ML19154A270

From kanterella
Jump to navigation Jump to search
4 to Updated Final Safety Analysis Report, Chapter 15, Quality Assurance Program, Figures
ML19154A270
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/23/2019
From:
Entergy Nuclear Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML19154A338 List: ... further results
References
PNP 2019-015
Download: ML19154A270 (2)


Text

FSAR CHAPTER 15 - QUALITY ASSURANCE PROGRAM FIGURE 15-1 Revision 21 BECHTEL PROJECT ENGINEER BECHTEL PROJECT SUPERINTENDENT SAN FRANCISCO ENGINEERING GROUP SUPV BECHTEL SHOP INSPECTORS QUALITY ASSURANCE ENGINEER CONSTRUCTION SUPERINTENDENT JOB ENGINEER ENGINEERS MATERIALS TESTING LABORATORIES FIELD ENGINEERS INSPECTION CRAFT SUPERINTENDENTS CONSUMERS POWER COMPANY QUALITY ASSURANCE ORGANIZATION

FSAR CHAPTER 15 - QUALITY ASSURANCE PROGRAM FIGURE 15-2 Revision 21 MANAGER MANUFACTURING VICE PRESIDENT NUCLEAR STEAM GENERATING SYSTEM CORPORATION VICE PRESIDENT UTILITY DIVISION NCD MANAGER QUALITY CONTROL PRESIDENT PF AVERY CO DIRECTOR OF MANUFACTURING UTILITY DIVISION PROJECT MANAGER PALISADES NPD QUALITY CONTROL REPRESENTATIVE NPD QUALITY CONTROL REPRESENTATIVE ASSISTANT DIRECTOR NUCLEAR LABS MANUFACTURING DIRECTOR MANUFACTURING SERVICES MANAGER OF MANUFACTURING MANAGER ENGINEERING CE VENDORS ASSISTANT DIRECTOR PWR ENGINEERING PFA CO MANAGER QUALITY CONTROL DIRECTOR NUCLEAR COMPONENT DEPT CHATTANOOGA MANAGER QUALITY CONTROL DIRECTOR NUCLEAR POWER DEPARTMENT NCD MANAGER QUALITY CONTROL MANAGER NUCLEAR LABORATORIES MANAGER MANUFACTURING WINDSOR QC SURVEILLANCE QC INSPECTION SUPERVISION COMBUSTION ENGINEERING INCORPORATED QUALITY ASSURANCE ORGANIZATION