ML19154A267
Text
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.1-3 Revision 21 PALISADES SCRAM CURVE
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.1-1 Revision 21 CONTROL ROD WITHDRAWAL INCIDENT HZP REACTIVITY INSERTION CURVE
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.1-2 Revision 21 CONTROL ROD WITHDRAWAL INCIDENT HZP REACTIVITY FEEDBACKS
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.1-3 Revision 21 CONTROL ROD WITHDRAWAL INCIDENT HZP TOTAL REACTIVITY
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.1-4 Revision 21 CONTROL ROD WITHDRAWAL INCIDENT HZP POWER AND HEAT FLUX
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.1-5 Revision 21 CONTROL ROD WITHDRAWAL INCIDENT HZP SYSTEM PRESSURE
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.1-6 Revision 21 CONTROL ROD WITHDRAWAL INCIDENT HZP INLET ENTHALPY
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.2-1 Revision 21 REACTIVITIES FOR UNCONTROLLED BANK WITHDRAWAL AT FULL POWER
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.2-2 Revision 21 REACTOR POWER LEVEL FOR UNCONTROLLED BANK WITHDRAWAL FULL POWER
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.2-3 Revision 21 CORE AVERAGE HEAT FLUX FOR UNCONTROLLED BANK WITHDRAWAL AT FULL POWER
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.2-4 Revision 21 PRESSURIZER PRESSURE FOR UNCONTROLLED BANK WITHDRAWAL AT FULL POWER
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.2-5 Revision 21 PRESSURIZER LIQUID LEVEL FOR UNCONTROLLED BANK WITHDRAWAL AT FULL POWER
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.2-6 Revision 21 PCS MASS FLOW RATE FOR UNCONTROLLED BANK WITHDRAWAL AT FULL POWER
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.2-7 Revision 21 PCS TEMPERATURES FOR UNCONTROLLED BANK WITHDRAWAL AT FULL POWER
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.2-8 Revision 21 SECONDARY PRESSURE FOR UNCONTROLLED BANK WITHDRAWAL AT FULL POWER
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.2-9 Revision 21 S/G LIQUID LEVEL FOR UNCONTROLLED BANK WITHDRAWAL AT FULL POWER
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.7.1-1 Revision 21 PRIMARY COOLANT SYSTEM MASS FLOW RATE FOR LOSS OF FORCED FLOW
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.7.1-2 Revision 21 REACTOR POWER LEVEL FOR LOSS OF FORCED FLOW
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.7.1-3 Revision 21 CORE AVERAGE HEAT FLUX FOR LOSS OF FORCED FLOW
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.7.1-4 Revision 21 PRESSURIZER PRESSURE FOR LOSS OF FORCED FLOW
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.7.1-5 Revision 21 PRIMARY COOLANT SYSTEM TEMPERATURES FOR LOSS OF FORCED FLOW
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.7.2-1 Revision 21 PRIMARY COOLANT SYSTEM MASS FLOW RATE FOR REACTOR COOLANT PUMP ROTOR SEIZURE
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.7.2-2 Revision 21 REACTOR POWER LEVEL FOR REACTOR COOLANT PUMP ROTOR SEIZURE
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.7.2-3 Revision 21 CORE AVERAGE HEAT FLUX FOR REACTOR COOLANT PUMP ROTOR SEIZURE
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.7.2-4 Revision 21 PRESSURIZER PRESSURE FOR REACTOR COOLANT PUMP ROTOR SEIZURE
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.7.2-5 Revision 21 PRIMARY COOLANT SYSTEM TEMPERATURES FOR REACTOR COOLANT PUMP ROTOR SEIZURE
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.10-1 Revision 25 POWER COMPARISONS - EXCESS LOAD 0
5 10 15 20 25 30 Time (s) 90 100 110 120 130 Power (% RTP)
Actual Reactor Power Decalibrated NI Power Decalibrated Thermal Power VHPT setpoint
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.10-2 Revision 25 PCS COOLANT TEMPERATURE - EXCESS LOAD 0
5 10 15 20 25 30 Time (s) 520 530 540 550 560 570 580 590 600 610 620 Temperature (
oF)
Thot Tcold
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.10-3 Revision 25 PRESSURIZER PRESSURE - EXCESS LOAD 0
5 10 15 20 25 30 Time (s) 1800 1900 2000 2100 2200 Pressure (psia)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.10-4 Revision 25 PRESSURIZER COLLAPSED LIQUID LEVEL - EXCESS LOAD 0
5 10 15 20 25 30 Time (s) 20 30 40 50 60 70 Level (% Span)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.10-5 Revision 25 COMPONENTS OF REACTIVITY - EXCESS LOAD 0
5 10 15 20 25 30 Time (s) 0.5 0.4 0.3 0.2 0.1 0.0 0.1 0.2 0.3 0.4 0.5 Reactivity ($)
Total Doppler Moderator Scram
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.11-1 Revision 23 Portions of this page have been redacted per 10 CFR 2.390(d)(1).
