ML19154A558
| ML19154A558 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 06/12/2019 |
| From: | Bill Gleaves NRC/NRO/DLSE/LB2 |
| To: | Jennifer Dixon-Herrity NRC/NRO/DLSE/LB2 |
| GLEAVES B/NRO | |
| References | |
| Download: ML19154A558 (10) | |
Text
June 12, 2019 MEMORANDUM TO:
Jennifer Dixon-Herrity, Chief Licensing Branch 2 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors FROM:
William (Billy) Gleaves, Sr. Project Manager /RA/
Licensing Branch 2 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors
SUBJECT:
SUMMARY
OF A PUBLIC MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY ON MAY 23, 2019 (EPID A17008)
The U.S. Nuclear Regulatory Commission (NRC) staff held a Category 1 public meeting with Southern Nuclear Operating Companys (SNC) staff and contractors at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland on May 23, 2019. The purpose of the meeting was to have SNC make a pre-submittal presentation on License Amendment Request (LAR)19-003 (WEC 164) Reconciliation of Detailed AP1000 Radiation Analyses, and to have technical exchange discussions associated with LAR 19-010 (WEC 163), Heat-up of Auxiliary Building Rooms following Loss of HVAC or Loss of all AC Power, and LAR 19-009 (WEC 80), Small Break Loss-of-Coolant Accident (SBLOCA) Analysis Updates, all for the Vogtle Electric Generating Plant (VEGP) Units 3 and 4.
The meeting notice can be found in the Agencywide Documents Access and Management System (ADAMS) under Accession Number ML19074A017. The meeting notice is also posted on the NRC public website. Enclosures 1 and 2 are the meeting agenda and attendance list for the meeting, respectively. The meeting slides referenced during the discussion can be found at the ADAMS Accession Numbers below:
2019/05/16 Vogtle COL Docs - [External Sender]
Slides for 5/23 Public Meeting
- ML19141A339 2019/05/21 Vogtle COL Docs - FW:
Emailing: LAR Slides for Emailing to the Public
- ML19141A343 CONTACT:
Billy Gleaves, NRO/DLSE/LB2 (301) 415-5848
J. Dixon-Herrity Summary of Meeting:
On May 23, 2019, at approximately 9:02 a.m., the NRC staff started a public meeting with representatives from SNC and its contractors to discuss feedback for its pre-application and pre-submittal presentations for three potential licensing actions for SNCs VEGP Units 3 and 4.
Specifically, the meeting discussed (1) a pre-submittal presentation for LAR 19-003 (WEC 164)
Reconciliation of Detailed AP1000 Radiation Analyses, (2) a pre-application technical exchange on LAR 19-010 (WEC 163), Heat-up of Auxiliary Building Rooms following Loss of HVAC or Loss of all AC Power, and (3) a pre-application technical exchange on LAR 19-009 (WEC 80), Small Break Loss-of-Coolant Accident (SBLOCA) Analysis Updates, for VEGP Units 3 and 4.
The first discussion item started at 9:05 a.m. was for the pre-submittal presentation for LAR 19-003 (WEC 164). This discussion is called a pre-submittal discussion because the related technical exchange meeting occurred on March 26, 2019. The purpose of this SNC presentation was to seek feedback from the NRC on the draft LAR, including how it relates to the in-containment refueling water storage tank (IRWST) source term information. The staff stated that it would expect to see the IRWST source term(s) in the application with a listing of radionuclides and/or energies and not just a general description of the source in the Final Safety Analysis Report (FSAR). The staff stated that it may have to review the detailed calculations supporting this request, therefore an audit may be required. The staff asked about environmental qualification and why the regulatory basis did not include 10 CFR 50.49. SNC stated that they would include a statement on the equipment impacted by the IRWST. SNC stated that it plans to submit this LAR to the NRC by June 2019. At the end of the presentation and discussion of staff questions, questions from any members of the public were requested, but none were offered.
At 9:36 a.m., the second discussion item was a pre-application technical exchange on LAR 19-010 (WEC 163). SNC stated that the purpose of this change is to reflect updated information since these calculations were completed originally for the AP1000 design certification. The staff stated that the proposed LAR should be clear on the impact of these changes on the main control room heat up analysis. The staff stated that SNC should be clear on the impact of these changes on American Concrete Institute (ACI)-349 Code Requirements for Nuclear Safety-Related Concrete Structures and Commentary, temperature limits. SNC stated its intention to pre-submit this LAR to staff for discussion before early August 2019 and to submit the LAR before late August 2019 with a 6-month review requested to support inspection, test, analysis, and acceptance criteria (ITAAC) closure. At the end of this discussion, NRC requested public comments and received none.
