TN International CHAPTER 7A TN-MTR Names Signatures Date Preparation A. PARIS Ref. DOS-18-011415-036-NPV Rev 1.0 Form: PM04-3-MO-3 rev. 2 Page 1/12 NON PROPRIETARY VERSION TEST PROGRAM:
ACCEPTANCE AND MAINTENANCE TABLE OF CONTENTS
- 1. GENERAL
- 2. ACCEPTANCE TEST PROGRAM
- 3. MAINTENANCE PROGRAM
- 4. QUALITY ASSURANCE PROVISIONS LIST OF TABLES APPENDIX 7A-1:
Classification plan for components of the TN-MTR package model
TN International Ref. DOS-18-011415-036-NPV Rev. 1.0 Page 2 / 12 NON PROPRIETARY VERSION REVISION STATUS Revision Date Modifications Prepared by /
Checked by Old reference: DOS-16-00173678-700 3
N/A Document first issue. Revision number intentionally set to correspond to the source document revision number.
APA / TWI New reference: DOS-18-011415-036 1.0 N/A New reference due to new document management system software.
TWI / APA
TN International Ref. DOS-18-011415-036-NPV Rev. 1.0 Page 3 / 12 NON PROPRIETARY VERSION
- 1. GENERAL This chapter describes acceptance and commissioning test programs and the maintenance program planned during use of the packaging.
- 2. ACCEPTANCE TEST PROGRAM 2.1. Examination of purchase and fabrication documents This examination covers all testing and inspection documents and reports related to procurement and manufacture, to ensure that the packaging has been manufactured in accordance with the specifications and quality assurance program (Chapter 8A in this Safety file) presented in this report.
This examination covers, specifically, the following points:
Conformity of materials with the specifications stated in Chapters 0 and 0A in this Safety file.
Dimensional compliance of the various components: dimensions must lie within the range of tolerances indicated on the design drawings appended to this report (see appendices 0-1 and 0A-1), with the exception of waivers or justified non-conformities shown on the as-built drawings, Compliant execution of procedures and operator qualifications. These procedures are related in particular to:
- welds, surface conditions (when specified) non-destructive tests (acceptance of equipment and check on the execution of some welds),
surface treatments, placement of the resin, placement of the lead.
Compliance of acceptance results with the criteria.
Qualification of inspectors.
2.2. Visual examination All accessible surfaces are visually examined, to check that they are free of dirt, grease, oil or any other contaminating deposit; surfaces are to be cleaned if necessary.
Internal and external surface conditions are examined to check that they comply with manufacturing specifications. Any failure to comply must be repaired or justified.
TN International Ref. DOS-18-011415-036-NPV Rev. 1.0 Page 4 / 12 NON PROPRIETARY VERSION 2.3. Handling point tests A load test shall be carried out on every handling point of the packaging. The method used should ensure a minimum force per handling point equal to 1.5 times its nominal load.
A dye penetration test of welds loaded during the test and trunnion bearing surfaces and fillets is carried out before and after each test. The load test is deemed to have been successful if there are no permanent deformations allowing for measurement uncertainty and if the dye-penetration test is satisfactory (white dye penetration criterion).
2.4. Hydraulic Test The test pressure is 11 bars gauge.
Criterion: no leak, no deformation of the closing system and the containment.
2.5. Containment leaktest The leak-tightness of the packaging containment system is verified by measuring leak-tightness levels for the:
lid inner seal orifice cover inner seals, welds on the containment system The test is deemed to be satisfactory if:
A. the total leakage rate is less than 3.5 x 105 Pa.m3.s-1 SLR.
B. the total leakage rate through containment welds is less than 1.10 x 107 Pa.m3.s-1 SLR.
2.6. Check on wood moisture content It is checked that the moisture content of the wood does not exceed the value specified in chapter 0 at the time that it is put into place in the shock absorbing cover.
2.7. Radiological homogeneity inspection The uniformity of radiation shielding shall be tested by gamma radiography. This test shall identify zones with the least radiation shielding.
TN International Ref. DOS-18-011415-036-NPV Rev. 1.0 Page 5 / 12 NON PROPRIETARY VERSION 2.8. Thermal test The purpose of this test is to verify the heat dissipation characteristics of the package.
The power distributed in basket compartments is equal to 8 kW. The packaging together with its shock absorbing cover or equivalent thermal protection and with or without one of its baskets is placed in the normal transport position. Packaging and shock absorbing cover meltable plugs are removed.
