Letter Sequence RAI |
---|
|
Results
Other: ML18312A305, ML18312A306, ML18312A307, ML18312A309, ML18312A310, ML18312A311, ML19046A033, ML19221B601, ML19221B602, ML19269B707, ML19308C717, ML20084K708, ML20084K713, ML20084K716, ML24040A160
|
MONTHYEARML18312A3101984-12-31031 December 1984 Computation of Delayed Fission Product Gamma Ray Dose Rates from Ncsu Pulstar Reactor Using a Monte Carlo Number Albedo Approach - B. E. Hey Project stage: Other ML18312A3111985-05-0606 May 1985 Monte Carolo Simulation of the Gamma Dose Rate in a Loss-of-Water Accident at the North Carolina State University Research Reactor Project stage: Other ML18312A3091998-11-23023 November 1998 North Carolina State University - Calculation No. NRP-98-01: Criticality Analysis for a 250 Fresh Pin Storage Rack Project stage: Other ML18128A0472018-05-21021 May 2018 North Carolina State University Pulstar Research Reactor - Letter Request for Additional Information Regarding the Renewal of Facility Operating License No. R-120, Docket No. 50-297 Project stage: RAI ML18201A2002018-07-17017 July 2018 North Carolina State Univ., Response to Request for Additional Information Regarding Physical Security Plan Review for Renewal of Facility Operating Project stage: Response to RAI ML18268A3582018-10-18018 October 2018 North Carolina State University - Request for Additional Information License Renewal Application for Facility Operating License R-120 for the North Carolina State University Pulstar Research Reactor Project stage: RAI ML18312A3072018-11-0101 November 2018 North Carolina State University - Burlington Hall Research Reactor Piping Upgrade Final Engineering Report Project stage: Other ML18312A3062018-11-0101 November 2018 North Carolina State University - Reactor Operator Training and Requalification Program Project stage: Other ML18312A3052018-11-0101 November 2018 North Carolina State University - Financial Qualifications Report Project stage: Other ML18312A3042018-11-0101 November 2018 North Carolina State University - Response to Request for Additional Information Project stage: Response to RAI ML18312A3032018-11-0101 November 2018 Response Submittal 1 to the Request for Additional Information for License Renewal Application for Facility Operating License R-120 for the North Carolina State University Pulstar Research Reactor Project stage: Request ML18348A0132018-12-13013 December 2018 Request for Time Extension for the Request for Additional Information for License Renewal Application for Facility Operating License R-120 for the North Carolina State University Pulstar Research Reactor Project stage: Request ML19046A0332019-02-14014 February 2019 North Carolina State Univ., Safety Analysis for Assessing 2 MW Power Upgrade Project stage: Other ML19046A0302019-02-14014 February 2019 North Carolina State Univ., Response Submittal 2 to the Request for Additional Information for License Renewal Application Project stage: Request ML19046A0322019-02-14014 February 2019 North Carolina State Univ., Response to Request for Additional Information for License Renewal Application Project stage: Response to RAI ML19046A0312019-02-14014 February 2019 North Carolina State Univ., Response Submittal 2 to the Request for Additional Information for License Renewal Application Project stage: Request ML19221B5962019-06-21021 June 2019, 9 August 2019 North Carolina State University - Updated FSAR for License Renewal Application for Facility Operating License R-120 for Pulstar Research Reactor Project stage: Request ML19221B6022019-06-21021 June 2019 North Carolina State University, Safety Analysis in Support of Fueled Experiments for the Ncsu Pulstar Reactor Project stage: Other ML19221B6012019-08-0909 August 2019 North Carolina State University, Updated Safety Analysis Report Project stage: Other ML19221B5972019-08-0909 August 2019 North Carolina State University - Updated FSAR for License Renewal Application for Facility Operating License R-120 for Pulstar Research Reactor Project stage: Request ML19269B7072019-09-25025 September 2019 Pulstar Reactor Appendix a Technical Specifications Project stage: Other ML19269B7052019-09-25025 September 2019 Updated Technical Specifications for License Renewal Application for Facility Operating License R-120 for the North Carolina State University Pulstar Research Reactor Project stage: Request ML19269B7062019-09-25025 September 2019 Updated Technical Specifications for License Renewal Application for Facility