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.12-1 Revision 23 REACTOR POWER LEVEL FOR LOSS OF EXTERNAL LOAD EVENT
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.12-2 Revision 23 PRIMARY PRESSURES FOR LOSS OF EXTERNAL LOAD EVENT
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.12-3 Revision 23 PRESSURIZER LIQUID VOLUME FOR LOSS OF EXTERNAL LOAD EVENT
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.12-4 Revision 23 PRIMARY COOLANT SYSTEM TEMPERATURES FOR LOSS OF EXTERNAL LOAD EVENT
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.12-5 Revision 23 SECONDARY PRESSURES FOR LOSS OF EXTERNAL LOAD EVENT
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-1 Revision 33 Reactor Power, LNFF Analysis with Off-Site Power Available and Steam Dump System Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-2 Revision 33 Primary Coolant System Loop Temperatures, LNFF Analysis with Off-Site Power Available and Steam Dump System Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-3 Revision 33 Primary Coolant System Loop Flow, LNFF Analysis with Off-Site Power Available and Steam Dump System Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-4 Revision 33 Pressurizer Pressure, LNFF Analysis with Off-Site Power Available and Steam Dump System Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-5 Revision 33 Pressurizer Spray Flow, LNFF Analysis with Off-Site Power Available and Steam Dump System Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-6 Revision 33 Pressurizer SRV Flow, LNFF Analysis with Off-Site Power Available and Steam Dump System Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-7 Revision 33 Pressurizer Level, LNFF Analysis with Off-Site Power Available and Steam Dump System Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-8 Revision 33 SG Auxiliary Feedwater Flow, LNFF Analysis with Off-Site Power Available and Steam Dump System Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-9 Revision 33 SG Dome Pressure, LNFF Analysis with Off-Site Power Available and Steam Dump System Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-10 Revision 33 SG Liquid Mass Inventory, LNFF Analysis with Off-Site Power Available and Steam Dump System Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-11 Revision 33 Reactor Power, LNFF Analysis with Off-Site Power Available and Steam Dump System Available
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-12 Revision 33 Primary Coolant System Loop Temperatures, LNFF Analysis with Off-Site Power Available and Steam Dump System Available
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-13 Revision 33 Primary Coolant System Loop Flow, LNFF Analysis with Off-Site Power Available and Steam Dump System Available
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-14 Revision 33 Pressurizer Pressure, LNFF Analysis with Off-Site Power Available and Steam Dump System Available
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-15 Revision 33 Pressurizer Spray Flow, LNFF Analysis with Off-Site Power Available and Steam Dump System Available
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-16 Revision 33 Pressurizer SRV Flow, LNFF Analysis with Off-Site Power Available and Steam Dump System Available
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-17 Revision 33 Pressurizer Level, LNFF Analysis with Off-Site Power Available and Steam Dump System Available
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-18 Revision 33 SG Auxiliary Feedwater Flow, LNFF Analysis with Off-Site Power Available and Steam Dump System Available
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-19 Revision 33 SG Dome Pressure, LNFF Analysis with Off-Site Power Available and Steam Dump System Available
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-20 Revision 33 SG Liquid Mass Inventory, LNFF Analysis with Off-Site Power Available and Steam Dump System Available
