figure 3-43. Deleted Per 1990 Update Figure 3-44. Deleted Per 1990 Update Figure 3-45. Deleted Per 1990 Update Figure 3-46. Deleted Per 1990 Update Figure 3-47. Deleted Per 1990 Update Figure 3-48. Deleted Per 1990 Update
Catawba Nuclear Station UFSAR Figure 3 Figure 212 (Page 3 of 12)
(22 OCT 2001)
Figure 3-49. Deleted Per 1990 Update Figure 3-50. Deleted Per 1990 Update Figure 3-51. Deleted Per 1990 Update Figure 3-52. Deleted Per 1990 Update Figure 3-53. Deleted Per 1990 Update Figure 3-54. Deleted Per 1990 Update Figure 3-55. Deleted Per 1990 Update Figure 3-56. Deleted Per 1990 Update Figure 3-57. Deleted Per 1990 Update Figure 3-58. Deleted Per 1990 Update Figure 3-59. Deleted Per 1990 Update Figure 3-60. Deleted Per 1990 Update Figure 3-61. Deleted Per 1990 Update Figure 3-62. Deleted Per 1990 Update Figure 3-63. Deleted Per 1990 Update Figure 3-64. Deleted Per 1990 Update Figure 3-65. Deleted Per 1990 Update Figure 3-66. Deleted Per 1990 Update
Catawba Nuclear Station UFSAR Figure 3 Figure 212 (Page 4 of 12)
(22 OCT 2001)
Figure 3-67. Deleted Per 1990 Update Figure 3-68. Deleted Per 1990 Update Figure 3-69. Deleted Per 1990 Update Figure 3-70. Deleted Per 1990 Update Figure 3-71. Deleted Per 1990 Update Figure 3-72. Deleted Per 1990 Update Figure 3-73. Deleted Per 1990 Update Figure 3-74. Deleted Per 1990 Update Figure 3-75. Deleted Per 1990 Update Figure 3-76. Deleted Per 1990 Update Figure 3-77. Deleted Per 1990 Update Figure 3-78. Deleted Per 1990 Update Figure 3-79. Deleted Per 1990 Update Figure 3-80. Deleted Per 1990 Update Figure 3-81. Deleted Per 1990 Update Figure 3-82. Deleted Per 1990 Update Figure 3-83. Deleted Per 1990 Update
Catawba Nuclear Station UFSAR Figure 3 Figure 212 (Page 5 of 12)
(22 OCT 2001)
Figure 3-84. Deleted Per 1990 Update Figure 3-85. Deleted Per 1990 Update Figure 3-86. Deleted Per 1990 Update Figure 3-87. Deleted Per 1990 Update Figure 3-88. Deleted Per 1990 Update Figure 3-89. Deleted Per 1990 Update Figure 3-90. Deleted Per 1990 Update Figure 3-91. Deleted Per 1990 Update Figure 3-92. Deleted Per 1990 Update Figure 3-93. Deleted Per 1990 Update Figure 3-94. Deleted Per 1990 Update Figure 3-95. Deleted Per 1990 Update Figure 3-96. Deleted Per 1990 Update Figure 3-97. Deleted Per 1990 Update Figure 3-98. Deleted Per 1990 Update Figure 3-99. Deleted Per 1990 Update Figure 3-100. Deleted Per 1990 Update Figure 3-101. Deleted Per 1990 Update
Catawba Nuclear Station UFSAR Figure 3 Figure 212 (Page 6 of 12)
(22 OCT 2001)
Figure 3-102. Deleted Per 1990 Update Figure 3-103. Deleted Per 1990 Update Figure 3-104. Deleted Per 1990 Update Figure 3-105. Deleted Per 1990 Update Figure 3-106. Deleted Per 1990 Update Figure 3-107. Deleted Per 1990 Update Figure 3-108. Deleted Per 1990 Update Figure 3-109. Deleted Per 1990 Update Figure 3-110. Deleted Per 1990 Update Figure 3-111. Deleted Per 1990 Update Figure 3-112. Deleted Per 1990 Update Figure 3-113. Deleted Per 1990 Update Figure 3-114. Deleted Per 1990 Update Figure 3-115. Deleted Per 1990 Update Figure 3-116. Deleted Per 1990 Update Figure 3-117. Deleted Per 1990 Update Figure 3-118. Deleted Per 1990 Update
