ND-19-0021, Eleventh Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049)

From kanterella
(Redirected from ML19056A206)
Jump to navigation Jump to search
Eleventh Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049)
ML19056A206
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 02/25/2019
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of New Reactors
References
EA-12-049, ND-19-0021
Download: ML19056A206 (8)


Text

Michael J. Yox Southern Nuclear Regulatory Affairs Director 7825 River Road Waynesboro, GA 30830 Vogtle 3&4 706 848 6459 tel FEB 2 5 2019 myox@southernco.com Docket Nos.: 52-025 ND-19-0021 52-026 U. S. Nuclear Regulatory Commission ATTN; Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant - Units 3 and 4 Eleventh Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitiaation Strategies for Bevond-Desion-Basis External Events (EA-12-0491 References;

1. NRC Order Number EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, dated March 12, 2012.
2. NRC Interim Staff Guidance JLD-ISG-2012-01, Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies forBeyond-Design-Basis External Events, Revision 0, dated August 29, 2012.
3. NEI 12-06, Diverse and Flexible Coping Strategies(FLEX)Implementation Guide, Revision 0, dated August 2012.
4. SNC Letter ND-13-1702, Vogtle Electric Generating Plant Units 3 and 4 Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events(Order Number EA-12-049), dated August 22, 2013.

Ladies and Gentlemen:

On March 12, 2012, the Nuclear Regulatory Commission (NRC)issued an order (Reference 1) to Southern Nuclear Operating Company. Reference 1 was immediately effective and directed the Vogtle Electric Generating Plant - Units 3 and 4(VEGP 3&4)to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities in the event of a beyond-design-basis external event. Specific requirements are outlined in Attachment 3 of Reference 1.

Reference 1 required submission of an Overall Integrated Plan within one year after issuance of the final NRC Interim Staff Guidance (Reference 2). Reference 2 endorses industry guidance document NEI 12-06, Revision 0(Reference 3) with clarifications and exceptions identified in Reference 2. Reference 4 provided the VEGP 3&4 Overall Integrated Plan.

U. S. Nuclear Regulatory Commission ND-19-0021 Page 2 Reference 1 requires submission of a status report at six-month intervals following submittal of the Overall Integrated Plan. Reference 3 provides direction regarding the content of the status reports and was followed in developing the enclosed report. The purpose of this letter is to provide the eleventh six-month status report pursuant to Section IV, Condition C.2, of Reference 1, that delineates progress made in implementing the requirements of Reference 1.

The enclosed status report provides an update of milestone accomplishments since the last six-month update, including any changes to the compliance method, schedule, or need for relief and the basis, if any.

This letter contains no new regulatory commitments. This letter has been reviewed and determined not to contain security-related information.

If you have any questions, please contact Mr. Dave Midlik at 706-848-6737.

I declare under penalty of perjury that the foregoing is true and correct. Executed on the day of faot-uQrui 2019.

Respectfully submitted.

Michael J. Yo>

Vogtle 3&4 Regul^ory Affairs Director Southern Nuclear'bperating Company MJY/DWM/sfr

Enclosure:

Eleventh Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049)

U. S. Nuclear Regulatory Commission ND-19-0021 Page 3 go:

Southern Nuclear Ooeratina Comoanv / Georoia Power Company Mr. 8. E. Kuczynski (w/o enclosures)

Mr. D. G. Bost(w/o enclosures)

Mr. M. D. Meier(w/o enclosures)

Mr. D. H. Jones(w/o enclosures)

Mr. J. 8. Klecha Mr. G. Chick Mr. D. L. McKinney (w/o enclosures)

Mr. T. W. Yelverton (w/o enclosures)

Mr. B. H. Whitley Ms. C. A. Gayheart Mr. C. R. Pierce Ms. A. G. Aughtman Mr. D. L. Fulton Mr. M. J. Vox Mr. C. T. Defnall Mr. J. Tupik Mr. W. A. Sparkman Ms. A. C. Chamberlain Mr. 8. Leighty Mr. E. Riffle Ms. K. Roberts Mr. J. Haswell Mr. J. Andrews Document Services RTYPE: VND.LI.LOO File AR.01.02.06 Nuclear Reoulatorv Commission Mr. W. Jones (w/o enclosures)

Ms. J. Dixon-Herrity Mr. C. Patel Ms. J. M. Heisserer Mr. B. Kemker Mr. G. Khouri Ms. 8. Temple Mr. F. Brown Mr. C. J. Even Mr. A. Lerch Mr. 8. Walker State of Georoia Mr. R. Dunn Oalethoroe Power Corporation Mr. M. W. Price Ms. A. Whaley

U. S. Nuclear Regulatory Commission ND-19-0021 Page 4 Municipal Electric Authority of Georoia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utilities Mr. T. Bundros Westinohouse Electric Company. LLC Mr. L. Oriani(w/o enclosures)

T. Rubenstein (w/o enclosures)

Mr. M. Corletti Mr. M. L. Clyde Mr. D. Hawkins Mr. J. Coward Other Mr. S. W. Kline, Bechtel Power Corporation Ms. L. A. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.

