ML19059A370

From kanterella
Jump to navigation Jump to search
April 2017, Hydrology and Health Physics Safety Audit Summary for the Tennessee Valley Authority Clinch River Nuclear Site Early Site Permit Application
ML19059A370
Person / Time
Site: Clinch River
Issue date: 03/23/2018
From: Mallecia Sutton
Office of New Reactors
To: Joseph Colaccino
Office of New Reactors
Sutton M
References
Download: ML19059A370 (46)


Text

March 23, 2018 MEMORANDUM TO: Joseph Colaccino, Chief Licensing Branch 3 Division of New Reactor Licensing Office of New Reactors FROM: Mallecia A. Sutton, Project Manager /RA/

Licensing Branch 3 Division of New Reactor Licensing Office of New Reactors

SUBJECT:

SUMMARY

REPORT FOR THE HYDROLOGY AND HEALTH PHYSICS SAFETY AUDIT (SECTIONS 2.4, 11.2 AND 11.3 OF THE SITE SAFETY ANALYSIS REPORT) FOR THE CLINCH RIVER NUCLEAR EARLY SITE PERMIT APPLICATION By letter dated May 12, 2016, the Tennessee Valley Authority (TVA) submitted an application to the U.S. Nuclear Regulatory Commission (NRC) for an early site permit (ESP) for the Clinch River Nuclear (CRN) Site located in Oak Ridge, Tennessee. TVA subsequently provided supplemental information in support of the application and the NRC staff accepted the application for docketing and detailed review on December 30, 2016. A notice of NRCs docketing decision was published in the Federal Register on January 12, 2017.

As part of the staff review, the Radiation Protection & Consequences Branch and Hydrology and Meteorology Engineering Branch in the Office of New Reactors conducted an audit of the documentation supporting Section 2.4, Hydrology Engineering and Sections 11.2.3, Liquid Radioactive Releases and 11.3.3, Gaseous Radioactive Releases and related sections of the CRN Site ESP Site Safety Analysis Report (SSAR). The staff also audited the methodology, models, assumptions and calculation packages in support of SSAR Chapter 2, Site Characteristics and Chapter 11, Radioactive Waste Management. This two-phase audit took place at the following locations: 1) the Bechtel Power Corporation (Bechtel) office in Reston, Virginia from April 14-17, 2017, and 2) the TVA Knoxville Complex offices in Knoxville, Tennessee, as well as the Clinch River Nuclear Site and surrounding areas, from April 24-27, 2017. The audit agenda and a list of the audit participants is included as Appendix A and Appendix B, respectively.

CONTACTS: Mallecia A. Sutton, NRO/DNRL Allen Fetter, NRO/DNRL 301-415-0673 301-415-8556

J. Colaccino The audit plan used to support these interactions is located in NRCs Agencywide Documents Access and Management System (ADAMS) under Accession No. ML17069A045. The staff developed an initial list of 44 information identifying needs to gain a better understanding of the detailed analyses and bases underlining the application. During audit interactions staff discussed hydrology and health physics topics that included the site setting, and potential effects of floods, dam failures, ice effects, low water considerations, groundwater, radionuclide source terms and exposure pathway doses, and accidental releases of radioactive liquid effluent in groundwater and surface waters for the proposed site.

Subsequent to the October 27, 2017 audit closure, the applicant submitted supplemental information to the CRN Site ESP docket that was required by the staff to make safety findings.

The staff reviewed the applicants submittals and information and, where needed participated in follow up discussions with the applicant for clarification of the supplemental information provided.

The enclosed Audit Report contains in the audit agenda in, Appendix A, a list of the audit participants Appendix B, and Appendix C a description of audit activities and a summary of the issues discussed and the status/resolution of the information needs that were outlined in the audit plan.

Docket No.52-047

Enclosures:

1. Summary Audit Report
2. TVA Safety Audit Report
3. Appendix A Audit Agenda
4. Appendix B Audit Participants
5. Appendix C: CRN Site Status cc w/encl.: See next page

ML17341A276 *via e-mail NRO-002 OFFICE NRO/DNRL/LB3: PM NRO/DNRL/LB3: LA NRO/DNRL/LB3: PM NAME MSutton AFetter MSutton DATE 12/18/2017 12/08/2017 1/31/2018 OFFICE NRO/DSEA/RPAC: BC NRO/DSEA/RHM: BC NRO/DNRL: D NAME MDudek(MHart for) CCook (W/edits) FAkstulewicz DATE 2/20/2018 2/20/2018 3/19/2018

SUMMARY

TENNESSEE VALLEY AUTHORITY CLINCH RIVER NUCLEAR EARLY SITE PERMIT APPLICATION HYDROLOGY AND HEALTH PHYSICS SAFETY AUDIT REPORT APRIL 17-19, 2017 AND APRIL 24-27, 2017

1.0 BACKGROUND

The Tennessee Valley Authority (TVA) submitted ground and surface water modeling documentation to the U.S. Nuclear Regulatory Commission (NRC) as part of their Clinch River Nuclear (CRN) Site Early Site Permit (ESP) Application. In preparation for the audit, the staff reviewed the documentation within Sections 2.4, Hydrologic Engineering 11.2.3, Liquid Radioactive Releases and 11.3.3, Gaseous Radioactive Releases and related sections of the Site Safety Analysis Report (SSAR) and the Environmental Report (ER) and, identified information needs to gain a better understanding of the detailed analyses and bases underlying the application.

In conjunction with the audit, several members of the staff visited the proposed site location and surrounding area in an effort to become familiar with the site setting and layout. This provided the staff with additional insight as to the relevance of the information needs that were identified during the staffs initial review of Sections 2.0, Site Characteristics, 2.4, 11.2.3, and 11.3.3 and related sections of the SSAR and ER. During the audit, the staff reviewed the normal and accidental radionuclide source terms, exposure pathway doses, ground and surface water models, supporting modeling documentation and calculation packages. The audit allowed the staff to better understand the bases of the radionuclide source terms and modeling results in order to reach safety conclusions concerning site characteristics, assess the radiological consequences of accidental releases to ground and surface water, and exposure pathway doses. It also assisted the staff in identifying a need for requests for additional information that may be needed for the staffs complete evaluation of the CRN Site ESP Application review.

2.0 REGULATORY BASIS

  • Title 10 of the Code of Federal Regulations (10 CFR) Part 20, Standards for Protection Against Radiation
  • 10 CFR 52.17, Contents of Applications; Technical Information, subparts (a)(1)(ii) and (a)(1)(vi)
  • Conditions for Operation to Meet the Criterion "As Low as is Reasonably Achievable" for Radioactive Material in Light-Water-Cooled Nuclear Power Reactor Effluents
  • 40 CFR Part 190, Environmental Radiation Protection 3.0 DOCUMENTS REVIEWED
  • TVA CRN Site ESP Application, Revision 0 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16144A074)
  • See Appendix C: CRN Site Information Need Status for document submittals 4.0 AUDIT RESULTS
  • A table outlining how information needs were addressed, and their resolution status is provided in Appendix C.

TENNESSEE VALLEY AUTHORITY CLINCH RIVER NUCLEAR EARLY SITE PERMIT APPLICATION HYDROLOGY AND HEALTH PHYSICS SAFETY AUDIT REPORT APRIL 17-19, 2017 AND APRIL 24-27, 2017 INTRODUCTION For the hydrology and health physics, the staff conducted two audits with the applicant; on April 17-19, 2017, in Reston, Virginia, and on April 24 - 27, 2017, in Knoxville, Tennessee, as well as the Clinch River Nuclear (CRN) Site and environs. The U.S. Nuclear Regulatory Commission (NRC) staff first met with the applicant at the Bechtel Power Corporation offices in Reston, Virginia. The staff and the applicant met again to continue the audit at the Tennessee Valley Authority (TVA) Knoxville Office Complex in Knoxville, Tennessee. The audit agenda and a list of the audit participants is included as Appendix A and Appendix B, respectively. The primary focus of the April 17-19, 2017 audit was to discuss the accidental liquid effluent release source term, postulated accidental liquid radwaste tank failure analysis, and modeling methods related to groundwater transport described in Site Safety Analysis Report (SSAR)

Section 2.4.13, Accidental Releases of Radioactive Liquid Effluents in Ground and Surface Waters. The discussions at the TVA Knoxville Office Complex transitioned into the descriptions of the site characteristics governing radionuclide transport and, the regional and local hydrologic characterizations described in SSAR Section 2.4, Hydrology Engineering and the bases for normal plant parameter envelope (PPE) and accidental liquid and gaseous effluent release source terms and exposure pathway dose analyses for the surrogate plant described in SSAR Sections 2.0, Site Characteristics 11.2.3, Liquid Radioactive Releases and 11.3.3, Gaseous Radioactive Releases. The audit information needs, status and the corresponding supplemental information submitted by the applicant are included as Appendix C. While in Knoxville, Tennessee, the staff traveled to the CRN Site in Oak Ridge, Tennessee and visited the site and surrounding area. For ease of reference, this safety audit report is organized by topical area discussions (i.e., Surface Water Hydrology, Groundwater Hydrology and Health Physics rather than two separate audit discussions.

HYDROLOGY - SURFACE WATER Surface Water Hydrology CRN Site and Surrounding Area Tours Information needs listed in Appendix C were included in the request for discussions related to surface water hydrology. The staff met with the applicant TVA, and its contractors Barge Wagoner Summer Cannon (BWSC), from April 24-27, 2017, for auditing surface water hydrology, which is relevant to Sections 2.4.1 through 2.4.11 of the applicants SSAR. The audit activities were conducted at TVA offices in Knoxville, Tennessee, as well as at four major dams and the CRN Site power plant site. In the TVA offices, the staff primarily discussed the hydrologic issues with applicant and contractor. Initially, the staff planned to view the shoreline by boat; however, the Clinch River flow velocities were too fast and shoreline access restricted by dense brush precluded shoreline access by boat. Field trips were conducted to various sites including Douglas, Cherokee, Norris, Melton Hill Dams, the CRN Site, and downstream Highway 58 Bridge. The field trips allowed the staff to make observations on the following key topics: (1) the hydraulic conditions controlled by the dams and their embankments, (2) the regional and local hydrologic characteristics of the CRN Enclosure 2

Site power plant site, and (3) the Highway 58 Bridge as an obstruction against the Clinch River flow. During the visits either at the dams, or at the CRN Site power plant site, and at the Highway 58 Bridge the staff discussed its information needs (Agencywide Documents Access and Management Systems (ADAMS) Accession No. ML17069A045) with the applicant. The status of applicants responses is included in Appendix C: CRN Site Information Need Status.

SURFACE WATER HYDROLOGY AUDIT After the audit exit briefing on April 27, 2017, the staff continued the audit as needed through teleconferences in order to communicate with TVA regarding some unresolved hydrologic issues. Between April 27, 2017, and the audit closing date on October 27, 2017, the applicant provided three submittals to NRC for the surface hydrology review, including SSAR mark-ups and digital files (ADAMS Accession Nos. ML17157B212, ML17171A335, and ML17206A090).

These submittals are the applicants responses to the hydrologic issues as indicated in the information needs (ADAMS Accession No. ML17069A045). The staff will evaluate these submittals as supplemental information to the SSAR. The details of the audit status and results for the surface hydrology are reported and categorized into the following 9 topics below.