Catawba Nuclear Station UFSAR Figure 3 Figure 212 (Page 7 of 12)
(22 OCT 2001)
Figure 3-119. Deleted Per 1990 Update Figure 3-120. Deleted Per 1990 Update Figure 3-121. Deleted Per 1990 Update Figure 3-122. Deleted Per 1990 Update Figure 3-123. Deleted Per 1990 Update Figure 3-124. Deleted Per 1990 Update Figure 3-125. Deleted Per 1990 Update Figure 3-126. Deleted Per 1990 Update Figure 3-127. Deleted Per 1990 Update Figure 3-128. Deleted Per 1990 Update Figure 3-129. Deleted Per 1990 Update Figure 3-130. Deleted Per 1990 Update Figure 3-131. Deleted Per 1990 Update Figure 3-132. Deleted Per 1990 Update Figure 3-133. Deleted Per 1990 Update Figure 3-134. Deleted Per 1990 Update Figure 3-135. Deleted Per 1990 Update Figure 3-136. Deleted Per 1990 Update
Catawba Nuclear Station UFSAR Figure 3 Figure 212 (Page 8 of 12)
(22 OCT 2001)
Figure 3-137. Deleted Per 1990 Update Figure 3-138. Deleted Per 1990 Update Figure 3-139. Deleted Per 1990 Update Figure 3-140. Deleted Per 1990 Update Figure 3-141. Deleted Per 1990 Update Figure 3-142. Deleted Per 1990 Update Figure 3-143. Deleted Per 1990 Update Figure 3-144. Deleted Per 1990 Update Figure 3-145. Deleted Per 1990 Update Figure 3-146. Deleted Per 1990 Update Figure 3-147. Deleted Per 1990 Update Figure 3-148. Deleted Per 1990 Update Figure 3-149. Deleted Per 1990 Update Figure 3-150. Deleted Per 1990 Update Figure 3-151. Deleted Per 1990 Update Figure 3-152. Deleted Per 1990 Update Figure 3-153. Deleted Per 1990 Update
Catawba Nuclear Station UFSAR Figure 3 Figure 212 (Page 9 of 12)
(22 OCT 2001)
Figure 3-154. Deleted Per 1990 Update Figure 3-155. Deleted Per 1990 Update Figure 3-156. Deleted Per 1990 Update Figure 3-157. Deleted Per 1990 Update Figure 3-158. Deleted Per 1990 Update Figure 3-159. Deleted Per 1990 Update Figure 3-160. Deleted Per 1990 Update Figure 3-161. Deleted Per 1990 Update Figure 3-162. Deleted Per 1990 Update Figure 3-163. Deleted Per 1990 Update Figure 3-164. Deleted Per 1990 Update Figure 3-165. Deleted Per 1990 Update Figure 3-166. Deleted Per 1990 Update Figure 3-167. Deleted Per 1990 Update Figure 3-168. Deleted Per 1990 Update Figure 3-169. Deleted Per 1990 Update Figure 3-170. Deleted Per 1990 Update Figure 3-171. Deleted Per 1990 Update
Catawba Nuclear Station UFSAR Figure 3 Figure 212 (Page 10 of 12)
(22 OCT 2001)
Figure 3-172. Deleted Per 1990 Update Figure 3-173. Deleted Per 1990 Update Figure 3-174. Deleted Per 1990 Update Figure 3-175. Deleted Per 1990 Update Figure 3-176. Deleted Per 1990 Update Figure 3-177. Deleted Per 1990 Update Figure 3-178. Deleted Per 1990 Update Figure 3-179. Deleted Per 1990 Update Figure 3-180. Deleted Per 1990 Update Figure 3-181. Deleted Per 1990 Update Figure 3-182. Deleted Per 1990 Update Figure 3-183. Deleted Per 1990 Update Figure 3-184. Deleted Per 1990 Update Figure 3-185. Deleted Per 1990 Update Figure 3-186. Deleted Per 1990 Update Figure 3-187. Deleted Per 1990 Update Figure 3-188. Deleted Per 1990 Update