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-21 Revision 33 Reactor Power, LNFF Analysis without Off-Site Power Available and Steam Dump Systems Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-22 Revision 33 Primary Coolant System Loop Temperatures, LNFF Analysis without Off-Site Power Available and Steam Dump Systems Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-23 Revision 33 Primary Coolant System Loop Flow, LNFF Analysis without Off-Site Power Available and Steam Dump Systems Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-24 Revision 33 Pressurizer Pressure, LNFF Analysis without Off-Site Power Available and Steam Dump Systems Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-25 Revision 33 Pressurizer Level, LNFF Analysis without Off-Site Power Available and Steam Dump Systems Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-26 Revision 33 SG Auxiliary Feedwater Flow, LNFF Analysis without Off-Site Power Available and Steam Dump Systems Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-27 Revision 33 SG Dome Pressure, LNFF Analysis without Off-Site Power Available and Steam Dump Systems Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-28 Revision 33 SG Liquid Mass Inventory, LNFF Analysis without Off-Site Power Available and Steam Dump Systems Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-1 Revision 24 Break Flow Rates During LHR-Limiting Transient 0
50 100 150 200 250 300 350 Time (sec) 0 1000 2000 3000 4000 5000 6000 Break Flow Rate (lbm/sec)
From Unaffected SG From Affected SG
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-2 Revision 24 Steam Generator Pressures During LHR-Limiting Transient 0
50 100 150 200 250 300 350 Time (sec) 0 100 200 300 400 500 600 700 800 900 1000 1100 Steam Generator Pressure (psia)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-3 Revision 24 Steam Generator Heat Transfer Rates During LHR-Limiting Transient 0
50 100 150 200 250 300 350 Time (sec) 0 500 1000 1500 2000 2500 Steam Generator Heat Transfer Rate (MW)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-4 Revision 24 Steam Generator Secondary-Side Total Fluid Inventories During LHR-Limiting Transient 0
50 100 150 200 250 300 350 Time (sec) 0 50000 100000 150000 200000 250000 Steam Generator SecondarySide Total Fluid Inventory (lbm)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-5 Revision 24 Core Inlet Temperatures During LHR-Limiting Transient 0
50 100 150 200 250 300 350 Time (sec) 250 300 350 400 450 500 550 600 Core Inlet Temperature (
oF)
Unaffected Sector Affected Sector
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-6 Revision 24 Core Inlet Flow Rates During LHR-Limiting Transient 0
50 100 150 200 250 300 350 Time (sec) 0 5000 10000 15000 20000 Core Inlet Flow Rate (lbm/sec)
Stuck Rod Region Rest of Affected Sector Unaffected Sector
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-7 Revision 24 Pressurizer Pressure During LHR-Limiting Transient 0
50 100 150 200 250 300 350 Time (sec) 600 800 1000 1200 1400 1600 1800 2000 2200 Pressurizer Pressure (psia)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-8 Revision 24 Pressurizer Liquid Level During LHR-Limiting Transient 0
50 100 150 200 250 300 350 Time (sec) 0 10 20 30 40 50 60 70 Pressurizer Liquid Level (% of span)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-9 Revision 24 Total HPSI Flow Rate During LHR-Limiting Transient 0
50 100 150 200 250 300 350 Time (sec) 0 10 20 30 40 50 Total HPSI Flow Rate (lbm/sec)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-10 Revision 24 Reactivity During LHR-Limiting Transient 0
50 100 150 200 250 300 350 Time (sec) 10 5
0 5
10 Reactivity ($)
Moderator Doppler Boron Scram Total
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-11 Revision 24 Reactor Power During LHR-Limiting Transient 0
50 100 150 200 250 300 350 Time (sec) 0 5
10 15 20 25 30 Reactor Power (% of rated)
Total Stuck Rod Region Rest of Affected Sector Unaffected Sector
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-12 Revision 24 Break Flow Rates During DNBR-Limiting Transient 0
