|
---|
Category:Letter type:PNP
MONTHYEARPNP 2024-014, Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances2024-10-0909 October 2024 Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances PNP 2024-037, Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-0202024-10-0404 October 2024 Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-020 PNP 2024-029, Notice of Payroll Transition at Palisades Nuclear Plant2024-08-15015 August 2024 Notice of Payroll Transition at Palisades Nuclear Plant PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 PNP 2024-032, Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-07-31031 July 2024 Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations PNP 2024-033, Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-07-24024 July 2024 Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations PNP 2024-031, Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-07-18018 July 2024 Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations PNP 2024-027, Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2024-07-0909 July 2024 Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2024-003, License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis2024-05-24024 May 2024 License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis PNP 2024-025, Supplement to Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments, Proposed Power Operations Quality Assurance Program Manual, Revision 02024-05-23023 May 2024 Supplement to Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments, Proposed Power Operations Quality Assurance Program Manual, Revision 0 PNP 2024-023, Pre-Submittal Meeting Presentation - License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis2024-05-0909 May 2024 Pre-Submittal Meeting Presentation - License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis PNP 2024-005, License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-05-0101 May 2024 License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations PNP 2024-008, Annual Radioactive Effluent Release Report2024-04-23023 April 2024 Annual Radioactive Effluent Release Report PNP 2024-009, Annual Radiological Environmental Operating Report2024-04-23023 April 2024 Annual Radiological Environmental Operating Report PNP 2024-017, 2023 Annual Non-Radiological Environmental Operating Report2024-04-23023 April 2024 2023 Annual Non-Radiological Environmental Operating Report PNP 2024-016, Notice of Intent to Pursue Subsequent License Renewal2024-04-18018 April 2024 Notice of Intent to Pursue Subsequent License Renewal PNP 2024-006, Notification of Changes in Accordance with 10 CFR 50.82(a)(7)2024-04-0909 April 2024 Notification of Changes in Accordance with 10 CFR 50.82(a)(7) PNP 2024-001, License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-02-0909 February 2024 License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments PNP 2023-033, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-021, Ventilated Storage Cask Inspection Summary Report2023-08-16016 August 2023 Ventilated Storage Cask Inspection Summary Report PNP 2023-023, Special Report – High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report – High Range Noble Gas Monitor Inoperable PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report PNP 2023-007, And Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 And Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance PNP 2022-031, License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements2022-09-14014 September 2022 License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2022-025, Report of Changes to Palisades Nuclear Plant Security Plan, Revision 182022-09-12012 September 2022 Report of Changes to Palisades Nuclear Plant Security Plan, Revision 18 PNP 2022-032, 2022 Evacuation Time Estimate Report2022-09-0707 September 2022 2022 Evacuation Time Estimate Report PNP 2022-023, Report of Changes to Palisades Nuclear Plant Security Plan, Revision 172022-08-15015 August 2022 Report of Changes to Palisades Nuclear Plant Security Plan, Revision 17 PNP 2022-014, Report of Changes to Palisades Nuclear Plant Site Emergency Plan, Revision 342022-07-13013 July 2022 Report of Changes to Palisades Nuclear Plant Site Emergency Plan, Revision 34 PNP 2022-016, License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-07-12012 July 2022 License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-017, Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47(b); 10 CFR 50.47(c)(2); and 10 CFR Part 50, Appendix E2022-07-11011 July 2022 Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47(b); 10 CFR 50.47(c)(2); and 10 CFR Part 50, Appendix E PNP 2022-019, & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals2022-06-24024 June 2022 & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals PNP 2022-010, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2022-06-13013 June 2022 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel PNP 2022-011, Termination of the Emergency Response Data System (Eros) Link2022-06-13013 June 2022 Termination of the Emergency Response Data System (Eros) Link 2024-08-02
[Table view] |
Text
Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530 Tel 269-764-2000 Jeffery A. Hardy Regulatory Assurance Manager PNP 2019-002 March 05, 2019 ATIN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Status of Remaining Actions for Generic Safety Issue - 191 Resolution Palisades Nuclear Plant Docket 50-255 Renewed Facility Operating License No. DPR-20
REFERENCES:
- 1. Entergy Nuclear Operations, Inc. letter, PNP 2017-065, Supplement to Certification of Permanent Cessation of Power Operations, dated October 19, 2017 (ADAMS Accession Number ML17292A032)
- 2. Entergy Nuclear Operations, Inc. letter to NRC, PNP 2018-017, Milestone Schedule for Generic Safety Issue - 191 Resolution, dated March 29, 2018 (ADAMS Accession Number ML18088A139)
- 3. NRC letter, Staff Re-evaluation of Closure Path for Generic Safety Issue 191 and Generic Letter 2004-02, dated November 30,2018 (ADAMS Accession Number ML18311A297)
- 4. Entergy Nuclear Operations, Inc. letter to NRC, PNP 2013-041, Generic Safety Issue-191 Closure Option, dated May 15, 2013 (ADAMS Accession Number ML13136A006)
Dear Sir or Madam:
In Reference 1, Entergy Nuclear Operations, Inc. (ENO) certified that, in accordance with 10 CFR 50.82(a)(1)(i) and 10 CFR 50.4(b)(8), it plans to permanently cease power operations at the Palisades Nuclear Plant (PNP) no later than May 31,2022.