Catawba Nuclear Station UFSAR Figure 3 Figure 212 (Page 11 of 12)
(22 OCT 2001)
Figure 3-189. Deleted Per 1990 Update Figure 3-190. Deleted Per 1990 Update Figure 3-191. Deleted Per 1990 Update Figure 3-192. Deleted Per 1990 Update Figure 3-193. Deleted Per 1990 Update Figure 3-194. Deleted Per 1990 Update Figure 3-195. Deleted Per 1990 Update Figure 3-196. Deleted Per 1990 Update Figure 3-197. Deleted Per 1990 Update Figure 3-198. Deleted Per 1990 Update Figure 3-199. Deleted Per 1990 Update Figure 3-200. Deleted Per 1990 Update Figure 3-201. Deleted Per 1990 Update Figure 3-202. Deleted Per 1990 Update Figure 3-203. Deleted Per 1990 Update Figure 3-204. Deleted Per 1990 Update Figure 3-205. Deleted Per 1990 Update Figure 3-206. Deleted Per 1990 Update
Catawba Nuclear Station UFSAR Figure 3 Figure 212 (Page 12 of 12)
(22 OCT 2001)
Figure 3-207. Deleted Per 1990 Update Figure 3-208. Deleted Per 1990 Update Figure 3-209. Deleted Per 1990 Update Figure 3-210. Deleted Per 1990 Update Figure 3-211. Deleted Per 1990 Update Figure 3-212. Deleted Per 1990 Update
Catawba Nuclear Station UFSAR Figure 3-213 (Page 1 of 1)
(22 OCT 2001)
Figure 3-213. Design Response Spectrum,.15g
Catawba Nuclear Station UFSAR Figure 3-214 (Page 1 of 1)
(22 OCT 2001)
Figure 3-214. Response Acceleration Spectra
Catawba Nuclear Station UFSAR Figure 3-215 (Page 1 of 1)
(22 OCT 2001)
Figure 3-215. Response Acceleration Spectra
Catawba Nuclear Station UFSAR Figure 3-216 (Page 1 of 1)
(22 OCT 2001)
Figure 3-216. Damping Valve For Seismic Analysis Of Piping (Applicable To Both OBE and SSE, Independent Of Pipe Diameter)
Catawba Nuclear Station UFSAR Figure 3-217 (Page 1 of 1)
(22 OCT 2001)
Figure 3-217. Containment Interior Structure Lumped Mass Model
Catawba Nuclear Station UFSAR Figure 3-218 (Page 1 of 1)
(22 OCT 2001)
Figure 3-218. Auxiliary Building Elevation
Catawba Nuclear Station UFSAR Figure 3-219 (Page 1 of 1)
(22 OCT 2001)
Figure 3-219. Exterior Doghouse And UHI Elevation
Catawba Nuclear Station UFSAR Figure 3-220 (Page 1 of 1)
(22 OCT 2001)
Figure 3-220. Diesel Generator Building Elevation
Catawba Nuclear Station UFSAR Figure 3-221 (Page 1 of 1)
(22 OCT 2001)
Figure 3-221. Nuclear Service Water Pump Structure Elevation
Catawba Nuclear Station UFSAR Figure 3-222 (Page 1 of 1)
(22 OCT 2001)
Figure 3-222. Reactor Building First And Second Horizontal Mode Shapes
Catawba Nuclear Station UFSAR Figure 3-223 (Page 1 of 1)
(22 OCT 2001)
Figure 3-223. Reactor Building First And Second Vertical Mode Shapes
Catawba Nuclear Station UFSAR Figure 3-224 (Page 1 of 1)
(22 OCT 2001)
Figure 3-224. Reactor Building Shear Force, Q (lb/in), Due To SSE
Catawba Nuclear Station UFSAR Figure 3-225 (Page 1 of 1)
(22 OCT 2001)
