ML19016A124

From kanterella
Jump to navigation Jump to search
Request for Scoping Comments Concerning the Environmental Review of Surry Power Station, Unit Nos. 1 and 2 Subsequent License Renewal Application (Achp_Sps_Section 106)
ML19016A124
Person / Time
Site: Surry  Dominion icon.png
Issue date: 01/24/2019
From: Benjamin Beasley
NRC/NRR/DMLR/MENB
To: Nelson R
US Advisory Council on Historic Preservation, Office of Federal Agency Programs
Jeffrey Rikhoff, NRR/DMLR/MENB, 415-1090
References
Download: ML19016A124 (6)


Text

January 24, 2019 Mr. Reid Nelson, Director Office of Federal Agency Programs Advisory Council on Historic Preservation 401 F Street NW, Suite 308 Washington, DC 20001-2637

SUBJECT:

REQUEST FOR SCOPING COMMENTS CONCERNING THE ENVIRONMENTAL REVIEW OF SURRY POWER STATION, UNIT NOS. 1 AND 2 SUBSEQUENT LICENSE RENEWAL APPLICATION

Dear Mr. Nelson:

The U.S. Nuclear Regulatory Commission (NRC) is conducting a review of the environmental effects of renewing the operating licenses for Surry Power Station, Unit Nos. 1 and 2 (SPS).

SPS is operated by Dominion Energy Virginia and is located in Surry, Virginia (see Enclosure 1). Dominion Energy Virginia submitted an application for the subsequent renewal of SPS operating licenses in a letter dated October 15, 2018, pursuant to Title 10 of the Code of Federal Regulations Part 54 (10 CFR Part 54).

The NRC has defined subsequent license renewal to be the period of extended operation from 60 years to 80 years. The Atomic Energy Act (AEA) of 1954, as amended, authorizes the NRC to issue 40-year initial licenses, and upon application and approval, renew licenses for nuclear power reactors. The NRCs regulations limit these renewals to 20-year increments. Approval of a renewed license is based on the outcome of a safety and environmental review. The NRC issued renewed SPS, Unit Nos. 1 and 2 operating licenses in 2003; the current Unit 1 operating license expires on May 25, 2032, and the Unit 2 operating license expires on January 29, 2033.

The requested renewals would extend the operating license expiration dates for SPS, Unit Nos.

1 and 2, to May 25, 2052 and January 29, 2053, respectively.

As part of the NRCs license renewal review, a site-specific supplement to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants, NUREG-1437, is prepared in accordance with 10 CFR Part 51, the NRCs environmental protection regulations.

These regulations also implement Section 102(2) of the National Environment Policy Act of 1969, as amended (NEPA). In accordance with 36 CFR 800.8(c), the NRC intends to comply with Section 106 of the National Historic Preservation Act of 1966, as amended (NHPA),

through the NEPA process. In the context of NHPA, the NRC has determined that the area of potential effects (APE) for this subsequent license renewal is the area at the power plant site and its immediate environs that may be impacted by ongoing routine maintenance and operational activities during the license renewal term (see Enclosure 2). The APE may extend beyond the immediate SPS environs if Dominion Energy Virginia maintenance and operational activities affect offsite historic properties (see Enclosure 3). This determination is made irrespective of ownership or control of the lands of interest.

R. Nelson Please provide any comments that you may have on the scope of the environmental review within 30 days of the date of this letter. Written comments should be submitted by mail to:

May Ma, Director Program Management, Announcements and Editing Branch Office of Administration Mail Stop: TWFN-7A60M U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Electronic comments may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2018-0280.

The application is available through the web-based version of the NRCs Agencywide Documents Access and Management System (ADAMS. ADAMS is accessible at https://www.nrc.gov/reading-rm/adams.html. The environmental report portion of the application is listed under ADAMS Accession No. ML18291A834. The NRC expects to publish a draft Supplemental Environmental Impact Statement in September 2019. The NRC will forward the draft supplement to you for your review and comment. This draft supplement will include identification of historic properties, assessment of impacts, and a preliminary determination.

After consideration of public comments received, the NRC plans to issue the final supplement, in April 2020.

If you have any questions concerning the NRCs license renewal review, please contact Jeffrey Rikhoff, at 301-415-1090 or by e-mail at Jeffrey.Rikhoff@nrc.gov.

Sincerely,

/RA/

Benjamin Beasley, Chief Environmental Review and NEPA Branch Division of Materials and License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-280 and 50-281

Enclosures:

1. Area Map, 50-mile radius
2. SPS Site Boundary
3. Area Map, 6-mile radius cc: Listserv

ML19016A124 *concurred via email OFFICE LA:DMLR: MRPB ES:DMLR:MENB PM:DMLR:MRP BC:DMLR:MENB B

NAME SLent JRikhoff TTran BBeasley DATE 1/17/2019 1/17/2019 1/17/2019 1/24/2019

Area Map, 50-mile radius Source: SPS Environmental Report Enclosure 1

SPS Site Area Map Source: SPS Environmental Report Enclosure 2

Area Map, 6-mile radius Source: SPS Environmental Report Enclosure 3