Mr. S. Roetger, Georgia Public Service Commission Ms. 8. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham NDDocumentinBox@duke-energy.com, Duke Energy Mr. S. Franzone, Florida Power & Light

Southern Nuclear Operating Company ND-19-0021 Enclosure Vogtle Electric Generating Plant Units 3 and 4 Eleventh Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Bevond-Desion-Basis External Events(EA-12-0491 (This enclosure consists of 4 pages including this tover page)

ND-19-0021 Enclosure Eleventh Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Deslgn-Basis External Events(EA-12-049) 1 Introduction Vogtie Electric Generating Plant - Units 3 and 4 developed an Overall Integrated Plan (Reference 1 in Section 8), documenting the diverse and flexible strategies(FLEX), in response to Nuclear Regulatory Commission Order EA-12-049(Reference 2). This status report provides an update of milestone accomplishments since the last six-month update, including any changes to the compliance method, schedule, or need for relief/relaxation and the basis, if any.

2 Milestone Accompiishments In addition to the submittal of status reports, the following milestone(s) directly related to FLEX implementation have been completed since the last six-month update (Reference 3), and are current as of Jan 31, 2019:

  • None 3 Milestone Schedule Status The following table provides an update to the milestone schedule. The table provides the activity status of each item and indicates whether the expected completion date has changed. The dates are planning dates subject to change as design and implementation details are developed.

During this reporting period, a modification was made to the line item which identifies the operational date for the National SAFER Response Center(NSRC). The NSRC will become operational, for Vogtie Units 3 and 4, at the time the individual unit is in full compliance. The Milestone Table was updated to reflect this change Page 2 of 4

ND-19-0021 Enclosure Eleventh Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events(EA-12-049)

Revised Milestone Target Activity Target Completion Status Compietion Date Date Subm 160 Day Status Report Oct 2012 Complete N/A Subm t Overall Integrated Plan (OIP) Aug 2013 Complete N/A Subm 16 Month Status Report Feb 2014 Complete N/A Subm 6 Month Status Report Aug 2014 Complete N/A Subm 6 Month Status Report Feb 2015 Complete N/A Subm 6 Month Status Report Aug 2015 Complete N/A Subm 6 Month Status Report Feb 2016 Complete N/A Subm 6 Month Status Report Aug 2016 Complete N/A Subm 6 Month Status Report Feb 2017 Complete N/A Subm 6 Month Status Report Aug 2017 Complete N/A Subm 6 Month Status Report Feb 2018 Complete N/A Subm 6 Month Status Report Aug 2018 Complete N/A Subm til'" 6-Month Status Report Feb 2019 Complete N/A Subm 12'" 6-Month Status Report' Aug 2019 Not Started N/A Develop FLEX training Aug 2019 In Progress N/A Staffing Analysis Completed Oct 2019 In Progress N/A N/A Ensure Operational Procedures include necessary information Nov2019 In Progress Develop Response Plan with NSRC (storage plan and procedural guidance NOV2019 In Progress N/A for strategy/maintenance)

Initiate Phase 3 Equipment Procurement Dec 2019 Not Started N/A Submit 13**^ 6-Month Status Report Feb 2020 Not Started N/A NSRC Operational for Unit 3 Aug 2020 Not Started Apr 2020 Demonstration for Unit 3 Apr 20202 Not Started N/A Submit Order EA-12-049 Compliance Jun 2020 Not Started N/A Report for Unit 3 Training Complete for Phase 3 to include connection and use of redundant offsite Feb 2020 Not Started N/A equipment for Anciilary Equipment.

Submit M"'6-Month Status Report Aug 2020 Not Started N/A Submit IS"'6-Month Status Report Feb 2021 Not Started N/A NSRC Operational for Unit 4 Aug 2020 Not Started Apr 2021 Demonstration for Unit 4 Apr 20213 Not Started N/A Submit Order EA-12-049 compliance Report for Unit 4 and Final Integrated Jun 2021 Not Started N/A Plan (FIP)

^Updated plant-specific OIP anticipated to be submitted with Aug 2019 6-month update.

^Unit 3 - Full compliance prior to Fuei Load for Unit 3 Unit 4 - Full compliance prior to Fuel Load for Unit 4 Page 3 of 4

ND-19-0021 Enclosure Eleventh Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events(EA-12-049) 4 Changes to Compliance Method There are no changes to the compliance method as documented in Reference 1.

5 Need for Relief/Relaxation and Basis for the Relief/Reiaxation Vogtie Electric Generating Plant - Units 3 and 4 expects to comply with the order implementation date and no relief/relaxation is required at this time.

6 Open items from Overaii integrated Pian and Draft Safety Evaiuation The following tables provide a summary of the open items documented in the Overall Integrated Plan or the Draft Safety Evaluation (SE)and the status of each item.

Overaii Integrated Plan Open Item Status N/A N/A Draft Safety Evaluation Open item Status Draft Safety Evaluation not received N/A 7 Potential Draft Safety Evaiuation impacts A Draft Safety Evaiuation has not been received.

8 References The following references support the updates to the Overall Integrated Plan described in this enclosure.

1. SMC Letter ND-13-1702, Vogtie Electric Generating Plant Units 3 and 4 Overall Integrated Plan In Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis Extemal Events(Order Number EA-12-049), dated August 22, 2013.
2. NRG Order Number EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis Extemal Events, dated March 12, 2012.
3. SNC letter ND-18-0986, Vogtie Electric Generating Plant- Units 3and 4 Tenth Six-Month Status Report ofthe Implementation ofthe Requirements ofthe Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events(EA-12-049),

dated August 29, 2018.

Page 4 of 4