Figure 3-225. Reactor Building Meridional Force, N (lb/in), Due To SSE
Catawba Nuclear Station UFSAR Figure 3-226 (Page 1 of 1)
(22 OCT 2001)
Figure 3-226. Reactor Building Meridional Moment, M (in-lb/in.), Due To SSE
Catawba Nuclear Station UFSAR Figure 3-227 (Page 1 of 1)
(22 OCT 2001)
Figure 3-227. Reactor Building Membrane Shear N (lb/in) Due To SSE
Catawba Nuclear Station UFSAR Figure 3-228 (Page 1 of 1)
(22 OCT 2001)
Figure 3-228. Reactor Building Hoop Force No (lb/in) Due To SSE
Catawba Nuclear Station UFSAR Figure 3-229 (Page 1 of 1)
(22 OCT 2001)
Figure 3-229. Reactor Building Hoop Moment MO (in-lb/in) Due To SSE
Catawba Nuclear Station UFSAR Figure 3-230 (Page 1 of 1)
(22 OCT 2001)
Figure 3-230. Containment Interior Structure First Four Horizontal Mode Shapes North-South Direction
Catawba Nuclear Station UFSAR Figure 3-231 (Page 1 of 1)
(22 OCT 2001)
Figure 3-231. Containment Interior Structure First Four Horizontal Mode Shapes East-West Direction
Catawba Nuclear Station UFSAR Figure 3-232 (Page 1 of 1)
(22 OCT 2001)
Figure 3-232. Containment Interior Structure First Tow Vertical Mode Shapes Vertical Direction
Catawba Nuclear Station UFSAR Figure 3-233 (Page 1 of 1)
(22 OCT 2001)
Figure 3-233. Reactor Building Interior Structure Response Loads North-South, SSE
Catawba Nuclear Station UFSAR Figure 3-234 (Page 1 of 1)
(22 OCT 2001)
Figure 3-234. Reactor Building Interior Structure Response Loads East-West, SSE
Catawba Nuclear Station UFSAR Figure 3-235 (Page 1 of 1)
(22 OCT 2001)
Figure 3-235. Response Acceleration Spectrum, Damping = 0.05, Reactor Interior, North-South Direction, Elevation 556+8, (OBE)
Catawba Nuclear Station UFSAR Figure 3-236 (Page 1 of 1)
(22 OCT 2001)
Figure 3-236. Response Acceleration Spectrum, Damping = 0.05, Reactor Interior, North-South Direction, Elevation 592+2, (OBE)
Catawba Nuclear Station UFSAR Figure 3-237 (Page 1 of 1)
(22 OCT 2001)
Figure 3-237. Response Acceleration Spectrum, Damping = 0.05, Reactor Interior, North-South Direction, Elevation 609+10, (OBE)
Catawba Nuclear Station UFSAR Figure 3-238 (Page 1 of 1)
(22 OCT 2001)
Figure 3-238. Response Acceleration Spectrum, Damping = 0.05, Reactor Interior, North-South Direction, Elevation 643+6, (OBE)
Catawba Nuclear Station UFSAR Figure 3-239 (Page 1 of 1)
(22 OCT 2001)
Figure 3-239. Response Acceleration Spectrum, Damping = 0.05, Reactor Interior, North-South Direction, Elevation 668+10, (OBE)
Catawba Nuclear Station UFSAR Figure 3-240 (Page 1 of 1)
(22 OCT 2001)
Figure 3-240. Response Acceleration Spectrum, Damping = 0.05, Reactor Interior, North-South Direction, Elevation 609+10, (OBE)
Catawba Nuclear Station UFSAR Figure 3-241 (Page 1 of 1)
(22 OCT 2001)
Figure 3-241. Soil Pressure Diagram For Substructure Walls Of Auxiliary Building
Catawba Nuclear Station UFSAR Figure 3-242 (Page 1 of 1)
(22 OCT 2001)
Figure 3-242. Multi-Degree Of Freedom System
Catawba Nuclear Station UFSAR Figure 3-243 (Page 1 of 1)