At 10:00 a.m. the meeting was paused for a break and restarted at 10:12 a.m. for the pre-application technical exchange on LAR 19-009 (WEC 80) Small Break Loss-of-Coolant Accident (SBLOCA) Analysis Updates. The staff had questions as to the changes proposed for the Stage 1 Automatic Depressurization System valve and the associated isolation valves. The staff had questions about changes to the equipment qualification of the valves and their actuators. When discussing changes to the flow area, the staff stated that this would likely require an audit of the supporting calculations. SNC stated that they expect to request a pre-submittal meeting on this proposed LAR before early July 2019 with submittal before August 2019 with a 6-month review requested.
J. Dixon-Herrity When requested by the staff, there were no comments or questions from members of the public.
The meeting ended at 11:25 a.m.
Docket Nos.: 052-025 052-026
Enclosure:
As stated cc w/encls.: See next page
ML19154A558 NRC-008 OFFICE PM: DLSE/LB2 LA: DLSE/LB2 BC: DLSE/LB2 PM: DLSE/LB2 NAME WGleaves RButler JDixon-Herrity WGleaves (s)
DATE 6/10/19 6/6/19 6/10/19 6/12/19
2
PUBLIC MEETING AGENDA
Notice of Meeting with Southern Nuclear Operating Company May 23, 2019, 9:00 a.m. to 12:00 p.m.
Teleconference Time OPEN Topic Organizational Lead 9:00 a.m.
Opening Remarks NRC 9:05 a.m.
Discussion of Identified Topics NRC/SNC Opportunity for Public Comment (after each topic)
PUBLIC/NRC Open Portion Concludes (if needed)
CLOSED Proprietary-Related Topics NRC/SNC 12:00 p.m.
Adjourn
2 PUBLIC MEETING U.S. NUCLEAR REGULATORY COMMISSION Thursday, May 23, 2019 9:00 a.m. - 12:00 p.m.
List of Attendees Name Organization Representing the Nuclear Regulatory Commission Billy Gleaves NRO/DLSE/LB2 Chandu Patel NRO/DLSE/LB2 Anne-Marie Grady NRO/DESR/SPRA Sheila Ray NRR/DE/EENB Antonio Barrett NRO/DESR/SRSB Ryan Nolan NRO/DESR/SRSB T.R. Tjader NRR/STSB Tim Lupold NRO/DESR/MEB Ed Stutzcage NRO/DLSE/RGRB Pravin Patel NRO/DESR/SEB Thomas Scarbrough NRO/DESR/MEB Nan Chien NRO/DESR/SPRA Malcolm Patterson*
NRO/DESR/SPRA Tarico Sweat*
NRR/STSB Chris Welch*
NRO/DLSE/CIPB Representing Applicant/Licensee Amy Chamberlain Southern Nuclear Operating Company (SNC)
Amy Aughtman SNC Keith Dorsey SNC Key Warren SNC Eddie Grant SNC/Excel Brad Chamberlain*
SNC Adam Quarles*
SNC Matt Humphrey*
SNC Neil Haggerty*
SNC George Wadkins*
SNC Yasmeen Arafeh*
SNC Jason Eisenhauer Westinghouse Electric Company (WEC)
Mike Patterson WEC Anthony Schoedel WEC
2 John Kirkwood*
WEC Zachary Harper*
WEC Kevin May*
WEC Mark Sheaffer*
WEC Anthony Trupiano*
WEC Bob Pinkston*
WEC Jen Meneely*
WEC Jesse Klingensmith*
WEC David McDevitt*
WEC Representing Public None
- participated via teleconference
Vogtle Units 3 & 4 Mailing List (Revised 05/08/2019) cc:
Office of the Attorney General Resident Inspector 40 Capitol Square, SW Vogtle Plant Units 3 & 4 Atlanta, GA 30334 8805 River Road Waynesboro, GA 30830 Resident Manager Oglethorpe Power Corporation Mr. Barty Simonton Alvin W. Vogtle Nuclear Plant Team Leader 7821 River Road Environmental Radiation Program Waynesboro, GA 30830 Air Protection Branch Environmental Protection Division Southern Nuclear Operating Company, Inc.
4244 International Parkway, Suite 120 Document Control Coordinator Bin N-226-EC Atlanta, GA 30354-3906 3535 Colonnade Parkway Birmingham, AL 35243 George B. Taylor, Jr.