The power and the temperatures are recorded during the temperature rise and during thermal equilibrium, which is assumed to be reached after 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> of continuous heating.
This test is made on the first manufactured packaging or on a packaging from the first series manufactured.
2.9. Packaging correct operation tests The purpose of these tests is to check that the various components of the packaging can be assembled without hang-up or abnormal friction, and that the packaging is ready for use. These tests apply to the following points:
placement of the basket, placement of seals in their grooves installation and removal of closing systems installation and removal of the shock absorbing cover, line-up and operating test of the orifice cover handling tool line-up and operating test of the drain system, packaging drying test, packaging handling tests.
2.10. Basket correct operation tests Gauge insertion and extraction tests to verify the flow area inside compartments corresponding to the basket used.
2.11. Correct operation tests of the MTR-52S and MTR-52SV2 basket canisters Test for opening and closing of transport plugs and plugs for handling of canisters with the appropriate tool. Special attention shall be paid to ensure that there is no seizure during closing/opening.
Test for canister insertion into compartments 4 and 9 of the MTR-52S and MTR-52SV2 baskets to check the external cross-section of the canisters.
TN International Ref. DOS-18-011415-036-NPV Rev. 1.0 Page 6 / 12 NON PROPRIETARY VERSION Insertion of a gauge with an 83 x 83 mm2 cross-section to check the canister minimum internal cross-section.
2.12. Marking Regulatory identification plates shall be placed on the packaging after the examinations, checks and tests have been done, if they are all satisfactory.
2.13. Weighing All new packagings shall be weighed at the end of manufacturing starting from January 2015. The mass of the following components shall be checked:
each packaging with its top shock absorbing cover and without any internal
- fittings, each internal fitting.
- 3. MAINTENANCE PROGRAM For inspections with a frequency defined both by a number of cycles and a duration, the packaging shall be subjected to this inspection before the imposed number of cycles, and:
prior to the expiration of this duration, or after expiration of this duration if the packaging is not in transport, but before the next
- loading, the duration and intervals start the last time this test was carried out.
Tables 7A.1, 7A.2 and 7A.3 present the program of verifications, tests and replacement of critical components to be applied during use of the packaging. The intervals specified in this table are specific to each component and not to the packaging.
All packagings with one or more components not satisfying the criteria specified in the maintenance program (see Tables 7A.1, 7A.2 and 7A.3) shall be withdrawn from service until the appropriate corrective action can be applied.
- 4. QUALITY ASSURANCE PROVISIONS The common provisions to all activities and applicable to manufacturing and maintenance activities are described in Chapter 8A in this file. The measures defined below are applicable for activities starting after December 31 2010. The rules and the classification set out in Rev. 2 of chapter 4466-Z-8A of the Safety file are applicable for activities starting before December 31, 2010.
TN International Ref. DOS-18-011415-036-NPV Rev. 1.0 Page 7 / 12 NON PROPRIETARY VERSION 4.1. Requirements specific to the fabrication activity 4.1.1. Compliance of production specifications The conformity of the equipment manufacturing specification documentation (including production drawings and acceptance test program) with the definition of the package model as given in the Safety file must be verified.
The designer is responsible for compliance of the issued production specifications with the requirements in the safety file.
Whenever a new approval certificate (extension or prolongation) is issued, the conformity of all documents must be confirmed after any changes have been taken into account.
These checks must be recorded.
4.1.2. Compliance of manufacturing sequences The compliance of all manufacturing process documents (including those related to acceptance test program) and production specifications must be verified.
The operations project manager (manufacturer) is responsible for the conformity of issued documents (operating procedures, etc.) with the requirements in the safety file received through the documents drafted by the designer.
4.1.3. Validation of manufacturing Manufacturing quality surveillance must be documented. A report must be produced for every inspection made. This report must be identified and filed.
When the supplier has completed his services, the acceptance shall apply to the services and the associated documentation. The manufacturer shall verify that the results of the acceptance tests conform with requirements specified in the safety file, based on production specifications provided by the designer.
Inspections shall be carried out by personnel qualified for this activity.
4.2. Requirements specific to maintenance 4.2.1. Conformity of the maintenance specification It shall be checked that maintenance documents conform with the maintenance program defined in this chapter.
The designer is responsible for conformity of the issued maintenance specifications with the requirements set out in the Safety file.