(22 OCT 2001)
Figure 3-243. Reactor Building And Containment Structural Outline
Catawba Nuclear Station UFSAR Figure 3-244 (Page 1 of 1)
(22 OCT 2001)
Figure 3-244. Reactor Building Bottom Radial Bars
Catawba Nuclear Station UFSAR Figure 3-245 (Page 1 of 1)
(22 OCT 2001)
Figure 3-245. Reactor Building Top Radial Bars
Catawba Nuclear Station UFSAR Figure 3-246 (Page 1 of 1)
(22 OCT 2001)
Figure 3-246. Reactor Building Circular Bars
Catawba Nuclear Station UFSAR Figure 3-247 (Page 1 of 1)
(22 OCT 2001)
Figure 3-247. Containment Vessel And Equipment Anchorage Details
Catawba Nuclear Station UFSAR Figure 3-248 (Page 1 of 1)
(22 OCT 2001)
Figure 3-248. Reactor Building Shell Wall Developed Elevation
Catawba Nuclear Station UFSAR Figure 3-249 (Page 1 of 1)
(22 OCT 2001)
Figure 3-249. Reactor Building Shell Wall Developed Elevation
Catawba Nuclear Station UFSAR Figure 3-250 (Page 1 of 1)
(22 OCT 2001)
Figure 3-250. Reactor Building Shell Wall Developed Elevation
Catawba Nuclear Station UFSAR Figure 3-251 (Page 1 of 1)
(22 OCT 2001)
Figure 3-251. Reactor Building Equipment Hatch Reinforcing
Catawba Nuclear Station UFSAR Figure 3-252 (Page 1 of 1)
(22 OCT 2001)
Figure 3-252. Dome And Ring Girder Reinforcing
Catawba Nuclear Station UFSAR Figure 3-253 (Page 1 of 1)
(22 OCT 2001)
Figure 3-253. Dome And Ring Girder Reinforcing
Catawba Nuclear Station UFSAR Figure 3-254 (Page 1 of 1)
(22 OCT 2001)
Figure 3-254. Dome And Ring Girder Reinforcing
Catawba Nuclear Station UFSAR Figure 3-255 (Page 1 of 1)
(22 OCT 2001)
Figure 3-255. Equipment Hatch Model
Catawba Nuclear Station UFSAR Figure 3-256 (Page 1 of 1)
(22 OCT 2001)
Figure 3-256. K-Shell Model For Reactor Building Analysis
Catawba Nuclear Station UFSAR Figure 3-257 (Page 1 of 1)
(22 OCT 2001)
Figure 3-257. Axis Orientation For Reactor Building Analysis
Catawba Nuclear Station UFSAR Figure 3-258 (Page 1 of 1)
(22 OCT 2001)
Figure 3-258. Reactor Building Shell And Crane Wall (Reinforcement Details)
Catawba Nuclear Station UFSAR Figure 3-259 (Page 1 of 1)
(22 OCT 2001)
Figure 3-259. Containment Geometry
Catawba Nuclear Station UFSAR Figure 3-260 (Page 1 of 1)
(22 OCT 2001)
Figure 3-260. Containment Personnel And Equipment Hatch Typical Details
Catawba Nuclear Station UFSAR Figure 3-261 (Page 1 of 1)
(22 OCT 2001)
Figure 3-261. Containment Mechanical And Electrical Penetrations Typical Details
Catawba Nuclear Station UFSAR Figure 3-262 (Page 1 of 1)
(22 OCT 2001)
Figure 3-262. Containment Vessel And Cylinder Plate Layout And Penetration Location
Catawba Nuclear Station UFSAR Figure 3-263 (Page 1 of 1)
(22 OCT 2001)
Figure 3-263. Containment Vessel And Cylinder Plate Layout And Penetration Location
Catawba Nuclear Station UFSAR Figure 3-264 (Page 1 of 1)
(24 OCT 2004)
Figure 3-264. Containment Vessel Penetration Details
Catawba Nuclear Station UFSAR Figure 3-265 (Page 1 of 1)
(22 OCT 2001)
Figure 3-265. Containment Vessel Base Linear Plate Embedded Items