Operating License R-120 for the North Carolina State University Pulstar Research Reactor Project stage: Request ML19308C7172019-11-0505 November 2019 North Carolina State University; Regulatory Audit License Renewal and Power Increase of the Pulstar Research Reactor Project stage: Other ML20084K7132020-02-11011 February 2020 North Carolina State Univ., Reactor Thermal Power and Scram Setpoint Determination Project stage: Other ML20084K7162020-03-24024 March 2020 North Carolina State Univ., Safety Analysis in Support of Fueled Experiments for Pulstar Reactor Project stage: Other ML20084K7082020-03-24024 March 2020 North Carolina State Univ., Appendix a for the Pulstar Reactor Project stage: Other ML20084K7042020-03-24024 March 2020 North Carolina State Univ., Submittal of Updated Technical Specifications for License Renewal Application for Facility Operating License R-120 Project stage: Request ML20149K7592020-05-26026 May 2020 Updated FSAR for License Renewal Application for Facility Operating License R-120 for the North Carolina State University Pulstar Research Reactor Project stage: Request ML21210A4272021-08-23023 August 2021 North Carolina State University - Request for Additional Information License Renewal Application for Facility Operating License No. R-120 for the North Carolina State University Pulstar Research Reactor Project stage: RAI ML22033A2452022-02-0202 February 2022 North Carolina State Univ., Response to Request for Additional Information License Renewal Application Project stage: Response to RAI ML22159A2372022-06-0707 June 2022 Supplemental Information for Cladding Fuel Accident - Updated FSAR Section 13 for License Renewal Application for Facility Operating License R-120 for the North Carolina State University Pulstar Research Reactor Project stage: Supplement ML24040A1602024-01-25025 January 2024 Email; Cfleming, NCSU to Dhardesty, USNRC-NC State Pulstar License Renewal Approach from Nc State (Jan. 2024) Project stage: Other 2019-02-14
[Table View] |
|
---|
Category:Letter
MONTHYEARML23268A4482023-10-0505 October 2023 Examination Confirmation Letter No. 50-297/Ol-24-01, North Carolina State University IR 05000297/20232012023-10-0404 October 2023 North Carolina State University - U.S. Nuclear Regulatory Commission Security Inspection Report No. 05000297/2023201 (Public) ML23214A0272023-08-0101 August 2023 Nc State University - Facility Organization Change ML23212A9732023-07-31031 July 2023 North Carolina State University, License Amendment Request ML23164A2142023-07-28028 July 2023 Safety Evaluation Regarding the License Amendment Request for Vented Fueled Experiments ML23194A1842023-07-20020 July 2023 North Carolina State University - Safety Evaluation for the Application for a License Amendment Request for TS 6.1.1 Regarding Training of Level 3 Management ML23163A1182023-07-13013 July 2023 Examination Report Letter No. 50-297/OL-23-01, North Carolina State University ML23187A4552023-07-0606 July 2023 North Carolina State University, License Amendment Request ML23171B0012023-06-20020 June 2023 Regulatory Audit License Amendment Request Regarding Fueled Experiments for the Pulstar Research Reactor (EPID L-2022-NFA-0004) License No. R-120; Docket No. 50-297 ML23163A1902023-06-12012 June 2023 Nc State University, Report for Event Number 56553 Technical Specification Violation ML23132A1262023-05-12012 May 2023 License Condition Change Request in Support of the License Amendment Request Regarding Fueled Experiments for the Pulstar Research Reactor (EPID L-2022-NFA-0004) (ML23075A056 Submittal Dated 13 March 2023) License R-120; Docket No. 50-297 ML23038A2332023-05-0404 May 2023 Examination Confirmation Letter No. 50-297-OL-23-01, North Carolina State University ML23089A0712023-03-30030 March 2023 North Carolina State Univ. - Annual Report for 2022 ML23075A0562023-03-13013 March 2023 Nc State University - Regulatory Audit License Amendment Request Regarding Fueled Experiments for the Pulstar Research Reactor ML22181B1842022-08-0101 August 2022 North Carolina State University - NRC Safety Inspection Report 2022202 ML22193A2022022-07-11011 July 2022 1 to the Pulstar Nuclear Reactor Emergency Plan ML22193A1672022-07-11011 July 2022 Supplemental Information Needed for Acceptance of the Application for a License Amendment Regarding Fueled Experiments for the Pulstar Research Reactor (EPID L-2022-NFA-0004) License No. R-120; Docket No. 50-297 ML22140A1782022-06-13013 June 2022 Examination