100 200 300 400 500 600 700 Time (sec) 0 1000 2000 3000 4000 5000 6000 Break Flow Rate (lbm/sec)
From Unaffected SG From Affected SG
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-13 Revision 24 Steam Generator Pressures During DNBR-Limiting Transient 0
100 200 300 400 500 600 700 Time (sec) 0 100 200 300 400 500 600 700 800 900 1000 1100 Steam Generator Pressure (psia)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-14 Revision 24 Steam Generator Heat Transfer Rates During DNBR-Limiting Transient 0
100 200 300 400 500 600 700 Time (sec) 0 500 1000 1500 2000 2500 Steam Generator Heat Transfer Rate (MW)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-15 Revision 24 Steam Generator Secondary-Side Total Fluid Inventories During DNBR-Limiting Transient 0
100 200 300 400 500 600 700 Time (sec) 0 50000 100000 150000 200000 250000 Steam Generator SecondarySide Total Fluid Inventory (lbm)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-16 Revision 24 Core Inlet Temperatures During DNBR-Limiting Transient 0
100 200 300 400 500 600 700 Time (sec) 250 300 350 400 450 500 550 600 Core Inlet Temperature (
oF)
Unaffected Sector Affected Sector
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-17 Revision 24 Core Inlet Flow Rates During DNBR-Limiting Transient 0
100 200 300 400 500 600 700 Time (sec) 0 5000 10000 15000 20000 Core Inlet Flow Rate (lbm/sec)
Stuck Rod Region Rest of Affected Sector Unaffected Sector
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-18 Revision 24 Pressurizer Pressure During DNBR-Limiting Transient 0
100 200 300 400 500 600 700 Time (sec) 600 800 1000 1200 1400 1600 1800 2000 2200 Pressurizer Pressure (psia)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-19 Revision 24 Pressurizer Liquid Level During DNBR-Limiting Transient 0
100 200 300 400 500 600 700 Time (sec) 0 10 20 30 40 50 60 70 Pressurizer Liquid Level (% of span)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-20 Revision 24 Total HPSI Flow Rate During DNBR-Limiting Transient 0
100 200 300 400 500 600 700 Time (sec) 0 10 20 30 40 50 Total HPSI Flow Rate (lbm/sec)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-21 Revision 24 Reactivity During DNBR-Limiting Transient 0
100 200 300 400 500 600 700 Time (sec) 10 5
0 5
10 Reactivity ($)
Moderator Doppler Boron Scram Total
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-22 Revision 24 Reactor Power During DNBR-Limiting Transient 0
100 200 300 400 500 600 700 Time (sec) 0 5
10 15 20 25 30 Reactor Power (% of rated)
Total Stuck Rod Region Rest of Affected Sector Unaffected Sector
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-1 Revision 21 SGTR WITH LOAC: CORE POWER vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-2 Revision 21 SGTR WITH LOAC: CORE COOLANT TEMPERATURE vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-3 Revision 21 SGTR WITH LOAC: PRIMARY COOLANT SYSTEM PRESSURE vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-4 Revision 21 SGTR WITH LOAC: STEAM GENERATOR PRESSURE vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-5 Revision 21 SGTR WITH LOAC: TUBE LEAK FLOW RATE vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-6 Revision 21 SGTR WITH LOAC: INTEGRATED TUBE LEAK FLOW vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-7 Revision 21 SGTR WITH LOAC: PRESSURIZER LIQUID VOLUME vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-8 Revision 21 SGTR WITH LOAC: AFFECTED STEAM GENERATOR SAFETY VALVE (MSSV)
FLOW RATE vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-9 Revision 21 SGTR WITH LOAC: AFFECTED STEAM GENERATOR SAFETY VALVE (MSSV)