Catawba Nuclear Station UFSAR Figure 3-266 (Page 1 of 1)
(22 OCT 2001)
Figure 3-266. Containment Vessel Base Linear Plate Test Channel Layout
Catawba Nuclear Station UFSAR Figure 3-267 (Page 1 of 1)
(22 OCT 2001)
Figure 3-267. Containment Vessel Model For KSHEL Analysis
Catawba Nuclear Station UFSAR Figure 3-268 (Page 1 of 1)
(22 OCT 2001)
Figure 3-268. Containment Vessel Model For Stardyne Localized Analysis
Catawba Nuclear Station UFSAR Figure 3-269 (Page 1 of 1)
(22 OCT 2001)
Figure 3-269. Containment Vessel Model For Wilson-Ghosh Analysis
Catawba Nuclear Station UFSAR Figure 3-270 (Page 1 of 1)
(22 OCT 2001)
Figure 3-270. TMD Compartment Pressure Transients - Ice Condenser Region
Catawba Nuclear Station UFSAR Figure 3-271 (Page 1 of 1)
(22 OCT 2001)
Figure 3-271. TMD Compartment Pressure Transients - Ice Condenser Region
Catawba Nuclear Station UFSAR Figure 3-272 (Page 1 of 1)
(22 OCT 2001)
Figure 3-272. TMD Compartment Pressure Transients - Ice Condenser Region
Catawba Nuclear Station UFSAR Figure 3-273 (Page 1 of 1)
(22 OCT 2001)
Figure 3-273. TMD Compartment Pressure Transients - Ice Condenser Region
Catawba Nuclear Station UFSAR Figure 3-274 (Page 1 of 1)
(22 OCT 2001)
Figure 3-274. Fourier Series Representation Of Transient Pressures
Catawba Nuclear Station UFSAR Figure 3-275 (Page 1 of 1)
(22 OCT 2001)
Figure 3-275. Containment Vessel Model For BOSOR4 Stability Analysis
Catawba Nuclear Station UFSAR Figure 3-276 (Page 1 of 1)
(22 OCT 2001)
Figure 3-276. Localized Nastran Model For Stability Analysis
Catawba Nuclear Station UFSAR Figure 3-277 (Page 1 of 1)
(22 OCT 2001)
Figure 3-277. Containment Vessel Model For Marc Ultimate Capacity Analysis
Catawba Nuclear Station UFSAR Figure 3-278 (Page 1 of 1)
(21 OCT 2010)
Figure 3-278. Reactor Building Pressure Seals And Gaskets
Catawba Nuclear Station UFSAR Figure 3-279 (Page 1 of 1)
(15 NOV 2007)
Figure 3-279. Reactor Building Pressure Seals And Gaskets
Catawba Nuclear Station UFSAR Figure 3-280 (Page 1 of 1)
(22 OCT 2001)
Figure 3-280. Catawba Operating Floor Elastic Model
Catawba Nuclear Station UFSAR Figure 3-281 (Page 1 of 1)
(22 OCT 2001)
Figure 3-281. Catawba Operating Floor Element Model
Catawba Nuclear Station UFSAR Figure 3-282 (Page 1 of 1)
(22 OCT 2001)
Figure 3-282. Fixed End Supports
Catawba Nuclear Station UFSAR Figure 3-283 (Page 1 of 1)
(22 OCT 2001)
Figure 3-283. Pinned End Supports
Catawba Nuclear Station UFSAR Figure 3-284 (Page 1 of 1)
(22 OCT 2001)
Figure 3-284. Fixed End Supports
Catawba Nuclear Station UFSAR Figure 3-285 (Page 1 of 1)
(22 OCT 2001)
Figure 3-285. Pinned End Supports
Catawba Nuclear Station UFSAR Figure 3-286 (Page 1 of 1)
(17 APR 2012)
Figure 3-286. Calculation Of Safety-Related Masonry Walls
Catawba Nuclear Station UFSAR Figure 3-287 (Page 1 of 1)
(22 OCT 2001)
Figure 3-287. Reactor Coolant Loop Supports System Dynamic Structural Model
Catawba Nuclear Station UFSAR Figure 3-288 (Page 1 of 1)
(22 OCT 2001)