Low Flow Analysis The staff noted that in the SSAR the applicant discussed that there is a 0.1 percent probability that a daily, average minimum flowrate of 400 cubic feet per second (cfs) could be released from the Melton Hill Dam into the Clinch River. The staff requested that the applicant clarify the development of the probability estimate associated with the 400 cfs flowrate. The staff checked TVAs 2008 Environmental Report (ADAMS Accession No. ML081850568) and found that the 400 cfs flowrate was the average 7-day, 10-year low flowrate resulting from a low flow frequency analysis. During the audit at TVA headquarters, the staff and the applicant discussed the applicants detailed computations for the low flow probability. The staff requested that the applicant clarify the inconsistency associated with the probability of the 400 cfs flowrate between the 2008 ER and the SSAR. The applicant agreed to revise the SSAR Section 2.4.11.1.1 regarding development of the probability estimate associated with the 400 cfs flowrate. The staff will verify that this information as discussed during the audit is included in Section 2.4.11, Low Water Considerations of the Safety Evaluation Report (SER).

Stream Floods The staff noted that in the SSAR the applicant addressed the flood history at the CRN Site. The staff requested that the applicant provide copies of the source information of the historical flood profiles, and the applicants Clinch River Flood Report. The applicant provided the staff with the requested information during the site audit. The information detailed the historical flood profiles included engineering drawings of the maximum natural and regulated flood profiles prior to 1951. The applicants Clinch River Flood Report contained information on how the historical flood elevations prior to 1959 were derived. The staff reviewed engineering drawings and the Clinch River flood report. The applicant agreed to revise SSAR Section 2.4.2.1 and Table 2.4.2-1 regarding the flood history at the CRN Site. The staff will verify that this information as discussed during the audit is included in Section 2.4.2, Floods of the SER.

Floods due to Hypothetical Dam Failures The staff requested that the applicant provide a more detailed description about seismic and hydrologic failures of any dams that could impact the CRN Site. During the site audit and

SENSITIVE SECURITY-RELATED INFORMATION CRITICAL ENERGY/ELECTRICAL INFRASTRUCTURE INFORMATION reconnaissance at the dams, the applicant illustrated the hypothetical dam failure cases and indicated that the dams could hypothetically fail either in partial or in whole. The applicant explained the differences between the sunny day failure case and the seismic failure case and explained that those two cases would not be critical cases when compared to the case of dam failure due to a hydrologic event, such as a probable maximum flood (PMF) event. The staff discussed with the applicant the different dam failure cases that were related to the dam configurations, the flow control facilities, and the surrounding hydrologic and hydraulic conditions. The applicant agreed to revise SSAR Section 2.4.2.2. The staff will verify that this information as discussed during the audit is included in Sections 2.4.2 and 2.4.4, Potential Dam Failures of the SER.

(SRI/CEII) The staff reviewed whether the Dam could have direct impacts on the CRN Site if the dam failed. The staff questioned how the applicants PMF analysis applied to the Dam. During the site audit and reconnaissance at the Dam, the staff were provided access to walk on the Dam and its embankments. The applicant explained the hypothetical dam breach conditions related to the configuration of the dam and the concrete navigation lock. The applicant indicated an overtopping flow of the PMF would cause the Dam failure. The staff will evaluate and compare the dam breach assumptions to the observed hydraulic conditions of the dam site in Section 2.4.4 of the SER.

The staff requested that during the dam reconnaissance the applicant explain the model development associated runoff and stream flows. The applicant illustrated the dam failure assumptions, including instantaneous failure, failure timing, and embankment breach parameters. The applicant included the dam failure assumptions, reservoir operational rules, and dam rating curves in the model development for the runoff and stream flow simulation. The staff asked questions about the accuracy of reservoir storage volume in the simulation and the computed storage volumes of the Cherokee and Douglas Dams. The applicant detailed that Geographical Information System tools and spreadsheets were used to check the storage volumes computed by the HEC-RAS model. The applicant provided a calculation package regarding the accuracy of the computed storage volumes. The staff will verify that this information as discussed during the audit is included in Sections 2.4.3, Probable Maximum Flood (PMF) on Streams and Rivers and 2.4.4 of the SER.

The staff noted the applicant adopted the Von Thun and Gillette method to determine the embankment breach configurations. The NRC staff requested that the applicant provide citations and references of that method. The applicant agreed to revise the SSAR with the supporting background information, and a general discussion of the method. The staff received a supplement detailing the SSAR revisions and will evaluate the Von Thun and Gillette method in Section 2.4.4 of the SER.

The staff noted that the applicant provided a schematic figure in the SSAR to locate the TVAs dams associated with rivers and tributaries without a map scale. The staff requested that the applicant provide a geo-reference map in the SSAR that could show the relative positions among the dams and the stream-path lengths associated with the dams. The applicant agreed to revise the SSAR and replace the schematic figure with two geo-referenced maps. The staff received supplemental information from the applicant detailing the associated SSAR revisions.

The staff requested that the applicant discuss the methods and calculations for seismic and hydrologic dam failures as indicated in the SSAR. The applicant explained that the hydrologic failures were caused by overtopping flows during a PMF event, and the seismic failures were considered an extreme seismic event combined with a 500-year flood or a 25-year flood. The SENSITIVE SECURITY-RELATED INFORMATION CRITICAL ENERGY/ELECTRICAL INFRASTRUCTURE INFORMATION

staff asked how the 500-year flood was computed and how the applicant computed the outflows from the dams identified in the National Inventory of Dams (NID) for seismic failures. The applicant provided a calculation package and agreed to revise the SSAR for further staff review.

The staff noted that the applicant used the Froehlich method to determine the peak of the breach outflows resulting from seismic failures. The staff will verify that this information as discussed during the audit is included in Section 2.4.4 of the SER.

The staff requested that the applicant discuss the flood wave routing coincident with dam failures. The applicant explained that the dam breach parameters were set up in the HEC-RAS model. The applicant provided the staff a calculation package and agree to revise its SSAR.

The staff will verify that this information as discussed during the audit is included in Section 2.4.4 of the SER.

Local Drainage and Local Intense Precipitation The staff asked the applicant for clarification on how it determined the adequacy of a drainage condition of the CRN Site as indicated in the SSAR. In response, the applicant clarified that the final grade design plan and drainage system would be provided to the staff for evaluation during the review of a Combined License (COL) Application and is not provided for review with the CRN Site early site permit (ESP) Application.

The staff asked the applicant to clarify the concave area shown in SSAR Figure 2.4.1-4, Representative Site Grading Plan. The applicant clarified that Figure 2.4.1-4 shows a proposed water intake location and is not meant to demonstrate the proposed topography and the drainage condition. The applicant agreed to revise the SSAR to remove Figure 2.4.1-4.

The staff asked the applicant to discuss the methodology that supported the local intense precipitation (LIP) computations. The staff requested the detailed descriptions of the temporal distribution of LIP. The applicant agreed to revise SSAR Section 2.4.2.3.1 describing the detailed temporal distribution of LIP. The staff will verify that this information as discussed during the audit is included in Section 2.4.2 of the SER.

Watershed Hydrology and Probable Maximum Precipitation In the SSAR, the applicant selected four different probable maximum precipitations (PMPs), but it did not provide sufficient details to describe how the PMPs were developed. The staff requested clarification during the audit and the applicant provided files in the applicants electronic reading room (eRR) detailing the PMP development for the staffs review. The staff noted that the applicant described the same temporal distribution for all four PMPs. The staff discussed with the applicant the methods published in the National Weather Service Hydro-meteorological Reports (HMR) and the uses of the HMR methods in the development of the PMPs. The applicant agreed to revise SSAR Section 2.4.3.2 describing the PMP development and SSAR Table 2.4.3-1 to include PMP depths. The staff will verify that this information as discussed during the audit is included in Section 2.4.3 of the SER.

The staff asked the applicant how it determined the 7980 square-mile PMP depth of 17.05 inches in the watershed above Watts Bar Dam. In the response, the applicant provided details of calculation methods and procedures for the PMP development. The staff noted that the PMP development was based on the HMR methods and procedures. The applicant agreed to revise SSAR Section 2.4.3 and Table 2.4.3-3. The staff will verify that this information as discussed during the audit is included in Section 2.4.3 of the SER.

The staff noted that the applicant used the unit hydrograph method and the PMPs as input data to compute the surface runoffs. The staff requested that the applicant provide clarification and references regarding how the applicant developed and validated unit hydrographs. The NRC staff also discussed with the applicant the need of adding sub-basin unit hydrographs in the SSAR. The applicant agreed to revise its SSAR with how the unit hydrographs were developed and provide the sub-basin unit hydrographs. The staff will verify that this information as discussed during the audit is included in Section 2.4.3 of the SER.

In the SSAR, the applicant addressed the non-linearity of the unit hydrographs while considering the sub-basin hydrologic conditions. The applicant adjusted the unit hydrographs for the hydrologic non-linearity in the sub-basins, using the procedures stated in NUREG/CR-7046, Design-Basis Flood Estimation for Site Characterization at Nuclear Power Plants in the United States of America (ADAMS Accession No. ML11321A195). The staff requested that the applicant provide details of the adjustments and the applicant agreed to provide the detailed description of the adjustments in an SSAR revision. The staff will verify that this information as discussed during the audit is included in Section 2.4.3 of the SER.

Stream Flow Simulations The staff discussed with the applicant methods and calculations to support the applicants hydrologic model development. Through the discussions, the staff gained a better understanding on how the model developed and how the PMF analysis applied to the CRN Site.

In the SSAR, the applicant addressed that the storage volumes of dams identified in the NID were included in the surface runoff and reservoir inflow computations and the NRC staff requested that the applicant clarify how the storage volumes were developed into the surface runoffs. The applicant provided a calculation package in its eRR which contained a description of the computational method and details. The staff reviewed the applicants calculation package as a supporting information to the SSAR. The staff will verify that this information as discussed during the audit is included in Section 2.4.3 of the SER.

In the SSAR the applicant described parameters used in the dam breach outflow computations for TVA dams. The staff asked the applicant for clarification on how the dam breach parameters were computed in hydrological failure cases for the dams identified in the NID which are not owned by TVA. The applicant clarified that dam breach outflows of dams identified in the NID not owned by TVA were computed by converting dam storage volumes into flow hydrographs and not by using dam breach parameters. The applicant agreed to revise the SSAR. The staff will verify that this information as discussed during the audit is included in Section 2.4.4 of the SER.

The staff examined the applicants HEC-RAS model (ADAMS Accession No. ML16216A115) and found that only one model cross-section was located at the CRN Site, so the staff requested that the applicant clarify the adequacy of the model cross-section interval at the CRN Site. At the audit, the applicant presented additional cross-sections in the upstream and downstream areas of the CRN Site. The applicant agreed to provide corrected cross-section layouts and intervals in the HEC-RAS model. The staff will verify that this information as discussed during the audit is included in Section 2.4.3 of the SER.

The staff asked the applicant for clarification on the proposed earth fill that will raise a flat terrain on the flood plain at the CRN Site to obstruct the overbank flow on the north bank. The applicant presented a USGS contour map of the CRN Site to indicate that the computed PMF

elevation would not be higher than original terrain elevation. The staff will verify that this information as discussed during the audit is included in Section 2.4.3 of the SER.

The staff asked the applicant for clarification on the adequacy of cross-section intervals in the area of the CRN Site, the warning notes relevant to the intervals in the HEC-RAS model output files, and the impact of reducing the cross-section interval on the computed PMF elevation at the CRN Site. The applicant responded that adding flow cross-sections to reduce the intervals would not significantly change the PMF elevation at the CRN Site. The applicant agreed to provide a technical memo and a calculation package regarding cross-section intervals for the staff to review. The staff will verify that this information as discussed during the audit is included in Section 2.4.3 of the SER.

