ML18332A035

From kanterella
Jump to navigation Jump to search
Copy of 2018 07 16 NRC Site Data Inventory
ML18332A035
Person / Time
Issue date: 11/28/2018
From: Richard Chang
Division of Decommissioning, Uranium Recovery and Waste Programs
To:
Chang R
Shared Package
ML18332A034 List:
References
Download: ML18332A035 (1)


Text

PLANNED WORK AT DOD CLEANUP SITES WITH CONFIRMED RELEASE OF RADIOLOGICAL MATERIALS Installation Name City State Site Name NPL RAD Contaminant(s) Phase of Work Brief Description of Planned Work ALAMEDA NAS Alameda CA Site 5 Y Ra-226, Cs-137 Investigation Fieldwork coming to a close; scanning and remediation of RAD-impacted areas in Building 5/5A to support URR; RACR/FSS to be prepared ALAMEDA NAS Alameda CA Site 32 Y Ra-226, Sr-90 Investigation/Cleanup Install soil cover; conduct RAD surface scans; plant native vegetation and manage the cover for erosion/weeds.

Elevated levels of radionuclides found in outfall sediment. Sediment removed and area capped. Landfill capping to be completed in summer 2018. Monitoring will continue for a BRUNSWICK NAS Brunswick ME Sites 1/3 Landfill Y Ra-226, U-238 Cleanup & Capping few seasons to document that cleanup and capping were effective.

Radioluminescent circuit breaker and other small devices discovered during soil removal action. Additional cleanup planned once NOSSA approves remediation of comingled BRUNSWICK NAS Brunswick ME Site 7 Y Ra-226 Cleanup munitions. Planning to accomplish transects in 2019 to complete munitions and RAD assessment.

HUNTERS POINT NSY San Francisco CA Site 1 Y Ra-226, Sr-90 Cleanup, T&D Hot spot delineation, soil excavation to 1 foot bgs, grading, & capping (Parcel E-2)

HUNTERS POINT NSY San Francisco CA Site 7 Y Cs-137, Ra-226, Sr-90 Investigation Investigation of past cleanup work HUNTERS POINT NSY San Francisco CA Site 28 Y Cs-137, Ra-226, Sr-90, Th-232 Investigation/Cleanup Soil excavation (Parcel C SS/SD), building scans/remediation (Parcel C); investigation of past cleanup work HUNTERS POINT NSY San Francisco CA Site 36 Y Cs-137, Ra-226, Sr-90 daughters Investigation Investigation of past cleanup work HUNTERS POINT NSY San Francisco CA Site 39 Y Cs-137, Pu-239, Ra-226 Investigation/Cleanup Soil excavation (Parcel E SS/SD), soil excavation to 1 foot bgs and capping (Parcel E at IR 02/03), building scans/remediation (Parcel E); investigation of past cleanup work LONG BEACH NS Long Beach CA Site 1 N Ra-226, Sr-90 Investigation Data gaps investigation LONG BEACH NS Long Beach CA Site 2 N Ra-226, Sr-90 Investigation Data gaps investigation MARE ISLAND NSY Vallejo CA UXO 3, Dredge Pond 3E, Northern MC Firing Range N Ra-226, Sr-90 Investigation Geophysical survey, RAD survey, soil and GW sampling imminent MARE ISLAND NSY Vallejo CA UXO 7 N Ra-226, Sr-90 Investigation Investigation MARE ISLAND NSY Vallejo CA UXO 13/Paint Waste Area N Ra-226, Sr-90 Investigation Finalize Remedial Investigation and Final Status Survey Report; conduct data gaps investigation at Paint Waste Area TREASURE ISLAND NS San Francisco CA Site 12 N Ra-226 Investigation/Cleanup RAD FS under development. Tech Memo drafted regaring path to free release of open spaces. RAD PP and ROD scheduled for late 2018 to early 2019.

Legend New Site Added (since July 2017)

Page 1 of 1 Data as of 3/13/2019