ML19008A134

From kanterella
Jump to navigation Jump to search
Generic BWR SPAR Model White Paper
ML19008A134
Person / Time
Issue date: 01/09/2019
From: Suzanne Dennis
NRC/RES/DRA/PRAB
To:
Shared Package
ML19008A130 List:
References
Download: ML19008A134 (3)


Text

Generic BWR PRA Model Eryk Turski, Pastwowa Agencja Atomistyki Selim Sancaktar, United States Nuclear Regulatory Commission Suzanne Dennis, United States Nuclear Regulatory Commission The U.S. Nuclear Regulatory Commission, in conjunction with the Polish nuclear regulatory agency, has developed a probabilistic risk assessment (PRA) model for a General Electric (GE) boiling water reactor four (BWR 4). This model does not represent any specific plant, but rather is intended to be representative of a typical BWR. This report provides a discussion of the model, as of September 1, 2018. The model was developed using the Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) code.

This model is in-progress and is intended to be a training and development opportunity for domestic and international stakeholders. As other initiators, fault trees, and system failures are added, the model will be updated1.

This report discusses the current scope of the model, internal initiating events categories, common-cause failure, and human failure events. More information on these events, as well as additional documentation of the details of the model, can be found in the model documentation.

Plant Definition and Scope Name Plant-Y Type GE BWR 4

  1. of Units 1 unit on the site Containment Type Mark II The modeled plant design is based on the GEs Boiling Water Reactor technology BWR 4.

The design used in the model is described in General Electric Systems Technology Manual

(

Reference:

GEBWR-2011). The modeled plant is a one-unit plant. The design is the BWR with forced circulation of coolant, equipped with the Mark II containment.

Initiating Events This section discusses the three initiating event categories used in the internal events model.

IE-LLOCA Initiating event large loss of coolant accident (LOCA). The large LOCA initiating event is defined as a steam or liquid break that will rapidly depressurize the reactor vessel. High-pressure injection systems will not have adequate flow rates or steam pressure to restore level and maintain core cooling.

IE-LOOP (Total) Loss of Offsite Power initiating event is a special case of a transient in which AC power from offsite power is lost to the plant emergency buses. In special cases where AC power is available to some non-safety buses, no credit is taken for 1

This model currently has a very limited set of internal events categories and does not have any other hazard categories represented in the model. The scope of the model is substantially less detailed than the NRCs standardized plant assesstment risk (SPAR) models.

1

those non-safety buses. The LOOP event will cause a reactor trip. Given a LOOP event, onsite emergency diesel generators are required to start and supply emergency power to the division buses for the safety equipment. If the emergency diesel generators fail, then a station blackout (SBO) event will occur. The SBO is modeled in a separate event tree. Failure of reactor protection system to shutdown the reactor will cause this sequence to transfer to the anticipated transient without scram (ATWS) event tree for further evaluation.

IE-TRANS This initiating event category includes common transients, such as a turbine trip and spurious reactor trip, where the secondary heat removal through the condenser and main feedwater system is available at the time of the reactor trip.

Failure of reactor protection system to shutdown the reactor will cause this sequence to transfer to the ATWS event tree for further evaluation.

Common Cause Modeling Generally, common cause failures are modeled for active components, except for plugging of heat exchangers. Common cause failure is only modeled for like components within a system, and not across system boundaries. Common cause modeling is considered for the following types of components:

  • motor-operated valves,
  • air-operated valves,
  • explosive valves,
  • pumps, heat exchangers and
  • diesel generators.

Common cause failure probability is calculated using the Alpha Factor Method.

Human Failure Events The human actions included in the model consist of both pre-accident failures to restore systems following test or maintenance, and post-accident failures to align systems, to control or operate systems, and to recover system hardware failures. In the current version of the model a detailed human reliability analysis (HRA) has not been developed. Human error probabilities (HEPs) used in the current version of the model are not justified by any HRA method. All HEPs have a generic value of 10E-3 assigned. In some cases, lower or higher values have been used to address predicted significant differences in the time available to perform action.

Quantification of Total Plant CDF from All Hazard Categories The total plant CDF from all scenarios is calculated by selecting all scenarios in the SAPHIRE The overall Core Damage Frequency (CDF) for PLANT-Y model limited to three ETs, representing accident models for three IEs (LLOCA, LOOP-WR, TRANS) is following:

CDF (Point Estimate):

  • Non-minimal cutsets quantification: 1.87E-05 2
  • Minimal cutsets quantification: 1.81E-05 As noted previously, this version of the model does not contain what would be considered as a complete set of initiating events for any of the hazard categories modeled; however, as the model is updated and refined, these limitations could be resolved.

References IAEA-1993 Defining Initiating Events for Purposes of Probabilistic Safety Assesments-IAEA Publications www-pub.iaea.org/MTCD/publications/PDF/te_719_web.pdf GEBWR-2011 GE BWR 4 Technology Manual https://www.nrc.gov/docs/ML1125/ML11258A231.html NRC-1981 NUREG-0492. Fault Tree Handbook https://www.nrc.gov/docs/ML1007/ML100780465.pdf NRC-1983 Handbook of Human Reliability Analysis with Emphasis on Nuclear Power Plant Applications (THERP), NUREG/CR-1278, August.

NRC-1995 "Reliability Study: General Electric Reactor Protection System, 1984-1995" http://nrcoe.inl.gov/resultsdb/SysStudy/GE.aspx NRC-2005 SPAR-H Human Reliability Analysis Method, NUREG/CR-6883, August 2005.

NRC-2007 NUREG/CR-6928. INL/EXT-06-11119. Industry-Average Performance for Components and Initiating. Events at U.S. Commercial. Nuclear Power Plants.

https://www.nrc.gov/docs/ML0706/ML070650650.pdf NRC-2008 NUREG-1829 Vol. 1 Estimating Loss-of-Coolant Accident (LOCA) Frequencies through the Elicitation Process Main Report.

https://www.nrc.gov/docs/ML0822/ML082250436.pdf NRC-2015-01 INL/EXT-14-31428. Initiating Event Rates at U.S. Nuclear Power Plants 1988-2013. https://nrcoe.inel.gov/resultsdb/publicdocs/InitEvent/initiating-event-frequencies-and-trends-2013.pdf NRC-2015-02 CCF Parameter Estimations 2015.

https://nrcoe.inel.gov/resultsdb/publicdocs/CCF/ccfparamest2015.pdf NRC-2015-03 Parameter Estimates Spreadsheet 2015.

http://nrcoe.inl.gov/resultsdb/publicdocs/AvgPerf/ParameterEstimates2015.xlsx NRC-2016-01 SPAR Initiating Event Data and Results 2015 Parameter Estimation Update 2016.

http://nrcoe.inel.gov/resultsdb/publicdocs/AvgPerf/InitiatingEvents2015.pdf NRC-2016-02 Analysis of Loss-of-Offsite-Power Events 1987-2015 INL/EXT-16-39575, 2016.

3