ATTACHMENT TO LICENSE AMENDMENT NO. 173 TO FACILITY COMBINED LICENSE NO. NPF-91 DOCKET NO.52-025 Replace the following pages of the Facility Combined License No. NPF-91 with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Facility Combined License No. NPF-91 REMOVE INSERT 7
7 Appendix C to Facility Combined License No. NPF-91 REMOVE INSERT C-413 C-413
(7) Reporting Requirements (a)
Within 30 days of a change to the initial test program described in UFSAR Section 14, Initial Test Program, made in accordance with 10 CFR 50.59 or in accordance with 10 CFR Part 52, Appendix D, Section VIII, Processes for Changes and Departures, SNC shall report the change to the Director of NRO, or the Directors designee, in accordance with 10 CFR 50.59(d).
(b)
SNC shall report any violation of a requirement in Section 2.D.(3),
Section 2.D.(4), Section 2.D.(5), and Section 2.D.(6) of this license within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Initial notification shall be made to the NRC Operations Center in accordance with 10 CFR 50.72, with written follow up in accordance with 10 CFR 50.73.
(8) Incorporation The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 173, are hereby incorporated into this license.
(9) Technical Specifications The technical specifications in Appendix A to this license become effective upon a Commission finding that the acceptance criteria in this license (ITAAC) are met in accordance with 10 CFR 52.103(g).
(10) Operational Program Implementation SNC shall implement the programs or portions of programs identified below, on or before the date SNC achieves the following milestones:
(a)
Environmental Qualification Program implemented before initial fuel load; (b)
Reactor Vessel Material Surveillance Program implemented before initial criticality; (c)
Preservice Testing Program implemented before initial fuel load; (d)
Containment Leakage Rate Testing Program implemented before initial fuel load; (e)
- 1.
The fire protection measures in accordance with Regulatory Guide (RG) 1.189 for designated storage building areas (including adjacent fire areas that could affect the storage area) implemented before initial receipt 7
Amendment No. 173
C-413 Amendment No. 173 Table 3.3-1 (cont.)
Definition of Wall Thicknesses for Nuclear Island Buildings, Turbine Building, and Annex Building(1)
Wall or Section Description Column Lines(7)
Floor Elevation or Elevation Range(7)(8)
Concrete Thickness(2)(3)(4)(5)(9)(18)
Applicable Radiation Shielding Wall (Yes/No)
South wall of pressurizer compartment Not Applicable From 103'-0" to 153'-6" 2'-6" Yes West wall of pressurizer compartment N-S wall parallel with column line N From 107'-2" to 160'-0" 2'-6" Yes North wall of pressurizer compartment E-W wall parallel with column line 7 From 107'-2" to 160'-0" 2'-6" Yes East wall of pressurizer compartment N-S wall parallel with column line N From 118'-6" to 160'-0" 2'-6" Yes North-east wall of in-containment refueling water storage tank Parallel to column line N From 103'-0" to 135'-3" 2'-6" Yes West wall of in-containment refueling water storage tank Not applicable From 103'-0" to 135'-3" 5/8" steel plate with stiffeners Yes South wall of east steam generator compartment Not Applicable From 87'-6" to 153'-0" 2'-6" Yes East wall of east steam generator compartment N-S wall parallel with column line N From 94'-0" to 153'-0" 2'-6" Yes North wall of east steam generator compartment Not Applicable From 87'-6" to 153'-0" with a 158'-0" portion 2'-6" Yes Shield Building(6)(15)
Shield Building Cylinder Not Applicable From 100'-0" to 248'-6" 3'-0" (including 3/4 inch thick min.
steel plate liner on each face on portion not protected by auxiliary building)
Yes Air Inlet Not Applicable From 248'-6" to 251'-6" From 251'-6" to 254'-6" From 254'-6" to 266'-4" 3-0" (including 3/4 inch thick min.
steel plate liner on each face) 3'-0" to 4'-6" (including 1 inch thick steel plate liner on each face) 4'-6" (including 1 inch thick min. steel plate liner on each face)
Yes Yes Yes Tension Ring Not Applicable From 266'-4" to 271'-6 (at top of plate) 4'-6" (including 1-1/2 inch thick steel plate liner on each face)
Yes