2100 East Exchange Pl Anne F. Appleby Atlanta, GA 30084-5336 Olgethorpe Power Corporation 2100 East Exchange Place Brian H. Whitley Tucker, GA 30084 3535 Colonnade Parkway, Bin N-226-EC 42 Inverness Center Parkway, BIN B237 County Commissioner Birmingham, AL 35243 Office of the County Commissioner Burke County Commission Mr. Michael Yox Waynesboro, GA 30830 Site Regulatory Affairs Director Vogtle Units 3 & 4 Mr. Wayne Guilfoyle 7825 River Road, Bin 63031 Commissioner District 8 Waynesboro, GA 30830 Augusta-Richmond County Commission 4940 Windsor Spring Rd Hephzibah, GA 30815 Gwendolyn Jackson Burke County Library 130 Highway 24 South Waynesboro, GA 30830 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Atlanta, GA 30334 Page 1 of 3
Vogtle Units 3 & 4 Mailing List Email acchambe@southernco.com (Amy Chamberlian) agaughtm@southernco.com (Amy Aughtman)
ALPUGH@southernco.com (Amanda Pugh) awc@nei.org (Anne W. Cottingham) becky@georgiawand.org (Becky Rafter) bhwhitley@southernco.com (Brian Whitley)
Bill.Jacobs@gdsassociates.com (Bill Jacobs) bjadams@southernco.com (Brad Adams) bwwaites@southernco.com (Brandon Waites) castelca@westinghouse.com (Curtis Castell) comerj@westinghouse.com (James Comer) crpierce@southernco.com (C.R. Pierce) dahjones@southernco.com (David Jones) david.hinds@ge.com (David Hinds) david.lewis@pillsburylaw.com (David Lewis) dgbost@southernco.com (Danny Bost) dlfulton@southernco.com (Dale Fulton) drculver@southernco.com (Randy Culver) durhamdc@westinghouse.com (David Durham) ed.burns@earthlink.net (Ed Burns) edavis@pegasusgroup.us (Ed David) erg-xl@cox.net (Eddie R. Grant) fdhundle@southernco.com (Forrest Hundley) fhwillis@southernco.com (Fred Willis)
G2NDRMDC@southernco.com (SNC Document Control) graysw@westinghouse.com (Scott W. Gray) jadwilli@southernco.com (J.D. Williams) james1.beard@ge.com (James Beard) jannina.blanco@pillsburylaw.com (Jannina Blanco) jantol1dj@westinghouse.com (David Jantosik) jenmorri@southernco.com (Jennifer Buettner)
JHaswell@southernco.com (Jeremiah Haswell) jim@ncwarn.org (Jim Warren)
John.Bozga@nrc.gov (John Bozga)
Joseph_Hegner@dom.com (Joseph Hegner) jpredd@southernco.com (Jason R. Redd) jranalli@meagpower.org (Jerry Ranalli) karen.patterson@ttnus.com (Karen Patterson) karlg@att.net (Karl Gross) kmstacy@southernco.com (Kara Stacy)
KSutton@morganlewis.com (Kathryn M. Sutton) kwaugh@impact-net.org (Kenneth O. Waugh) markus.popa@hq.doe.gov (Markus Popa)
Page 2 of 3
Vogtle Units 3 & 4 Mailing List Matthew.Williams@hq.doe.gov (Matthew Williams) mdmeier@southernco.com (Mike Meier) media@nei.org (Scott Peterson)
Melissa.Smith@Hq.Doe.Gov (Melissa Smith) mike.price@opc.com (M.W. Price)
MKWASHIN@southernco.com (MKWashington) mlgraves@southernco.com (Michelle Graves)
MSF@nei.org (Marvin Fertel) myox@southernco.com (Mike Yox) nirsnet@nirs.org (Michael Mariotte)
Nuclaw@mindspring.com (Robert Temple) patriciaL.campbell@ge.com (Patricia L. Campbell)
Paul@beyondnuclear.org (Paul Gunter) pbessette@morganlewis.com (Paul Bessette) r.joshi15@comcast.net (Ravi Joshi)
RJB@NEI.org (Russell Bell)
Ronald.Jones@scana.com (Ronald Jones) rwink@ameren.com (Roger Wink) sabinski@suddenlink.net (Steve A. Bennett) sara@cleanenergy.org (Sara Barczak) sblanton@balch.com (Stanford Blanton)
Shiva.Granmayeh@hq.doe.gov (Shiva Granmayeh) sjackson@meagpower.org (Steven Jackson) skauffman@mpr.com (Storm Kauffman) sroetger@psc.state.ga.us (Steve Roetger) stephan.moen@ge.com (Stephan Moen) stephen.burdick@morganlewis.com (Stephen Burdick) tom.miller@hq.doe.gov (Tom Miller)
TomClements329@cs.com (Tom Clements)
Vanessa.quinn@dhs.gov (Vanessa Quinn) vcsummer2n3@gmail.com (Brian McIntyre) wasparkm@southernco.com (Wesley A. Sparkman) wayne.marquino@gmail.com (Wayne Marquino) weave1dw@westinghouse.com (Doug Weaver) x2gabeck@southernco.com (Gary Becker) x2kmseib@southernco.com (Kristin Seibert)
Page 3 of 3