The staff discussed with the applicant how the downstream Highway 58 Bridge and upstream Highway Bridge 95 bounding the CRN Site were considered in the PMF analysis. On April 26, 2017, the staff and the applicant made reconnaissance trips to these bridges. At the bridges, the staff observed stream flow conditions and discussed with the applicant the potential obstructions of the bridges against a high flow condition. The first stop was the Highway 95 Bridge upstream from the CRN Site, where the staff observed the sloped bridge abutments and bridge configuration and estimated the backwater effect on the bridge upstream. The second stop was the Highway 58 Bridge downstream from the CRN Site, where the staff could not access to the north abutment of the Highway 58 Bridge for an observation because of the dense bush around the bridge site. The staff requested that the applicant provide the Highway 58 Bridge profile and relevant hydraulic information shown on an engineering design drawing for the staffs review. The applicant agreed to revise the SSAR and provide the staff the bridge geometry files for the Highway Bridge 58. The staff will verify that this information as discussed during the audit is included in Section 2.4.3 of the SER.

The staff noted that the Highway 58 Bridge, located two miles downstream from the CRN Site, was not included in the HEC-RAS model (ADAMS Accession No. ML16216A115) for flood profile simulations. The NRC staff requested that the applicant provide reasons for this exclusion. The applicant responded that an informal sensitivity analysis showed insignificant increase of the PMF elevation by 0.1 feet (ft) at the CRN Site when the Highway 58 Bridge was included in the HEC-RAS model. The applicant agreed to revise the SSAR mark-ups, as well as provide the staff a calculation package of the sensitivity analysis to support the insignificant 0.1 ft increase of the PMF elevation. The staff will verify that this information as discussed during the audit is included in Section 2.4.3 the SER.

The staff discussed with the applicant the methodology and the calculations that supported the development of the runoff and stream course models and asked how the inflows were calculated for the model calibration. The applicant agreed to revise its SSAR, including descriptions of how the inflows were calculated. The staff will verify that this information as discussed during the audit is included in Section 2.4.3 of the SER.

Model Calibration In the SSAR, the applicant indicated that the flood events in 1973 and 2003 were the largest floods in history at the CRN Site. The staff noted that one of the flood events in 2002 was used to calibrate the HEC-RAS model for the Clinch River and tributaries upstream of Norris Dam.

The staff requested that the applicant clarify the rationale for not including the 2002 flood in the SSAR as one of the largest floods in history at the CRN Site. The applicant clarified that the 2002 flood used in the calibration of the Clinch River and tributaries upstream of Norris Dam

was not a large flood when compared to the 1973 and 2003 floods. Also, the applicant responded that the 1973 and 2003 floods had a more significant impact on the Watts Bar Reservoir than the 2002 flood did. The staff also requested that the applicant provide figures to show the calibration results and the calibration locations for the flood events in 1973, 2002, and 2003. The applicant provided a calculation package for the staff to review and agreed to revise the SSAR. The staff will verify that this information as discussed during the audit is included in Section 2.4.3 of the SER.

The staff requested clarification from the applicant regarding the elevation-storage curves of 12 reservoirs shown in in the SSAR. The applicant agreed to revise the SSAR to discuss the elevation-storage curves for the 12 reservoirs and provided the verification results of three elevation-storage curves, as examples, related with Norris, Melton Hill, and Watts Bar Reservoirs. The staff will verify that this information as discussed during the audit is included in Section 2.4.3 of the SER.

In the SSAR, the applicant stated that the reservoir storage volume curves were verified against the known reservoir volumes. The staff requested that the applicant describe the method and the results of the reservoir volume verification. The applicant agreed to revise the SSAR to include a discussion on the method and figures of the verifications. The staff will verify that this information as discussed during the audit is included in Section 2.4.3 of the SER.

The staff noted that in the SSAR the applicant provided the elevation-storage volume curves of most reservoirs. The staff requested that the applicant provide a discussion and reference for the curves used in the HEC-RAS model calibration. The applicant agreed to revise the SSAR with the discussion and reference, including a calculation package as part of the reference, for the staff to review. The staff will verify that this information as discussed during the audit is included in Section 2.4.3 of its SER.

Hydraulic Parameters In the SSAR, the applicant used the HEC-RAS model to simulate the flood profiles for the PMF and dam failure cases. The staff requested that the applicant provide the detailed information on how the hydraulic parameters were developed and used in the HEC-RAS model. The applicant provided the references to address the development of the cross-sections, dam rating curves, reservoir storage-elevation curves, and unsteady flow rules. The applicant agreed to revise its SSAR with discussions on ineffective flows, impacts of new fills on flood plain storage capacity, and new fills which are above PMF and away from the conveyance channel. The staff will verify that this information as discussed during the audit is included in Section 2.4.3 of the SER.

The staff noted that the applicant provided complex operational curves to reflect the operational rules for three dams that could directly affect the flood elevation at the CRN Site. The staff requested that the applicant provide a simplified illustration showing operational curves of Norris Dam and the applicant agreed to revise the SSAR to provide simplified illustrations of the complex operational curves. In addition, the staff requested that the applicant explain the dam rating curves and how the dam rating curves were applied to the flood mechanism. The applicant agreed to revise the SSAR with the updated the dam rating curves illustrating the relationship between the flood mechanism and the dam rating curve. The staff will verify that this information as discussed during the audit is included in Section 2.4.3 of the SER.

The staff noted that the applicant provided the wind-induced wave height at the CRN Site for a PMF event. The staff requested that the applicant provide a figure to demonstrate the PMF elevation and the fetch length used in the wind wave calculations. The applicant agreed to revise the SSAR to provide a figure to illustrate the PMF elevation in the Clinch River and the fetch length. The staff will verify that this information as discussed during the audit is included in Section 2.4.3 of the SER.

Flood Frequency Analysis The staff requested that the applicant provide a discussion regarding how a 25-year flood and a 500-year flood were computed.

In the SSAR, these floods were coincident events with the occurrence of the breach outflows from seismic dam failures. The applicant explained that the 25-year and 500-year flood hydrographs were first generated by the unit hydrograph method along with the input data from the NOAA Atlas 14 precipitations. Next, the applicant adjusted the volumes of the 25-year and 500-year hydrographs to approximately equal the volumes of the 25-year and 500-year flood volumes generated from flood volume frequency analysis. The applicant agree to revise the SSAR and provide a calculation package. The staff will verify that this information as discussed during the audit is included in Section 2.4.4 of the SER.

HYDROLOGY - GROUNDWATER Groundwater Hydrology - CRN Site and Surrounding Area Tours Info Need IDs 23 through 40 in Appendix C were included in the audit information requests for discussions related to groundwater hydrology. At the TVA Knoxville Complex, the applicant discussed the provided Audit Information Packet which described the hydrology and health physics agenda, maps describing the site tour routes and stops along the way including the site features. After providing a site safety briefing, the applicant provided transportation to the CRN Site and surrounding areas where the staff was given a guided tour of associated site features and dams within the watershed of the CRN site. The CRN Site feature stops included the Bear Creek Water Treatment Plant (WTP), the excavated area for the Clinch River Breeder Reactor Program (CRBRP), the site operation center trailers, the former meteorological tower area, site transmission lines, the Hensley Cemetery, the aquifer pump test area, and the discharge location and nearest residence for the postulated accidental liquid radwaste release. Subsequently, the staff returned to the TVA Knoxville Office Complex and continued discussions related to hydrologic site characteristics, normal PPE and accident liquid and gaseous effluent release source terms, and exposure pathway dose analyses.

GROUNDWATER HYDROLOGY AUDIT Site Parameters Site-specific distribution coefficients for retardation (i.e., Kd values) were used where available, others were taken from the available literature, many of which were available from the Oak Ridge National Laboratory (ORNL) Site in close proximity to the CRN Site. If no Kd value was available for a specific radionuclide, the applicant substituted a conservative value of zero (no retardation). In addition, the lowest flow rate of 400 cubic feet per second (cfs) was used for the dilution term at the Clinch River. The staff noted that the methodology used to derive the minimum flow was not described in the SSAR. The staff requested that the applicant describe how the 400 cfs and associated river flows described in SSAR Section 2.4.13 were derived. The applicant indicated that the 400 cfs was derived from a TVA Hydrologic Task Force Study. The applicant provided a SSAR markup to include a description of the basis for a 400 cfs river flow. The staff will verify that this information as discussed during the audit is included in Section 2.4.13 Accidental Releases of Radioactive Liquid Effluents in Ground and Surface Waters of the SER.

The staff noted that the closest WTP to the site is referred to by different names in the SSAR. The NRC staff requested that the naming of the plant be consistent throughout the SSAR and that the disposition of the plant operation described as idle in the SSAR be clarified to describe the operational status of the WTP and the permit status associated with an idled plant. The applicant provided a SSAR markup. The staff will verify that this information as discussed during the audit is included in Section 2.4.13 of the SER.

The staff and the applicant discussed the characterization of the aquifer and derivation of the aquifer parameters based on the field program conducted by the applicant, the primary flow zones, decreasing fracture density frequency with depth, and methods of deriving permeability of the aquifer intervals. The staff and applicant also discussed construction dewatering and available information from the CRBRP. The applicant noted that very little to no dewatering was needed for CRBRP although the CRN Site excavation may require relatively more dewatering due to an anticipated deeper excavation. The staff will verify that this information as discussed during the audit is included in Section 2.4.12, Groundwater of the SER.

The staff and applicant discussed the last known status of the CRBRP. The Historical Site Assessment (HSA) redress plan developed by the TVA/Department of Energy (DOE) was made available for review. The staff reviewed the HSA redress plan and the Atomic Safety and Licensing Boards (ALSBs) 1985 order (ADAMS Accession No. ML16357A775) related to a review of the HSA redress plan which described the orderly shutdown of CRBRP site construction activities. The staff found that the HSA and the ASLBs order described the last know status of the CRBRP, but the disposition of borings and wells used to characterize the CRBRP were not mentioned in the HSA redress plan or ALSBs order. The applicant indicated that the disposition of the CRBRP wells and borings installed are unknown and no evidence of these were found during the CRNS site characterization and field study activities. The staff will verify that this information as discussed during the audit is included in Section 2.4.12 of the SER.

The staff and applicant discussed the inconsistencies in describing the backfill in the SSAR. While the backfill is specifically described as Tennessee Department of Transportation Type A aggregate in SSAR Section 2.5, the NRC staff requested that SSAR Sections 2.4.12 and 2.4.13 be consistent in describing the construction backfill and characterization of the

hydraulic properties of the backfill as described in SSAR Section 2.5. The applicant agreed to perform a consistency check and provide SSAR markups. The staff will verify that this information as discussed during the audit is included in Sections 2.4.12 and 2.4.13 of the SER.

The staff and the applicant discussed the applicability of using information from a June 23, 2011, DOE study to support the applicants conceptualization of the Clinch River as a groundwater flow boundary. The staff noted that there is an additional and more recent 2013 DOE study (which remains in draft form) describing groundwater flow conditions in the CRN Site vicinity. The applicant has reviewed the draft report for the 2013 DOE study; however, as noted the draft report is not referenceable in its current form. The staff noted that the 2011 DOE report does not unequivocally state that there is no groundwater flow beneath the Clinch River and that more recent studies by the DOE, site data and relevant publications should be reviewed to fully bound the site conceptual flow model in the SSAR, as appropriate. The applicant agreed to evaluate the more recent reports, data and site information. The description of additional studies and information was included in a proposed SSAR markup (ADAMS Accession No. ML17237C084). The staff will verify that this information as discussed during the audit is included in Sections 2.4.12 and 2.4.13 of the SER.