INTEGRATED FLOW vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-10 Revision 21 SGTR WITH LOAC: STEAM GENERATORS LIQUID MASS vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-11 Revision 21 SGTR WITH LOAC: CORE POWER vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-12 Revision 21 SGTR WITH LOAC: CORE COOLANT TEMPERATURES vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-13 Revision 21 SGTR WITH LOAC: PRIMARY COOLANT SYSTEM PRESSURE vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-14 Revision 21 SGTR WITH LOAC: STEAM GENERATORS PRESSURE vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-15 Revision 21 SGTR WITH LOAC: PRESSURIZER LIQUID VOLUME vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-16 Revision 21 SGTR WITH LOAC: TUBE LEAK FLOW RATE vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-17 Revision 21 SGTR INTEGRATED LEAK FLOW vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-18 Revision 21 SGTR ADV FLOW RATE vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-19 Revision 21 SGTR INTEGRATED ADV FLOW vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-20 Revision 21 SGTR PCS SUBCOOLING vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-21 Revision 21 SGTR HPSI FLOW RATE vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.16-1 Revision 23 CONTROL ROD EJECTION, EOC HZP CASE: CORE POWER
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.16-2 Revision 23 CONTROL ROD EJECTION, EOC HZP CASE: CORE AVERAGE HEAT-FLUX-BASED LHR
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.16-3 Revision 23 CONTROL ROD EJECTION, EOC HZP CASE: TOTAL CORE REACTIVITY
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-1 Revision 28 SCATTER PLOT OF OPERATIONAL PARAMETERS 0.0 1.0 2.0 3.0 4.0 5.0 0.0 5000.0 10000.0 15000.0 2565.0 2570.0 2575.0 2580.0 2585.0 12.0 13.0 14.0 15.0 16.0 0.4 0.3 0.2 0.1 0.0 0.1 0.2 0.3 0.4 2000.0 2020.0 2040.0 2060.0 2080.0 2100.0 40.0 50.0 60.0 70.0 536.0 538.0 540.0 542.0 544.0 OneSided Break Area (ft 2/side)
Burn Time (hours)
Core Power (MW)
LHGR (KW/ft)
ASI Pressurizer Pressure (psia)
Pressurizer Liquid Level
(%)
RCS (Tcold)
Temperature
(
oF) 130.0 135.0 140.0 145.0 1000.0 1050.0 1100.0 1150.0 1200.0 210.0 220.0 230.0 240.0 1.60e+06 1.65e+06 1.70e+06 1.75e+06 1.80e+06 80.0 100.0 120.0 140.0 Total Loop Flow (Mlb/hr)
SIT Liquid Volume (ft 3)
SIT Pressure (psia)
Containment Volume (ft 3)
SIT Temperature
(
oF)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-2 Revision 28 PCT VERSUS PCT TIME SCATTER PLOT FROM TRANSIENT CALCULATIONS
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-3 Revision 28 PCT VERSUS BREAK SIZE SCATTER PLOT FROM TRANSIENT CALCULATIONS
FSAR CHAPTER 14 - SAFETY ANALYSIS TABLE 14.17.1-4 Revision 28 Page 1 of 1
SUMMARY
OF MAJOR PARAMETERS FOR THE LIMITING PCT CASE 6.0 % Gad Rod Core Average Burnup (EFPH) 7,381.22 Core Power (MWt) 2,572.79 Hot Rod LHR, kW/ft 14.60 Total Hot Rod Radial Peak (Fr T) 2.040 Axial Shape Index (ASI) 0.1602 Break Type Guillotine Break Size (ft2/side) 3.339 Offsite Power Availability Not Available Decay Heat Multiplier 1.01073
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-5 Revision 28 MAXIMUM OXIDATION VERSUS PCT SCATTER PLOT FROM TRANSIENT CALCULATIONS
FSAR CHAPTER 14 - SAFETY ANALYSIS TABLE 14.17.1-6 Revision 28 Page 1 of 1 CALCULATED EVENT TIMES FOR THE LIMITING PCT CASE Event Time (sec)
Break Opened 0
PCP Trip 0
SIAS Issued 0.6 Start of Broken Loop SIT Injection 14.9 Start of Intact Loop SIT Injection (loops 1B, 2A and 2B, respectively) 17.1, 17.1 and 17.1 Beginning of Core Recovery (Beginning of Reflood) 27.2 PCT Occurred 27.2 Start of HPSI 40.6 LPSI Available 40.6 Broken Loop LPSI Delivery Began 40.6 Intact Loop LPSI Delivery Began (loops 1B, 2A and 2B, respectively) 40.6, 40.6 and 40.6 Broken Loop HPSI Delivery Began 40.6 Intact Loop HPSI Delivery Began (loops 1B, 2A and 2B, respectively) 40.6, 40.6, 40.6 Broken Loop SIT Emptied 50.7 Intact Loop SIT Emptied (loops 1B, 2A and 2B, respectively) 50.8, 54.6 and 53.1 Transient Calculation Terminated 300
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-7 Revision 28 BREAK FLOW FOR THE LIMITING CASE
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-8 Revision 28 CORE INLET MASS FLUX FOR THE LIMITING CASE
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-9 Revision 28 CORE OUTLET MASS FLUX FOR THE LIMITING CASE