Figure 3-288. Through-Wall Thermal Gradients
Catawba Nuclear Station UFSAR Figure 3-289 (Page 1 of 1)
(22 OCT 2001)
Figure 3-289. Reactor Internals Mathematical Model For DARI Variables
Catawba Nuclear Station UFSAR Figure 3-290 (Page 1 of 1)
(22 OCT 2001)
Figure 3-290. Reactor Internals Mathematical Model For WOSTAS Variables
Catawba Nuclear Station UFSAR Figure 3-291 (Page 1 of 1)
(22 OCT 2001)
Figure 3-291. Pre And Post Hot Functional Examination Points For Internals And Integrity
Catawba Nuclear Station UFSAR Figure 3-292 (Page 1 of 1)
(22 OCT 2001)
Figure 3-292. Auxiliary Building Auxiliary Feedwater System
Catawba Nuclear Station UFSAR Figure 3-293 (Page 1 of 1)
(22 OCT 2001)
Figure 3-293. Full Length Control Rod Drive Mechanism
Catawba Nuclear Station UFSAR Figure 3-294 (Page 1 of 1)
(22 OCT 2001)
Figure 3-294. Full Length Control Rod Drive Mechanism Schematic
Catawba Nuclear Station UFSAR Figure 3-295 (Page 1 of 1)
(22 OCT 2001)
Figure 3-295. Nominal Latch Clearance At Minimum And Maximum Temperature
Catawba Nuclear Station UFSAR Figure 3-296 (Page 1 of 1)
(22 OCT 2001)
Figure 3-296. Control Rod Drive Mechanism Latch Clearance Thermal Effect
Catawba Nuclear Station UFSAR Figure 3-297 (Page 1 of 1)
(22 OCT 2001)
Figure 3-297. Lower Core Support Assembly (Core Barrel Assembly)
Catawba Nuclear Station UFSAR Figure 3-298 (Page 1 of 1)
(22 OCT 2001)
Figure 3-298. Upper Core Support Structure
Catawba Nuclear Station UFSAR Figure 3-299 (Page 1 of 1)
(22 OCT 2001)
Figure 3-299. Plan View Of Upper Core Support Structure
Catawba Nuclear Station UFSAR Figure 3-300 (Page 1 of 1)
(22 OCT 2001)
Figure 3-300. Direct Generation Interactive Scheme Flow Chart
Catawba Nuclear Station UFSAR Figure 3-301 (Page 1 of 1)
(22 OCT 2001)
Figure 3-301. Reactor Coolant Loop Model for Steam Generator Replacement
Catawba Nuclear Station UFSAR Figure 3-302 (Page 1 of 1)
(22 OCT 2001)
Figure 3-302. Reactor Coolant Loop Model for Steam Generator Replacement
Catawba Nuclear Station UFSAR Figure 3-303 (Page 1 of 1)
(22 OCT 2001)
Figure 3-303. Reactor Coolant Loop Model for Steam Generator Replacement
Catawba Nuclear Station UFSAR Figure 3-304 (Page 1 of 1)
(22 OCT 2001)
Figure 3-304. Reactor Coolant Loop Model for Steam Generator Replacement
Catawba Nuclear Station UFSAR Figure 3-305 (Page 1 of 1)
(22 OCT 2001)
Figure 3-305. Loop Layout and Global Coordinates
Catawba Nuclear Station UFSAR Figure 3-306 (Page 1 of 1)
(22 OCT 2001)
Figure 3-306. RPV Shell Submodel
Catawba Nuclear Station UFSAR Figure 3-307 (Page 1 of 1)
(22 OCT 2001)
Figure 3-307. Core Barrel Submodel
Catawba Nuclear Station UFSAR Figure 3-308 (Page 1 of 1)
(22 OCT 2001)
Figure 3-308. Reactor Internals Submodel
Catawba Nuclear Station UFSAR Figure 3-309 (Page 1 of 1)
(22 OCT 2001)
Figure 3-309. Hydrodynamic Masses in Vessel/Barrel Downcomer Annulus
Catawba Nuclear Station UFSAR Figure 3-310 (Page 1 of 1)
(22 OCT 2001)
Figure 3-310. Response Acceleration Spectra