The staff met with the Tennessee Department of Environment and Conservation (TDEC) and the DOE on May 16, 2017, concerning recent DOE studies that indicate potential groundwater flow under the Clinch River from the ORNL to an area approximately two miles east of the CRN Site. Based on these discussions, the information provided by TDEC and DOE, the staff confirmed that the applicants understanding of the CRN Site should include a more in depth evaluation of the Clinch River as a hydrologic boundary for groundwater flow from the CRN Site. The staff will verify that this information as discussed during the audit (ADAMS Accession No. ML17237C084) is included in Sections 2.4.12 and 13 of the SER. Based on the staffs conversations with the DOE and TDEC, the DOE indicated that their study findings are currently being developed into a draft report which will not be finalized for at least one year and likely longer. During a subsequent staff conversation on September 13, 2017, the DOE and the USGS, the DOE indicated that over the next one to two years the USGS will be also be developing a refined groundwater modeling study of the ORR that will include the area of the CRN Site. The staff communicated this information to the applicant during a September 18, 2017, call requesting that that the applicant review the DOE study once available to evaluate any new and significant information that may affect the conceptual understanding of the CRN Site groundwater flow system.

While the applicant described community groundwater users in the site vicinity, the staff noted a lack of description in the SSAR regarding individual groundwater users in the area of the CRN Site. The staff noted that residential locations are shown on ER Figure 2.7.6-1 and had questions concerning the data used for the residential locations and how the data was collected. The applicant clarified that the data was collected through observations made by drive-by surveys using a hand-held global positioning system to locate the residential locations.

The staff requested that the applicant gather the available information on individual residential users from databases such as those maintained by TDEC and ORNL and include this information in the SSAR Sections 2.4.1 and 2.4.12. The staff and applicant discussed potential sources of additional data on individual groundwater users, including information from ORNL and the TDEC. Based on these discussions with the staff, the applicant contacted TDEC to obtain and review sources of additional data and to update the SSAR with a discussion of these data sources and individual groundwater users in the vicinity of the site. The applicant provided

a SSAR markup with this information (ADAMS Accession No. ML17200C887). The staff will verify that this information as discussed during the audit is included in Section 2.4.12 of the SER.

Postulated Accidental Liquid Radwaste Tank Failure Analysis As part of the CRN Site tour, the staff visited the discharge location for the postulated accidental liquid radwaste tank failure and observed the receptor location (nearest residence) in the southwest meteorological directional sector. The methodology, model, parameters, and assumptions considered in the accidental liquid effluent release source term and postulated accidental liquid radwaste tank failure analysis is described in SSAR Section 2.4.13.

The staff and applicant discussed the basis of the accidental liquid effluent release source term for the two proposed vendors. The applicant assigned alphabetical identifiers (i.e., Vendors A and B) in lieu of vendor names to avoid identification of trade names associated with the accidental liquid effluent release source terms is provided in SSAR Section 2.0, Tables 2.0-5, 2.4.13-1, and 2.4.13-2. The basis of the accidental liquid effluent release source term is described in the TVA letter to the NRC dated December 2, 2016 (ADAMS Accession No. ML16340A258).

The staff requested clarification from the applicant as to which vendor was considered for the postulated accidental liquid radwaste tank failure analysis, the failed fuel percentage used in the accidental liquid effluent release source term, and the volume of the liquid radwaste tank used. The applicant clarified that the accidental liquid effluent release source term based on one percent failed fuel was for Vendor A and the liquid radwaste tank volume was 10,000 gallons. The applicant explained the rationale for selecting the accidental liquid effluent release source term in the postulated accidental liquid radwaste tank failure analysis. The staff noted that the applicant used an one percent failed fuel fraction while the guidance in DC/COL-ISG-013, Assessing the Radiological Consequences of Accidental Releases of Radioactive Materials from Liquid Waste Tanks for Combined License Applications (ADAMS Accession No. ML12191A325, as incorporated into BTP 11-6, Postulated Radioactive Releases Due to Liquid-containing Tank Failures (ADAMS Accession No. ML15027A401)),

suggests that radionuclide concentrations and the total inventory of radioactive materials used is based on an expected failed fuel fraction of 0.12 percent of the operating fission product core inventory being released to the primary coolant for a pressurized water reactor. The staff requested that the applicant identify the failed fuel fraction for the postulated accidental liquid radwaste tank failure analysis in the ESP Application. The applicant indicated that the vendor assumed this high failed fuel fraction in the accidental liquid effluent release source term for conservatism. The applicant provided a SSAR markup (ADAMS Accession No. ML17178A330) with this information. The staff will verify that this information as discussed during the audit is included in Section 2.4.13 of the SER.

The staff and applicant discussed the use of the dose conversion factors for ingestion from Federal Guidance Report (FGR) 11 (Environmental Protection Agency, EPA 520/1-88-020, Federal Guidance Report No. 11, Limiting Values of Radionuclide Intake and Air Concentration and Dose Conversion Factors for Inhalation, Submersion, and Ingestion (1988))

and the dose conversion factors for ground deposition and immersion from FGR 12 (EPA, EPA-402-R-93-081, Federal Guidance Report No. 12, External Exposure to Radionuclides in Air, Water, and Soil, (1993)). The LADTAP II code calculates total body and organ doses; whereas, the pubic dose limit in 10 CFR 20.1301 is expressed in total effective dose equivalent (TEDE). The applicant provided the electronic files in native format for the hydrology and health

physics codes (ADAMS Accession No. ML16280A066). The staff will verify that this information as discussed during the audit is included in Section 2.4.13 of the SER.

The staff noted that the accidental liquid effluent release source term with one percent failed fuel results in a calculated exposure pathway dose of 93 millirem (mrem) TEDE using the guidance in Regulatory Guide (RG) 1.109, Revision 1, Calculation of Annual Doses to Man - From Routine Releases of Reactor Effluents for the Purpose of Evaluating Compliance with 10 CFR Part 50, Appendix I and the dose conversion factors in FGRs 11 and 12, which is near the annual NRC dose limit of 100 mrem TEDE to a member of the public. The applicant acknowledged that this calculated dose is near the public dose limit, but given the conservative nature of the postulated accidental liquid radwaste tank failure analysis and its assumptions, the calculated dose complies with the NRC public dose limit.

The staff and applicant discussed the applicability of the radionuclide transport equations described in NUREG/CR-3332, Radiological Assessment, A Textbook on Environmental Dose Analysis" (2009) (ADAMS Accession No. ML091770419) as applied in Equation 2.4.13-1 in SSAR Section 2.4.13 with the accidental liquid effluent release source term, radionuclide characteristics, and dilution parameters, and the correct groundwater dilution equation (Equation 4.41) in NUREG/CR3332. The applicant demonstrated how the NUREG/CR-3332 transport/dilution equations were translated to Excel spreadsheet calculations by stepping through the equations, parameters, and assumptions. The staff and applicant discussed SSAR Table 2.4.13-5 to gain a better understanding on how the radionuclide transport analysis was implemented. The applicant agreed with the staffs request to include the S.W. Taylor and H. Guha reference (Groundwater 55, no. 1: 63-72) providing the applicability and methodology for the NUREG/CR-3332 radionuclide transport equations in a SSAR markup. In addition, the applicant agreed with the staffs request to provide the Excel spreadsheet calculations in native format. The applicant provided the SSAR markup (ADAMS Accession No. ML17167A150) and Excel spreadsheet in native format (ADAMS Accession No. ML17143A417) for the staff to review. The staff will verify that this information as discussed during the audit is included in Section 2.4.13 of the SER.

The staff and applicant discussed the additional conservatisms and the approach used in the radionuclide transport analysis. Conservatisms outlined by the applicant included decaying terms to 50 years to allow selection of the peak daughter product activities for use in the resulting dose calculations. Time to peak activity concentrations were evaluated based on a transport travel time to the receptor of less than one year for all peak activity concentrations regardless of when the time to peak concentrations were calculated providing additional conservatisms. Therefore, all peak activity concentrations are assumed to arrive at the receptor simultaneously with peak activity concentrations coinciding with the travel time (less than one year).

The methodology of the NUREG/CR-3332 radionuclide transport equations and assumptions is used in the radionuclide transport analysis to calculate the exposure pathway dose to a member of the public at the nearest unrestricted area. The staff will verify that this information as discussed during the audit is included in Section 2.4.13 of the SER.

HEALTH PHYSICS Health Physics - CRN Site and Surrounding Area Tours In addition to the discussion and areas toured as described above in Groundwater Hydrology -

CRN Site and Surrounding Area Tours, the staff also visited the discharge location for normal liquid effluent releases at the Clinch River Mile 15.5 and receptor locations for the nearest beef cattle, nearest garden and nearest residence used in calculating the exposure pathway doses from normal PPE and accidental liquid and gaseous effluent releases.

The CRN Site Land Use Survey conducted on January 7-10, 2014 (completed on April 21-22, 2014), is used for determining the receptor locations in the exposure pathway analyses for calculating the maximally exposed individual (MEI) and population doses described in RG 1.109. Results from the CRN Site Land Use Survey identified the nearest beef cattle, nearest garden and nearest residence, and did not show any dairy cows and goats within a 5 mile radius surrounding the CRN Site. For the purpose of calculating the population dose at the 50 mile boundary, the applicant conservatively considered dairy cows and dairy goats within a 50 mile radius. Receptor locations for the nearest beef cattle, nearest garden and nearest residence comprise three physical locations in the ER Chapter 2, Environmental Description Figure 2.7.6-1, Location of Sensitive Receptors (Land Use Survey) show receptor locations in close proximity with one another and in the same west northwest directional sector.

Information from the CRN Site Land Use Survey is used in the exposure pathway dose analyses for calculating the MEI and population doses SSAR Sections 11.2.3, Liquid Effluent Releases and 11.3.3, Gaseous Effluent Releases. The staff will verify that this information as discussed during the audit is included in Sections 11.2.3 and 11.3.3 of the SER.

HEALTH PHYSICS AUDIT Info Need IDs 41 through 44 in Appendix C were included in the audit information requests for discussions related to health physics. In support of the staffs review of the ESP Application and the safety audit, the applicant submitted electronic files in native format for the health physics codes (LADTAP II, GASPAR II, and XOQDOQ) with the TVA letter to the NRC dated September 30, 2016 (ADAMS Accession No. ML16280A066), and submitted supplemental information in the TVA letter to the NRC dated December 2, 2016 (ADAMS Accession No. ML16340A258).

Normal PPE Liquid and Gaseous Effluent Release Source Terms and Exposure Pathway Doses The staff and applicant discussed the basis of the normal PPE liquid and gaseous effluent release source term developed from the four potential vendors identified in SSAR Section 1.11, Overview of Reactor Types. The applicant assigned numerical identifiers (i.e., 1 through 4) in lieu of vendor names to avoid identification of trade names. The basis of the normal effluent release source term is described in the TVA letter to the NRC dated December 2, 2016 (ADAMS Accession No. ML16340A258).

In the December 2, 2016 submittal, the applicant provided unit average annual normal liquid and gaseous effluent release rates for radionuclides in Curies per year (Ci/y) for Vendors 1 through 4 in Table 10-A, One Unit Average Annual Normal Liquid Radioactive Release of , Basis of Source Term for Normal Liquid Radioactive Effluent Release and Table 7-A, One Unit Average Annual Normal Gaseous Radioactive Release of Attachment 3,

Basis of Source Term for Normal Gaseous Radioactive Effluent Release, respectively.