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-10 Revision 28 VOID FRACTION AT PCS PUMPS FOR THE LIMITING CASE
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-11 Revision 28 ECCS FLOW (INCLUDES SIT, HPSI, AND LPSI) FOR THE LIMITING CASE
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-12 Revision 28 UPPER PLENUM PRESSURE FOR THE LIMITING CASE
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-13 Revision 28 COLLAPSED LIQUID LEVEL IN THE DOWNCOMER FOR THE LIMITING CASE
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-14 Revision 28 COLLAPSED LIQUID LEVEL IN THE LOWER PLENUM FOR THE LIMITING CASE
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-15 Revision 28 COLLAPSED LIQUID LEVEL IN THE CORE FOR THE LIMITING CASE
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-16 Revision 28 CONTAINMENT AND LOOP PRESSURES FOR THE LIMITING CASE
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-17 Revision 28 CORE EFFECTIVE FLOODING RATE DELETED in Revision 28
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-18 Revision 28 CORE COLLAPSED LIQUID LEVEL DELETED in Revision 28
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-19 Revision 28 CORE QUENCH LEVEL DELETED in Revision 28
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-20 Revision 28 PCT-NODE HEAT TRANSFER COEFFICIENT DELETED in Revision 28
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-21 Revision 28 PEAK CLADDING AND RUPTURE LOCATION CLADDING TEMPERATURE FOR THE LIMITING CASE DELETED in Revision 28
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.2-1 Revision 28 Break Mass Flow Rate (Limiting Case)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.2-2 Revision 28 Primary and Secondary Pressures (Limiting Case)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.2-3 Revision 28 Normalized Reactor Power (Limiting Case)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.2-4 Revision 28 Total HPSI Mass Flow Rate (Limiting Case)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.2-5 Revision 28 Total SIT Mass Flow Rate (Limiting Case)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.2-6 Revision 28 Loop Seal Void Fractions (Limiting Case)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.2-7 Revision 28 Break Void Fraction (Limiting Case)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.2-8 Revision 28 Reactor Vessel and PCS Mass Inventories (Limiting Case)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.2-9 Revision 28 Hot Channel Collapsed Level (Limiting Case)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.2-10 Revision 28 Fluid and Cladding Temperatures (Limiting Case)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.2-11 Revision 28 SG Narrow Range Liquid Levels (Limiting Case)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.2-12 Revision 28 AFW Flow Rates (Limiting Case)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.2-13 Revision 28 Total MSSV Flow (Limiting Case)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.18.1-1 Revision 29 LOCA CONTAINMENT PRESSURE PROFILE 0
10 20 30 40 50 60 1.E-01 1.E+00 1.E+01 1.E+02 1.E+03 1.E+04 1.E+05 1.E+06 1.E+07 Time (sec)
Pressure (psig)
D/G 1-1 Failure D/G 1-2 Failure
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.18.1-2 Revision 29 LOCA CONTAINMENT TEMPERATURE PROFILE 100 120 140 160 180 200 220 240 260 280 300 1.E-01 1.E+00 1.E+01 1.E+02 1.E+03 1.E+04 1.E+05 1.E+06 1.E+07 Temperature (oF)
Time (sec)
D/G 1-1 Failure D/G 1-2 Failure EEQ Profile
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.18.2-1 Revision 29 MSLB CONTAINMENT RESPONSE MAXIMUM PRESSURE PROFILE
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.18.2-2 Revision 31 MSLB CONTAINMENT RESPONSE ENVIRONMENTAL QUALIFICATION PROFILE
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.22-1 Revision 25 PALISADES CONTAINMENT HYDROGEN ANALYSIS Deleted per FSAR-2479
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.22-2 Revision 25 CONTAINMENT TEMPERATURE FOR H2 GENERATION Deleted per FSAR-2479