In Reference 2, ENO submitted a revised milestone schedule for resolution of Generic Safety Issue (GSI)-191. This milestone schedule reflected ENO's plans to operate PNP until May 31 ,
2022.
In Reference 3, the NRC issued a letter stating that the GSI-191 closure path is being re-evaluated. Based on this and the continued uncertainties in the issuance of technical support documents for GSI-191 closure, such as WCAP-17788, "Comprehensive Analysis and Test Program for GSI-191 Closure," the PNP milestone schedule is being impacted. Additional changes to the milestone schedule would also occur if the WCAP-17788 methodology option is determined to not be appropriate for GSI-191 resolution at PNP and ENO needs to pursue another option for GSI-191 closure.
PNP 2019-002 Page 2 of 2 END will likely need to submit a license amendment request for the closure option chosen, which will require NRC review and approval. Any additional required plant modifications identified during the closure efforts would need to be implemented during a refueling outage, and PNP has only one refueling outage scheduled prior to the planned PNP permanent shutdown date.
While ENO has not completed the remaining actions to close GSI-191, END has completed extensive analyses, testing, and modifications to substantially improve sump performance during a postulated design basis loss of coolant accident (LDCA) at PNP, as described in Reference 4. The modifications include installation of passive containment sump strainer assemblies for segregating post-LOCA generated debris from the containment sump envelope, and installation of passive debris screens on containment sump downcomers, containment floor drains, and containment sump vent lines to mitigate post-LOCA generated debris entry into the containment sump envelope. Procedural controls, specification requirements, and containment and equipment inspections have been implemented to limit and mitigate debris generation and chemical effects that may impact sump strainer performance following a LDCA. In addition, during the 2018 refueling outage, ENO modified the containment sump vents to enhance sump performance.
Considering the schedule uncertainties that exist for resolution of GSI-191, the remaining work to complete analyses, testing, license amendment submittal, license amendment issuance, and modifications, and the END plans to permanently cease power operations at PNP, there is not sufficient time available for the remaining GSI-191 closure efforts to result in an appreciable safety benefit for PNP before the permanent shutdown date. Therefore, this letter provides notification that ENO does not plan to take additional actions for GSI-191 closure at PNP.
This letter also provides notification of the cancellation of regulatory commitments associated with GSI-191 that were established in Reference 4. The cancelled commitments are identified in the attachment.
Should you have any questions concerning this letter, or require additional information, please contact Jeff Erickson at 269-764-2375.
Sincerely, JAH/jse
Attachment:
Cancelled Regulatory Commitments cc: Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC
PNP 2019-002 ATTACHMENT Cancelled Regulatory Commitments The following table identifies Palisades Nuclear Plant regulatory commitments associated with Generic Safety Issue (GSI)-191 that have been cancelled by Entergy Nuclear Operations, Inc.
(ENO), in accordance with NEI 99-04, Guidelines for Managing NRC Commitment Changes.
Original Original Source of Original Commitment Completion Date Commitment ENO will complete any During the refueling outage ENO letter to NRC, PNP necessary insulation that follows issuance of a 2013-041, Generic Safety replacements or remediation, [safety evaluation] SE for the Issue-191 Closure Option, or other identified plant risk-informed resolution dated May 15, 2013 (ADAMS changes. [license amendment request] Accession Number LAR for Palisades Nuclear ML13136A006).
Plant (PNP).
ENO will submit a final Within six months of receipt ENO letter to NRC, PNP updated supplemental of the SE for the 2013-041, Generic Safety response to support closure risk-informed resolution LAR Issue-191 Closure Option, of [Generic Letter] GL for PNP. dated May 15, 2013 (ADAMS 2004-02 for PNP. Accession Number ML13136A006).
If it is determined during the Within two refueling outages ENO letter to NRC, PNP risk-informed process that after the issuance of the SE 2013-041, Generic Safety this option is not viable, ENO for the [South Texas Project] Issue-191 Closure Option, will complete a deterministic STP LAR. dated May 15, 2013 (ADAMS resolution path that is Accession Number acceptable to the NRC. ML13136A006).
1 of 1