Composite Tables 10-A of Attachment 2 and Table 7-A of Attachment 3 show the selected average annual normal liquid and gaseous effluent release rates on a per unit basis for each vendor.

The staff and applicant discussed the design information (e.g., number of units, power levels) used for calculating the site effluent release rates for each vendor. Site average annual normal liquid and gaseous effluent release rates that apply the vendor design information are provided in Table 10-B, Site Average Annual Normal Liquid Radioactive Release of Attachment 2 and Table 7-B, Site Average Annual Normal Gaseous Radioactive Release of Attachment 3, respectively. Composite Tables 10-B and 7-B show the selected average annual normal liquid and gaseous effluent release rates, respectively, on a site basis for each vendor, which represent the normal PPE liquid and gaseous effluent release source terms that bound the surrogate plant.

From the staffs confirmatory analyses, it was observed that the highest unit and site average annual liquid effluent release rates for Te-129 and Te-131 were not selected in Composite Tables 10-A and 10-B, which impacts SSAR Tables 2.0-6, Annual Normal Liquid Radioactive Release (Ci/y) and 11.2-4, Projected Liquid Radioactive Effluent Concentrations in Watts Bar Reservoir and ER Chapter 3, Tables 3.5-1, CRN Site Projected Average Normal Liquid Radioactive Release and 3.5-2, Liquid Effluent Activities Per Reactor. The staff and applicant discussed the unit and site average annual Te-129 and Te-131 liquid effluent release rates and the dose consequence. The applicant agreed to evaluate the unit and site average annual Te-129 and Te-131 liquid effluent release rates and its calculated exposure pathway dose. The staff will verify that this information as discussed during the audit is included in Section 11.2.3 of the SER.

The applicant used the site average annual liquid and gaseous effluent release rates for developing the surrogate plant considering the guidance in Nuclear Energy Institute 10-01, Revision 1, Industry Guidance for Developing a Plant Parameter Envelope in Support of an Early Site Permit (2012). Site average annual effluent release rates for the surrogate plant (i.e., normal PPE liquid and gaseous effluent release source terms) are given in SSAR Section 2.0, Plant Parameter Envelope, Table 2.0-6, Annual Normal Liquid Radioactive Release (Ci/y) and in Table 2.0-4, Annual Normal Gaseous Radioactive Release (Ci/y).

Normal PPE liquid and gaseous effluent release source terms are used in SSAR Sections 11.2.3 and 11.3.3 to calculate exposure pathway doses with the LADTAP II (NUREG/CR-4013, LADTAP II - Technical Reference and User Guide (1986) (ADAMS Accession No. ML14098A069) and GASPAR II (NUREG/CR-4653, GASPAR II - Technical Reference and User Guide (1987) (ADAMS Accession No. ML14098A066) codes.

The staff discussed with the applicant its evaluation of vendor provided information in selecting the unit and site average annual normal liquid and gaseous effluent release rates. As described in Attachments 2 and 3 of the December 2, 2016 submittal, and noted in the composite tables, adjustments are made on a case-by-case basis to exclude, reduce, or increase release rates for certain radionuclides based on the amount of conservatism and maturity of the source terms available from the vendors. An evaluation is performed on the adjusted release rates to ensure that the dose consequences are conservative compared to source terms for large light water reactors scaled to a comparable thermal power output for the CRN Site, and are reasonable for use. The staff will verify that this information as discussed during the audit is included in Section 11.4, Technical Evaluation of the SER.

Accidental PPE Liquid Effluent Release Source Terms and Exposure Pathway Dose In support of the Groundwater Hydrology portion of the audit, the staff and applicant discussed the basis of the accidental liquid effluent release source term, radionuclide transport equations, and the applicants calculation of the exposure pathway dose to a member of the public which is described above in Postulated Accidental Liquid Radwaste Tank Failure Analysis.

The staff noted that Tc-99 is identified as a radionuclide in the unit and site average annual liquid effluent release rates and composite tables in Tables 10-B and 10-A of Attachment 2, and SSAR Table 2.0-6 for the normal PPE liquid effluent release source term; however, Tc-99 is not identified in Tables 11-A and 11-B of Attachment 4, and SSAR Tables 2.0-5, 2.4.13-1, and 2.4.13-2 for the accidental PPE liquid effluent release source term. The guidance in DC/COL-ISG-013 (ADAMS Accession No. ML12191A325, as incorporated into BTP 11-6 (ADAMS Accession No. ML15027A401)) describes long-lived, hard-to-detect, radionuclides such as Tc-99 that are highly mobile in the environment should be included in any assessment of an accidental release of radioactive material from liquid radwaste tanks. Therefore, the staff requested that the applicant include Tc-99 in the accidental PPE liquid effluent release source term and exposure pathway dose analysis or justify its exclusion. The applicant agreed to evaluate the inclusion or exclusion of Tc-99 in the accidental PPE liquid effluent release source term. The staff will verify that this information as discussed during the audit is included in Section 2.4.13 of the SER.

As a result of staff and applicant discussions during the health physics audit, the applicant submitted SSAR markups and additional information in the TVA letters to the NRC dated May 11, 2017 (ADAMS Accession No. ML17143A417), June 16, 2017 (ADAMS Accession No. ML17167A150), and June 26, 2017 (ADAMS Accession No. ML17178A330). The staff will verify that this information as discussed during the audit is included in the respective sections of the SER.

APPENDIX A: HYDROLOGY AND HEALTH PHYSICS SAFETY AUDIT AGENDA APRIL 17-19, 2017 AND APRIL 24-27, 2017 APRIL 17-19, 2017 April 17, 2017 Audit at TVA (Bechtel) offices - All Application overview - TVA Begin Audit - All Breakout sessions - All Daily debrief - NRC and TVA April 18, 2017 Breakout sessions continue Lunch Daily debrief - NRC and TVA April 19, 2017 Breakout sessions continue Lunch Daily debrief - NRC and TVA APRIL 24-27, 2017 April 24, 2017 April 26, 2017 Audit at TVA offices - All Breakout sessions continue Application overview - TVA Lunch Begin Audit - All Daily debrief - NRC and TVA Breakout sessions - All Daily debrief - NRC and TVA April 27, 2017 April 25, 2017 Breakout sessions continue Lunch Meeting with Site Tours Final briefing and closeout- NRC Breakout sessions continue Lunch Daily debrief - NRC and TVA Enclosure 3

APPENDIX B: AUDIT PARTICIPANTS April 17-19, 2017 Name Affiliation Clement, Richard NRC Giacinto, Joseph NRC Sutton, Mallecia NRC Bogema, Harrison TVA Brellenthin, Jack TVA Casey, Kevin TVA Hastings, Peter TVA Holcomb, John TVA Horton, Ruth TVA Justice, Wally TVA Klein, Spencer TVA Lundy, Dennis TVA Montague, Kelvin TVA Perry, Jeff TVA Schiele, Ray TVA Scott, Roger TVA Shirk, Susan TVA Stout, Dan TVA Thomas, John TVA Young, Alex TVA Cahill, Tim Bechtel Power Corporation Carr, Becky Bechtel Power Corporation Carson, Alice Bechtel Power Corporation Guha, Hillol Bechtel Power Corporation Hummer, Kim Bechtel Power Corporation Jha, Ken Bechtel Power Corporation Taylor, Stewart Bechtel Power Corporation Enclosure 4

APPENDIX B: AUDIT PARTICIPANTS April 24-27, 2017 Name Affiliation Breithaupt, Stephen NRC Cheng, Yuan NRC Clement, Richard NRC Giacinto, Joseph NRC Sutton, Mallecia NRC Brellenthin, Jack TVA Casey, Kevin TVA Carboni, Karen TVA Hastings, Peter TVA Holcomb, John TVA Hasan, Husein TVA Klein, Spencer TVA Lundy, Dennis TVA Montague, Kelvin TVA Montgomery, Colleen TVA Perry, Jeff TVA Schiele, Ray TVA Scott, Roger TVA Smith, Shandon TVA Stout, Dan TVA Thomas, John TVA Young, Alex TVA Criscenzo, Stephen AMEC Carr, Becky Bechtel Power Corporation Carson, Alice Bechtel Power Corporation Guha, Hillol Bechtel Power Corporation Taylor, Stewart Bechtel Power Corporation Cropp, Trevor BWSC Henry, Stu BWSC Murr, Andrew BWSC Taylor, Kevin AECOM

Appendix C: CRN Site Information Need Status Info Information Need Status Comments Need ID Description Hydrology - Surface Water The former Oak Ridge Water Treatment Plant is described as having an active surface water withdrawal permit. Please Review team clarified provide an SME to discuss the disposition of the active permit understanding of TVAs water with respect to the former plant. The Oak Ridge Bear Creek withdrawal permit description Plant is not listed in Table 2.4.1. Although this plant appears Closed through audit through audit discussions and 1-a to be the closest to the CRN Site based on Figure 2.4.1-1, the activities review of supplemental SSAR text indicates that the former Oak Ridge Water information provided to the Treatment Plant is the closest withdrawal permit. Please CRN Site ESP docket.

provide an SME to clarify which permitted surface water (ML17157B212) withdrawal location is closest to the CRN Site and actively withdrawing water.

The Oak Ridge Bear Creek Plant is not listed in Table 2.4.1. Review team clarified Although this plant appears to be the closest to the CRN Site understanding of TVAs water based on Figure 2.4.1-1, the SSAR text indicates that the treatment plant naming former Oak Ridge Water Treatment Pl ant is the closest Closed through audit convention through audit 1-b withdrawal permit. Please provide an SME to clarify which activities discussions and review of permitted surface water withdrawal location is closest to the supplemental information CRN Site and actively withdrawing water. provided to the CRN Site ESP docket. (ML17157B212)

Enclosure 5

Please provided an SME to discuss the allowed uses of an Staff clarified its industrial water permit and if such a permit could include understanding of industrial Closed through audit 1-c potable water uses within the permitted facility waste water permit uses activities through audit discussions and document reviews.

There seems to be two figures with the same figure number; one within "TVA_CR_ESPA_SSAR_CHAP02_SEC02-03.pdf" as "Figure 2.3.2-1. Local Topography in the Clinch River Staff clarified its Nuclear Site Vicinity." and one within understanding of the figure "TVA_CR_ESPA_PART07A.pdf"; as "Figure 2.3.2-1. Surface Closed through audit 1-d titles through audit Water Intakes near the CRN Site in Anderson, Knox, Loudon, activities discussions and document Meigs, Morgan, Rhea, and Roane Counties." Please clarify or reviews.

correct the figure number(s) and identify the surface water intake labeled as "9723" shown the second Figure 2.3 .2-1 above.

The SSAR discussion provides information on surface water Review team clarified aspects of the hydrosphere but no information on understanding of TVAs groundwater. Please provide a discussion of the groundwater groundwater information portion of the hydrosphere in the SSAR. Closed through audit sources through audit 1-e activities discussions and review of supplemental information provided to the CRN Site ESP docket. (ML17200C887)

The SSAR discusses the Reservoir Operations Study (ROS) Review team clarified that included changes in minimum flow requirements and understanding of TVAs ROS flood control operations on releases. Please provide a copy of through audit discussions and the ROS and identify pertinent sections ROS relevant to the Closed through audit review of supplemental 1-f CRN Site. activities information provided to the CRN Site ESP docket.