TN International Ref. DOS-18-011415-036-NPV Rev. 1.0 Page 8 / 12 NON PROPRIETARY VERSION Whenever a new approval certificate (extension or prolongation) is issued, the compliance of all maintenance documents must be certified after any changes have been taken into account.
These checks must be recorded.
4.2.2. Compliance of maintenance processes It shall be checked that all maintenance process documents comply with the maintenance specification.
The operations project manager (maintenance contractor) is responsible for the conformity of issued documents (operating procedures, etc.) with the requirements in the safety file received through the documents drafted by the designer.
TN International Ref. DOS-18-011415-036-NPV Rev. 1.0 Page 9 / 12 NON PROPRIETARY VERSION LIST OF TABLES Table Description Page 7A.1 Servicing Programme for each cycle 1
7A.2 Servicing Programme for every 15 cycles 1
7A.3 Servicing Programme for every 60 cycles 1
TN International Ref. DOS-18-011415-036-NPV Rev. 1.0 Page 10 / 12 NON PROPRIETARY VERSION TABLE 7A.1 SERVICING PROGRAM Maintenance in each cycle Component Sub-component Criterion Scope of application Packaging Overall Good overall condition of the packaging. No traces of impact on the packaging.
Fasteners Fasteners Good condition of threads and coating.
No hang-up during installation.
On disassembled elements Containmen t
Between seals Leak-tightness between seals meets the transport criterion (see Chapter 6A).
Shock absorbing cover Overall No traces of impact Trunnions External surfaces Good general condition.
No deformations or scratches Plug Overall No hang-up and high loosening torque during disassembly.
No scratches and wear Basket Overall No deformations, tearing of material or traces of friction on visible sections when the packaging is opened.
Basket in the packaging Lid +
orifice cover Seal grooves
+ seal Seal held securely in the groove before the leaktest.
Replace the seal if necessary Shock absorbing cover and body Meltable plugs No traces of impact and correct positioning Canisters of MTR-52S and MTR-52SV2 baskets (if used)
Overall Good overall condition of the canister. No traces of impact on the canister.
Seal grooves
+ seal (if transport plug is used)
Seal held securely in the groove before the leak test.
Replace the seal if necessary Pad return part Parts in good condition Replace parts if necessary Filter No obstruction or puncture of the filters Replace filters if necessary Pad Pads in good condition Replace pads if necessary Compression pin Good condition of the gripping system Replace the compression pin if necessary
TN International Ref. DOS-18-011415-036-NPV Rev. 1.0 Page 11 / 12 NON PROPRIETARY VERSION TABLE 7A.2 SERVICING PROGRAM 15 cycle maintenance Maintenance operations for each cycle, + the following operations:
Component Sub-component Criterion Scope of application Trunnions Bearing surfaces and fillets White dye penetration Containmen t
Seal bearing surfaces and grooves No defects that could damage the seal.
When the packaging is open Between seals Replace seals with new compliant seals (*)
Lid and orifice cover seals Leak-tightness of the containment meets maintenance criterion A (see Section 2.5) (*)
Anchor points Welds No deformations or defects Packaging Drain system No deformation or defect in the drain system (dip tube bell end)
Canisters of MTR-52S and MTR-52SV2 baskets (if used)
Welds White dye penetration
(*) 15 cycles or 3 years, whichever is most severe
TN International Ref. DOS-18-011415-036-NPV Rev. 1.0 Page 12 / 12 NON PROPRIETARY VERSION TABLE 7A.3 SERVICING PROGRAM 60 cycle maintenance 15 cycle maintenance operation + following operations:
Component Sub-component Criterion Scope of application Containmen t
Internal containment Good general condition.
No defects (scratches, impacts, etc.)
Welds Leak-tightness of the containment meets maintenance criteria B (see Section 2.5)
Packaging Fasteners The dimensions guarantee that the strength of the threads is greater than the strength of the stress area of the screws Screws for the shock absorbing cover, trunnions, lid, orifice covers Trunnions Surfaces No deformation or corrosion Removing trunnions Bearing surfaces and fillets White dye penetration After load test Fasteners Check the torque meets the criteria in Chapter 0 After load test Shock absorbing cover Shock absorbing cover Leak test /
Criterion: 1.00 x 10-4 Pa.m3.s-1 SLR.
Anchor points Welds White dye penetration