(ML17158B342, ML17206A090)

The SSAR provides a brief discussion of the flood history at Review team clarified the CRN Site including a table of historic floods on the Clinch understanding of TVAs flood River Arm of Watts Bar Reservoir (Table 2.4.2-1 of SSAR.)

elevations and profiles The staff note that two of the flood elevations are derived from Closed through audit through audit discussions and 2 model calibration, while others are derived from historic flood activities review of supplemental profiles and a Clinch River flood report. For the historical information provided to the flood profiles, please provide the source of the information.

CRN Site ESP docket.

For the flood report, please provide discussion about how (ML17157B212) these elevations were developed.

The SSAR provides a discussion of potential flooding events Review team clarified that could affect the CRN Site. Clarify why the discussion of understanding of TVAs Flooding from Dam Breaches and Failures only includes flooding from dam breaches sunny day dam failures when hydrologic and seismic dam Closed through audit through audit discussions and 3

failures are also important. activities review of supplemental information provided to the CRN Site ESP docket.

(ML17157B212)

The SSAR states that site drainage can reasonably take full Review team clarified advantage of the current topography and provide more than understanding of TVAs site adequate runoff capability... with flow directed to Clinch River drainage plan with respect to arm of Watts Bar Reservoir. Since the CRN Site drainage Closed through audit LIP through audit discussions 4-a plan has not been provided, please clarify how it can activities and review of supplemental reasonably be assumed from the current topography that information provided to the adequate drainage during local intense precipitation (LIP) can CRN Site ESP docket.

be achieved. (ML17157B212)

The SSAR provides a brief discussion of precipitation Review team clarified distribution. Provide a detailed discussion in the SSAR on the understanding of TVAs development of the precipitation distribution at the CRN Site. precipitation distributions Provide a Subject Matter Expert (SME) who can discuss the Closed through audit through audit discussions and 4-b methods supporting estimation of LIP. activities review of supplemental information provided to the CRN Site ESP docket.

(ML17157B212)

The SSAR discusses several PMP storms that were analyzed Review team clarified for the probable maximum flood (PMF) analysis, including understanding of TVAs PMP their temporal distribution; however, discussion of the storms for PMF analysis methods in sufficient detail is not included in the SSAR for Closed through audit through audit discussions and 5-a staff evaluation. Please provide a discussion of the methods activities review of supplemental and calculations of the PMP development for the four types of information provided to the events in the SSAR. The discussion in the SSAR should be in CRN Site ESP docket.

sufficient detail for staff to evaluate the PMP development. (ML17157B212)

The SSAR states that the PMP storm has a depth of 17.5 Review team clarified inches in the watershed upstream Watts Bar Dam. Please understanding of TVAs PMP provide a discussion of sufficient detail in the SSAR on how storm depth through audit Closed through audit 5-b this depth was determined, since the reference provided discussions and review of activities (HMR-41) only provides the depth for a 7980 mi2 basin, which supplemental information can be moved along the primary axis of the Tennessee River. provided to the CRN Site ESP docket. (ML17157B212)

Please clarify why nonlinear adjustment of unit hydrographs Review team clarified (UHs) is included in the SSAR as a component of precipitation understanding of TVAs UHs losses. and precipitation losses Closed through audit through audit discussions and 6

activities review of supplemental information provided to the CRN Site ESP docket.

(ML17157B212)

The SSAR states the UHs are used in the runoff model; Review team clarified however, no discussion or reference is provided as to how the understanding of TVAs UH UHs were developed. Please provide a discussion or a development and validation reference to a document in the SSRA of how the UHs were Closed through audit through audit discussions and 7-a developed including the validation of the UHs. activities review of supplemental information provided to the CRN Site ESP docket.

(ML17157B212)

The SSAR states that storage volumes from projects identified Review team clarified in the National Inventory of Dams (NID) were included in understanding of TVAs runoff and inflow hydrograph development. Please clarify in storage volume from NID the SSAR how the storage volume from NID dams was used dams and inflow development Closed through audit 7-b to develop inflow hydrographs. through audit discussions and activities review of supplemental information provided to the CRN Site ESP docket.

(ML17157B212)

Provide an SME who can discuss the methods supporting Review team clarified dam breach outflow estimates for NID dams. understanding of TVAs methods supporting dam breach outflow estimates Closed through audit 7-c through audit discussions and activities review of supplemental information provided to the CRN Site ESP docket.

(ML17157B212)

The staffs examination of the HEC-RAS model found only Review team clarified one cross section located at the CRN Site. Please explain the understanding of TVAs HEC-adequacy of the HEC-RAS model cross sections interval in RAS model through audit relation to the geometry of the CRN Site. Closed through audit discussions and review of 8-a activities supplemental information provided to the CRN Site ESP docket. (ML17157B212, ML17171A335)

The staffs examination of the HEC-RAS model found that the Review team clarified cross sections are placed in the vicinity of the CRN Site at understanding of TVAs model approximately 2-mile intervals. Explain the how the model geometry through audit geometry accurately sufficiently describes the Clinch River Closed through audit discussions and review of 8-b geometry in the vicinity of the CRN Site. activities supplemental information provided to the CRN Site ESP docket. (ML17157B212, ML17171A335)

The staffs examination of the HEC-RAS model found that the Review team clarified Highway 58 Bridge and its abutments were not included, understanding of TVAs though they could produce a backwater effect on the PMF representation of the Highway elevation at the CRN Site. Please explain why the bridge was 58 bridge through audit Closed through audit 8-c not included in the model. discussions and review of activities supplemental information provided to the CRN Site ESP docket. (ML17157B212, ML17206A090)

The SSAR provides a brief description of the HEC-RAS model Review team clarified used for PMF and dam failure analyses. Please provide a understanding of TVAs PMF discussion in the SSAR with sufficient detail on the and dam failure analysis development of the HEC-RAS model. The discussion should Closed through audit through audit discussions and 8-d include (but not be limited to) development of cross sections activities review of supplemental and their layout, dam rating curves, elevation-storage curves, information provided to the and dam operations rules. CRN Site ESP docket.

(ML17157B212)

Please provide an SME who can discuss the methods and Staff clarified its calculations supporting runoff and stream course model Closed through audit understanding of this topic 8-e development, as well as the methods and calculations for dam activities through audit discussions and operations. document reviews.

The SSAR states that storage volume curves were verified Review team clarified against the known reservoir volume. Please provide a understanding of TVAs discussion in sufficient detail in the SSAR that describes the storage volume verifications methods and results of the reservoir volume verification. Also, Closed through audit through audit discussions and 9-a provide figures in the SSAR that show the methods and activities review of supplemental results. information provided to the CRN Site ESP docket.

(ML17157B212)

The staff noted that figures in SSAR Section 2.4.4 provided Review team clarified the elevation-storage curves for most (if not all) the reservoirs understanding of TVAs included in the CRN Site analysis. Please provide a reference reference to elevation-storage and discussion in the SSAR of those figures as it pertains to Closed through audit curves through audit 9-b calibration of the HEC-RAS model. activities discussions and review of supplemental information provided to the CRN Site ESP docket. (ML17157B212)

The SSAR states that flood elevations were calibrated in three different model sections. For the first two sections, from the confluence of the Clinch River with the Tennessee River to Melton Hill Dam and from Melton Hill Dam to Norris Dam, the calibration was at three locations for the 1973 and 2003 floods. Please: (1) Clarify that these flood events were Review team clarified previously presented in SSAR Section 2.4.2.1 Flood History; understanding of TVAs flood (2) Provide a figure in the SSAR showing the calibration point evaluations through audit Closed through audit 9-c locations; and, (3) Provide figures in the SSAR showing the discussions and review of activities calibration results for both of the flood events. For the supplemental information upstream sections from Norris Dam to the tributaries of the provided to the CRN Site ESP Clinch River, the floods from 2002 and 2003 were used for docket. (ML17157B212) calibration. Please: (1) Clarify why the 2002 flood was not included in Section 2.4.2.1; (2) Provide a figure in the SSAR showing the calibration point locations; and, (3) Provide figures in the SSAR showing the calibration results for both of the flood events.

The SSAR provides a general discussion of the inclusion of operational rules and rating curves for the three dams that directly affect the water surface elevation at the CRN Site.

SSAR Figures 2.4.3-4 through 2.4.3-6 provide the illustration Review team clarified of the operational rules. The staff notes that these are understanding of TVAs relatively complex figures illustrating the anticipated operational and rating curves operations during a flood event. SSAR Figures 2.4.3-7 Closed through audit through audit discussions and 10 through 2.4.3-9 provide the rating curves for various cases. activities review of supplemental However, these cases are not discussed in this section. In the information provided to the SSAR, please provide a discussion as an example that follows CRN Site ESP docket.

the operational curve of the Norris Dam. Also, provide a (ML17157B212) discussion in the SSAR of the various cases presented in the rating curve figures and state which of those were applied to the flood mechanisms evaluated.

Please provide an SME familiar with the methods and The staff clarified its calculations supporting runoff and stream course model Closed through audit understanding of this topic 11 development who can assist in showing how the PMF activities through audit discussions and analyses applies to the CRN Site. document reviews.

Please provide an SME to explain how bridges bounding the The staff clarified its CRN Site, (Highway 58 Bridge downstream and Highway 95 Closed through audit understanding of this topic 12 Bridge upstream), are considered in the PMF analyses. activities through audit discussions and document reviews.

Please provide an SME familiar with the methods and The staff clarified its calculations supporting runoff and stream course model Closed through audit understanding of this topic 13 development who can assist in showing how the PMF activities through audit discussions and analyses applies to the Melton Hill Dam site. document reviews.

Please provide an SME familiar with the methods and The staff clarified its calculations supporting runoff and stream course model Closed through audit understanding of this topic 14 development who can relate the analyses to the site- activities through audit discussions and associated dam sites. document reviews.

Please provide citations and references for the Von Thun and Review team clarified Gillette method used in the hydrologic dam failure analysis. understanding of TVAs citations and references Closed through audit through audit discussions and 15 activities review of supplemental information provided to the CRN Site ESP docket.

(ML17157B212)

The SSAR provides the PMF elevation at a location just Review team clarified upstream of the intake. The staffs examination of the HEC- understanding of TVAs HEC-RAS model found only one cross section located at the CRN RAS cross section intervals Site. Explain the adequacy of the HEC-RAS model cross Closed through audit through audit discussions and 16 sections interval in relation to the Clinch river geometry of the activities review of supplemental CRN Site. information provided to the CRN Site ESP docket.

(ML17157B212)

The SSAR provides a discussion of the calculation of wind Review team clarified wave elevation during the PMF. Please provide a figure in the understanding of TVAs wind SSAR that illustrates the PMF elevation in the Clinch River fetch length and PMF and the estimation of the fetch length used in the wind wave Closed through audit elevation through audit 17 calculations. activities discussions and review of supplemental information provided to the CRN Site ESP docket. (ML17157B212)

The SSAR cites a schematic figure of the dams in the TVA Review team clarified system. Please provide a Geographical Information System understanding of TVAs dam (georeferenced) map in the SSAR that shows the location of locations through audit Closed through audit 18-a all dams upstream of Watts Bar Dam in relation to the layout discussions and review of activities of the Tennessee River and its tributaries. supplemental information provided to the CRN Site ESP docket. (ML17157B212)

The SSAR includes Figure 2.4.4-1 illustrating the elevation- Review team clarified storage curves for 12 reservoirs examined in the flooding understanding of TVAs river analysis at the CRN Site. The figure is cited but is not course set up reference discussed. The staff note that this important information is Closed through audit through audit discussions and 18-b relevant to the analyses discussed in SSAR Section 2.4.3. activities review of supplemental Please provide a reference to the SSAR Figure 2.4.4-1 in information provided to the discussions in SSAR Section 2.4.3 on the set up of the river CRN Site ESP docket.

course model. (ML17157B212)

Please provide an SME who can discuss the methods and NRC staff clarified its calculations for seismic and hydrologic dam failure. Closed through audit understanding of this topic 19-a activities through audit discussions and document reviews.

Provide an SME who can discuss the methods supporting Review team clarified dam breach outflow estimates for NID dams. understanding of TVAs methods of dam breach outflow estimates for NID Closed through audit 19-b dams through audit activities discussions and review of supplemental information provided to the CRN Site ESP docket. (ML17157B212)

The SSAR states that either a 25-year or 500-year coincident Review team clarified flood events were assumed to occur with seismic dam failure. understanding of TVAs Please provide discussion in the SSAR with sufficient detail of methods for the 25-year and the methods and inflows for each of the assumed flood 500-year coincident flood Closed through audit 20 events. events through audit activities discussions and review of supplemental information provided to the CRN Site ESP docket. (ML17157B212)

Provide an SME who can discuss the methods supporting NRC staff clarified its calculations of flood wave routing with dam failures. Closed through audit understanding of this topic 21-a activities through audit discussions and document reviews.

Please provide an SME who can discuss the methods Review team clarified supporting calculations of 25-year and 500-year floods. understanding of TVAs supporting calculations for the 25-year and 500-year Closed through audit coincident flood events 21-b activities through audit discussions and review of supplemental information provided to the CRN Site ESP docket.

(ML17157B212)

The SSAR provides a discussion of the calculation of wind Review team clarified wave elevation during the controlling flood event. Please understanding of TVAs PMF provide a figure in the SSAR that illustrates the PMF elevation and wind wave elevation in the Clinch River and the estimation of the fetch length used Closed through audit through audit discussions and 22 in the wind wave calculations. activities review of supplemental information provided to the CRN Site ESP docket.

(ML17157B212)

Hydrology - Groundwater The SSAR discussion includes information that includes fresh Review team clarified groundwater withdrawals totaled about 82 mgd in 1985. understanding of TVAs Please provide the rationale for including the discussion of groundwater information 1985 groundwater withdrawals and, the relevance to current Closed through audit through audit discussions and 23 groundwater withdrawals and site conditions versus a activities review of supplemental discussion of more recent estimates of groundwater totals and information provided to the usage in this SSAR section. CRN Site ESP docket.

(ML17200C887)

The staff requests the consistent use of unit nomenclature Review team clarified TVAs throughout Section 2.4 and elsewhere to avoid confusion of use of unit nomenclature observed, measured, and calculated values (e.g., Section through audit discussions and 2.4.12.1.2.1 contains text using only feet to describe review of supplemental Closed through audit 24 stratigraphic thicknesses and in other related subsections information provided to the activities uses feet and meters). CRN Site ESP docket.

(ML17158B342, ML17234A004, ML17237C084)

The SSAR states that the CRBRP wells were likely destroyed Closed through audit The staff clarified its and/or removed when the excavation and subsequent site activities understanding of this topic 25-a redress for the CRBRP was performed. Were TVA well through audit discussions and abandonment procedures or other procedures in place during document reviews.

the CRBRP site redress?

Please provide an SME to discuss the implications to Review team clarified TVAs radionuclide transport analysis considering a short-circuit CRBRP site closure activities travel pathway through improperly abandoned shallow and/or through audit discussions and deep boreholes potentially remaining from the CRBRP site Closed through audit review of supplemental 25-b characterization studies and redress. activities information provided to the CRN Site ESP docket.

(ML17234A004, ML17237C084)

Please provide an SME to discuss the status of the Closed through audit The staff clarified its Tennessee Department of Environment and Conservation activities understanding of this topic 25-c determination regarding the disposition of OW-422L in relation through audit discussions and to the petroleum product found in this well during well document reviews.

completion activities.

Table 2.4.12-4. Some geologic units specified in this table are either briefly introduced in the context of well screen Review team clarified TVAs intervals or not described (e.g., Rockdell) in the text of geologic unit descriptions Section 2.4.12, but rather refer to Reference 2.4.12-13 from a through audit discussions and footnote in the table, refer to a reference from Figure 2.4.12-9 Closed through audit review of supplemental 26 or, are described in a figure (e.g., Figure 2.4.12-10). Because activities information provided to the monitoring wells are screened over these geologic units and CRN Site ESP docket.

observations are recorded from these screened intervals and (ML17158B342, used for site characterization studies, staff requests that a ML17178A330) hydrologic description and/or references for these unit descriptions be included in the SSAR text of 2.4.12.

Reference 2.4.12-14 (aka Reference 2.4.12C-5) does not The staff clarified its seem to be publicly accessible or available to the staff. Closed through audit understanding of this topic 27 Please provide the staff with a copy of this reference or activities through audit discussions and provide a means for the staff to obtain this reference. document reviews.

The SSAR text indicates locations for two SMR reactors; Review team clarified TVAs however, the number of proposed reactors is not specified description of the SMRs elsewhere in the SSAR. Is it TVAs intention to initially place through audit discussions and Closed through audit 28-a two SMR reactors at the proposed CRN Site? information provided to the activities CRN Site ESP docket.

(ML17178A330, ML17158B342)

Please provide an SME to discuss: a) the spatial pattern of pumping test drawdowns across the monitoring well set, and if The staff clarified its that pattern is consistent with orientations of observed and Closed through audit understanding of this topic 28-b known fracture trends and higher permeability zones; and, b) activities through audit discussions and the larger vertical gradients among the well clusters groups document reviews.

and if these patterns are consistent with fracture trends and/or higher permeability zones.

The SSAR states that Of these tests, 5 exhibited flow by-The staff clarified its passing around the packers. Please provide an SME to Closed through audit understanding of this topic 29-a discuss the potential or probable causes of the by-pass activities through audit discussions and identified (e.g., formation voids, faulty packers, packer seating document reviews.

etc.).

Please provided an SME to comment on the potential or The staff clarified its probable causes of why the results from five wells (OW- Closed through audit understanding of this topic 29-b 409U, OW-415L, OW-421L, OW-423D, and OW-429U) had activities through audit discussions and one test (falling or rising head) that could not be interpreted. document reviews.

Table 2.4.12-4. Please explain the basis and rationale for The staff clarified its using a value of 155 ft (i.e., water table to bottom of primary Closed through audit understanding of this topic 29-c flow zone) to derive hydraulic conductivities for the aquifer activities through audit discussions and pumping test of PT-PW given that observation well screen document reviews.

intervals seem to be on the order of approximately 20 feet.

Please identify the references used for the Nuclear Energy Review team clarified TVAs Institute (NEI) groundwater initiatives referred to in the SSAR description of the NEI text and include these in the SSAR. initiatives through audit Closed through audit 30 discussions and information activities provided to the CRN Site ESP docket. (ML17178A330, ML17158B342)

Please provide an SME to discuss the rationale for the Review team clarified TVAs statement The head relationships observed at the Melton description of the reference Valley Exit Pathway monitoring wells (Reference 2.4.12-14) through audit discussions and suggest that there is no credible pathway involving flow Closed through audit 31 information provided to the underneath the Clinch River arm of the Watts Bar Reservoir activities CRN Site ESP docket.

and exposure to water users on the opposite side of the river.

(ML17234A004, As noted above, Reference 2.4.12-14 does not seem to be ML17237C084) publicly available.

Please provide an SME to define the word idle in the context Review team clarified TVAs of the City of Oak Ridges West End Water Treatment plants description of the waste water operational life cycle. treatment plants disposition Closed through audit 32 through audit discussions and activities information provided to the CRN Site ESP docket.

(ML17157B212)

Although discussed in the SSAR Section 2.5.4.5.3, the backfill that would be placed around the proposed power block does not seem to be represented in the conceptual model, but Review team clarified TVAs seems to be included in the soil, residuum fill category.

description of the backfill to be Please comment on the anticipated hydrologic properties of used for the proposed site the granular backfill as compared to those of the soil, Closed through audit through audit discussions and 33-a residuum fill properties and how the transport analyses might activities information provided to the be affected by inclusion of the hydrologic properties of the CRN Site ESP docket.

backfill as described in Section 2.5.4.5.3. The staff (ML17158B342, understands that A detailed field and laboratory test program ML17178A330) is conducted, during the COLA design stage, to evaluate backfill sources and their engineering properties, per Section 2.5.4.5.3.

Please provide an SME to discuss the potential presence of Staff clarified its chelating agents and the effects of chemicals (e.g., chelating Closed through audit understanding of this topic 33-b agents, if present in soils or liquids) that could comingle with activities through audit discussions and liquid radionuclides and increase the mobility of radionuclides document reviews.

in the environment.

Please make the corresponding calculation package for Review team clarified TVAs Equation 4.4.13-1 available to staff and an SME to discuss the methodology and parameters and methods used for the calculations. assumptions in radionuclide transport analysis and accidental liquid effluent Closed through audit 34 release source term through activities audit discussions and information provided to the CRN Site ESP docket.

(ML17167A150, ML17143A417)

Please provide an SME to; a) discuss the data and calculation Review team clarified TVAs package used to derive the average weekly discharges that description of the low flow were used to determine the mean value of the average weekly used through audit Closed through audit 35 discharge from the Melton Hill Dam over its lifetime as discussions and information activities approximately 4800 cfs; and, b) the probability of occurrence provided to the CRN Site ESP of 0.1 percent for a required minimum flow value of 400 cfs docket. (ML17158B342, average daily flow from Melton Hill Dam continuing for 7 days. ML17178A330)

Please provide an SME to discuss radionuclide dispersion and The staff clarified its to clarify if the dispersion was included in the calculation of Closed through audit understanding of this topic 36 radionuclide concentrations in the reservoir at the receptor activities through audit discussions and point. document reviews.

Please provide an SME to discuss dewatering plans for the excavated areas and the areal extent of the projected Review team clarified TVAs drawdown due to the dewatering and if, any potential existing description of the dewatering or future users could be impacted by the dewatering and/or Closed through audit through audit discussions and 37 drawdown and the associated rationale for associated activities information provided to the conclusions. The staff notes that construction dewatering is CRN Site ESP docket.

not discussed in SSAR Section 2.4.12 and requests that this (ML17237C084) be included in this section.

Page 2.4.12C-11, item 9. Last sentence seems to be a text Review team clarified TVAs fragment. Please clarify. description of the correction through audit discussions and Closed through audit 38 information provided to the activities CRN Site ESP docket.

(ML17158B342, ML17178A330)

Please provide an SME to discuss the groundwater model The staff clarified its setup, sensitivity runs and calibration and, the rationale for Closed through audit understanding of this topic 39 selection of the calibrated model runs for Profiles A and C. activities through audit discussions and document reviews.

Is the site layout drawing as referred to in the SSAR text Review team clarified TVAs SSAR Figure 2.4.1-4? If so, how was the groundwater model description of the proposed modified to account for the site grading plan and associated site grading through audit Closed through audit 40-a surface elevations shown in this figure? discussions and information activities provided to the CRN Site ESP docket. (ML17158B342, ML17178A330)

The SSAR indicates that The grade elevations are The staff clarified its approximate and may change when a specific technology is Closed through audit understanding of this topic 40-b selected for the Combined License Application (COLA).

activities through audit discussions and Please confirm that the finished plant grade elevation of 821 ft document reviews.

NAVD88 is either final or approximate.

The SSAR text indicates that construction fill material was assumed to representative of a clean sand while in Section 2.5.4.5.3 the backfill is described as Granular backfill consists of a processed graded aggregate meeting the gradation requirements of Type A aggregate of the Tennessee Department of Transportation (TDOT) Standard Specifications for Road and Bridge Construction (Reference 2.5.4-37)

Review team clarified TVAs Section 303, Table A2-6. Please provide a comparison of the description of the backfill representative hydraulic properties of the backfill used for the characteristics through audit groundwater model against those used for a Type A Closed through audit 40-c discussions and information aggregate per the SSAR text, and provide the rationale for the activities provided to the CRN Site ESP Section 2.4.12C.7.2 statement that A construction backfill of docket. (ML17158B342, 10-3 cm/s (2.835 ft/day) typically represents an uncompacted ML17178A330) backfill material. This and other SSAR sections should be made consistent when describing the material and hydraulic properties of proposed backfill material.

Health Physics The staff review of originating documents (i.e., Generation The staff gained an mPower, NuScale Power, Holtec, Westinghouse) containing understanding on PPE source the BWXT mPower, NuScale, SMR-160, and Westinghouse Closed through audit 41 term development through SMR source terms used in development of the CRN Site PPE activities audit discussions and review source terms (Note: f or efficiency purposes, staff suggests of supporting documents.

uploading documents to the eRR).

TVA updated supplemental Using information from above, staff requests a discussion with information related to PPE the cognizant SME (TVAs contractor) concerning the source terms through audit development of the CRN Site PPE source terms, and the NRC Closed through audit 42 discussions and information staffs confirmatory analyses (Note: for efficiency purposes, activities provided to the CRN Site ESP staff suggests a face-to-face discussion with SME either at docket. (ML17167A150, CRN Site or at SMEs office in Reston, VA).

ML17178A330)

The staff requests a discussion with the cognizant SME TVA revised radionuclide (TVAs contractor) concerning the calculations of normal liquid activities and evaluated doses and gaseous effluent releases and doses, and the NRC staffs Closed through audit through audit discussions and 43 confirmatory analyses (Note: for efficiency purposes, staff activities information provided to the suggests a face-to-face discussion with SME either at CRN CRN Site ESP docket.

Site or at SMEs office in Reston, VA). (ML17167A150)

Review team clarified TVAs methodology and assumptions in radionuclide transport analysis and The staff requests a discussion with the cognizant SME accidental liquid effluent (TVAs contractor) concerning the calculation of accidental Closed through audit 44 release source term through liquid effluent releases to ground and surface water and dose, activities audit discussions and and the NRC staffs confirmatory analysis.

information provided to the CRN Site ESP docket.

(ML17167A150, ML17143A417)

Clinch River Environmental Mailing List (Revised 03/25/2017) cc:

Mr. Lionel Batty Mr. E. Patrick McIntyre, Jr.

Nuclear Business Team Executive Director and Graftech State Historic Preservation Officer 12300 Snow Road Tennessee Historical Commission Parma, OH 44130 State Historic Preservation Office 2941 Lebanon Pike Ms. V. Anne Heard, Acting Regional Nashville, TN 37214 Administrator US EPA Region 4 Mr. Dobie McArthur, Director 61 Forsyth Street SW Washington Operations Atlanta, GA 30303-8960 General Atomics 1899 Pennsylvania Avenue, NW Mr. Daniel P. Stout Suite 300 Nuclear Business Team Washington, DC 20006 Senior Manager SMR Technology Mr. Reid Nelson, Director Tennessee Valley Authority Office of Federal Agency Programs 1201 P Street, NW, Suite 1100 Advisory Council on Historic Preservation Washington, DC 20004-1218 401 F Street NW, Suite 308 Washington DC 20001-2637 Mr. Russell Bell Nuclear Energy Institute Mr. Bill Pearson, Field Supervisor 1776 I Street, NW U.S. Fish and Wildlife Service Suite 400 Alabama Ecological Services Field Office Washington, DC 20006-3708 1208-B Main Street Daphne, AL 36526 Ms. Taconya Goar Environmental Affairs Supervisor Mr. David Repka Alabama Department of Conservation and Winston & Strawn LLP Natural Resources 1700 K. Street, NW 64 North Union Street, Suite 551 Washington, DC 20006-3817 Montgomery, AL 36130 Mr. Carlos Sisco, Senior Paralegal Mr. Brendan Hoffman Winston & Strawn LLP Research Associate on Nuclear Energy 1700 K Street NW Public Citizens Critical Mass Energy Washington, DC 20006 and Environmental Program 215 Pennsylvania Avenue, SE Mr. Robert E. Sweeney Washington, DC 20003 IBEX ESI 4641 Montgomery Avenue, Suite 350 Ms. Mary Jennings Bethesda, MD 20814 Field Supervisor U.S. Fish and Wildlife Service Ms. Tammy Turley Tennessee Ecological Services Field Office U.S. Army Corps of Engineers 466 Neal Street Nashville District Cookeville, TN 38506 3701 Bell Road Nashville, TN 37214 Page 1 of 5

Clinch River Environmental Mailing List (Revised 03/25/2017) cc:

Ms. Emily Steele City of Oak Ridge Kingston Public Library P.O. Box 1 1004 Bradford Way Oak Ridge, TN 37831 Kingston, TN 37763 Ms. Kathy McNeilly, Director Ms. Amy S. Fitzgerald, Ph.D. Oak Ridge Public Library Government Affairs 1401 Oak Ridge Turnpike and Information Services Director Oak Ridge, TN 37830 Page 2 of 5

Clinch River Environmental Mailing List (Revised 03/25/2017) cc:

Email:

Alan.Levin@areva.com (Alan Levin) alawson@knoxvilletn.gov (Alan Lawson) asi@ornl.gov (Anita Benn) awc@nei.org (Anne W. Cottingham) badwan@lanl.gov (Faris Badwan) bevans@enercon.com (Bob Evans) cee@nei.org charles.bagnal@ge.com (Charles Bagnal) chm3@aol.com (Clyde Morton) collinlj@westinghouse.com (Leslie Collins) cposlusny@babcock.com (Chester Poslusny) curtisslaw@gmail.com (Jim Curtiss) d.weaver@holtec.com (Doug Weaver) david.hinds@ge.com (David Hinds) david.lewis@pillsburylaw.com (David Lewis) debra.shults@tn.gov (Debra Shults) dhsmith@loudoncounty-tn.gov (Daryl Smith) dlfulton@southernco.com (Dale Fulton) don.tormey@iub.iowa.gov (Don Tormey) dpstout@tva.gov (Daniel Stout) dsafer@comcast.net (Don Safer) duane.fournier@iub.iowa.gov ed.burns@earthlink.net (Ed Burns) edwardsd@mcsed.net (D. Edwards) ethompson@astribe.com (Erin Thompson) elyman@ucsusa.org (Ed Lyman) emermgmt@highland.net (Jody Zorsch) erg-xl@cox.net (Eddie R. Grant) eroeste1@bechtel.com (Eric Oesterle) ewallace@nuscalepower.com (Ed Wallace) exa@nei.org (Ellen Anderson)

F.Shahrokhi@AREVA.Com (Farshid Shahrokhi) flowerspa@ornl.gov (Paula Flowers) frank.bodine@oca.iowa.gov (Frank Bodine) gmokulczyk@energysolutions.com (Gair Okulczyk) gmorg50@hotmail.com (Garry Morgan) hickste@earthlink.net (Thomas Hicks) jahalfinger@babcock.com (Jeff Halfinger) james1.beard@ge.com (James Beard) jason.parker@pillsburylaw.com (Jason Parker) jcsaldar@bechtel.com (James Saldarini) jerald.head@ge.com (Jerald Head)

Jim.Kinsey@inl.gov (James Kinsey) jim.sundermeyer@iub.iowa.gov (Jim Sundermeyer) jnperry@tva.gov (Jeff Perry)

JNR@NuScalePower.com (Jose N. Reyes) jrappe@nuscalepower.com (Jodi Rappe) kerri.johannsen@iub.iowa.gov (Kerri Johannsen) klingcl@westinghouse.com (Charles Kling)

Page 3 of 5

Clinch River Environmental Mailing List (Revised 03/25/2017) cc:

kouhestani@msn.com (Amir Kouhestani) krrowe@tva.gov (Kevin R. Rowe)

KSutton@morganlewis.com (Kathryn M. Sutton)

Kwelter@NuScalePower.com (Kent Welter) larry.shi@oca.iowa.gov (Larry Shi) larry.stevens@iub.iowa.gov (Larry Stevens) laura.andrews@CNSC-CCSN.GC.CA (Laura Andrews) lchandler@morganlewis.com (Lawrence J. Chandler) lgorenflo@gmail.com (L. Gorenflo) libby.jacobs@iub.iowa.gov (Libby Jacobs) luther.jones@dzatlantic.com (Luther B. Jones) mack.thompson@iub.iowa.gov (Mack Thomson) maria.webb@pillsburylaw.com (Maria Webb) mark.a.giles@dom.com (Mark Giles) mark.m.mcintosh@usace.army.mil mark.holbrook@inl.gov (Mark Holbrook) mark@npva.net martha.shields@nuclear.energy.gov (Martha Shields) mary_e_jennings@fws.gov (Mary Jenningings) murawski@newsobserver.com (John Murawski) nanako@wcore.com (Nanako Hisamichi) paynkey@hotmail.com (Steve Payne) parveen.baig@iub.iowa.gov (Parveen Baig) patriciaL.campbell@ge.com (Patricia L. Campbell)

Paul@beyondnuclear.org (Paul Gunter)

PLorenzini@NuScalePower.com (Paul Lorenzini) poorewpiiI@ornl.gov (Willis P. Poore III) pshastings@tva.gov (Peter Hastings) rbarrett@astminc.com (Richard Barrett) rnicholas@ge.com (Robert Nicholas) ronald.polle@oca.iowa.gov (Ronald Polle)

RSnuggerud@NuScalePower.com (Ross Snuggerud)

Sandra@sandrakgoss.com (Sandra Goss) sara@cleanenergy.org (Sara Barczak) scott.stout@roanecountytn.org (Scott Stout) sfrantz@morganlewis.com (Stephen P. Frantz) section106@mcn-nsn.gov (Corain Lowe-Zepeda) shobbs@enercon.com (Sam Hobbs)

SiteDCC-mpower@babcock.com (Document Control) smirsky@nuscalepower.com (Steve Mirsky) smsloan@babcock.com (Sandra Sloan) spellmandj@ornl.gov (Donald J. Spellman) stan.wolf@iub.iowa.gov (Stan Wolf) stephan.moen@ge.com (Stephan Moen) t.sensue@holtec.com (Terry Sensue) tdec.nepa@tn.gov (Jennifer Hauser) tfeigenbaum@generationmpower.com (Ted Feigenbaum) tgado@roe.com (Burns & Roe) tholden@tnema.org (Tim Holden) thpo@tttown.org (Emma Spain) timothy.beville@nuclear.energy.gov (Timothy Beville)

Page 4 of 5

Clinch River Environmental Mailing List (Revised 03/25/2017) cc:

tom.miller@nuclear.energy.gov (Thomas P. Miller)

TomClements329@cs.com (Tom Clements) tommy_le2001@yahoo.com (Tommy Le) trsmith@winston.com (Tyson Smith)

Vanessa.quinn@dhs.gov (Vanessa Quinn)

W.E.SMIT@southernco.com (William Smith) whorin@winston.com (W. Horin)

Page 5 of 5