Confirmation Letter No. 50-297/OL-22-02, North Carolina State University ML22152A2332022-06-0707 June 2022 Acceptance Review - Chance to Supplement - Fueled Experiments Final ML22159A2372022-06-0707 June 2022 Supplemental Information for Cladding Fuel Accident - Updated FSAR Section 13 for License Renewal Application for Facility Operating License R-120 for the North Carolina State University Pulstar Research Reactor IR 05000297/20222012022-06-0303 June 2022 North Carolina State University U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000297/2022201 ML22108A1682022-04-18018 April 2022 Nc State University - License Amendment Request for Fueled Experiments ML22084A5992022-03-25025 March 2022 North Carolina State Univ., Submittal of Annual Operating Report for 2021 ML22061A0342022-03-0101 March 2022 North Carolina State Univ - Report for Event Number 55747 'Technical Specification Violation ML21334A1782021-11-30030 November 2021 North Carolina State Univ., Submittal of Response to the Request for Additional Information for License Renewal Application for Facility Operating License R-120 for the Pulstar Research Reactor ML21288A0842021-10-19019 October 2021 Examination Confirmation Letter No. 50-297/OL-22-01, North Carolina State University ML21244A3362021-09-21021 September 2021 North Carolina State University Request for Additional Information License Renewal Application for Facility Operating License No. R-120 for the Pulstar Nuclear Research Reactor ML21210A4272021-08-23023 August 2021 North Carolina State University - Request for Additional Information License Renewal Application for Facility Operating License No. R-120 for the North Carolina State University Pulstar Research Reactor ML21158A2772021-06-10010 June 2021 North Carolina State University Regulatory Audit of Loss of Coolant Accident Described in the Renewed Operating License Rnewal Application ML21085A6902021-03-26026 March 2021 Nc State University - Annual Report for 2020 IR 05000297/20202022020-12-0808 December 2020 North Carolina Station University - USNRC Inspection Report 05000297/2020202 ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards ML20309A9502020-11-0505 November 2020 Examination Confirmation Letter No. 50-297/OL-21-01, North Carolina State University ML20273A3432020-09-25025 September 2020 North Carolina State Univ - Reply to a Notice of Violation; 50-120/2020-201-01. Supplemental Data for 2019 Annual Operating Report Enclosed ML20273A3402020-09-25025 September 2020 Nc State University - Reply to a Notice of Violation; 50-120/2020-201-01 Supplemental Data for 2017 Annual Operating Report Enclosed ML20273A3382020-09-25025 September 2020 North Carolina State Univ - Reply to a Notice of Violation; 50-120/2020-201-01 ML20273A3372020-09-25025 September 2020 Nc State University - Reply to a Notice of Violation; 50-120/2020-201-01. Supplemental Data for 2015 Annual Operating Report Enclosed ML20273A3412020-09-25025 September 2020 Nc State University - Reply to a Notice of Violation; 50-120/2020-201-01. Supplemental Data for 2018 Annual Operating Report Enclosed ML20246G5772020-08-31031 August 2020 Nc State University - Reply to a Notice of Violation; 50-120/2020-201-01 IR 05000297/20202012020-07-31031 July 2020 North Carolina State University; U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000297/2020201 ML20149K7592020-05-26026 May 2020 Updated FSAR for License Renewal Application for Facility Operating License R-120 for the North Carolina State University Pulstar Research Reactor ML20091H7002020-03-30030 March 2020 North Carolina State Univ., Transmittal of Pulstar Reactor Environmental Radiation Surveillance Report ML20084K7042020-03-24024 March 2020 North Carolina State Univ., Submittal of Updated Technical Specifications for License Renewal Application for Facility Operating License R-120 ML20052F1682020-02-24024 February 2020 Examination Confirmation Letter No. 50-297/OL-20-01, North Carolina State University ML19308C7172019-11-0505 November 2019 North Carolina State University; Regulatory Audit License Renewal and Power Increase of the Pulstar Research Reactor ML19269B7062019-09-25025 September 2019 Updated Technical Specifications for License Renewal Application for Facility Operating License R-120 for the North Carolina State University Pulstar Research Reactor ML19240B5452019-09-0505 September 2019 North Carolina State University, Acknowledgement of Withdrawal of License Amendment Request Regarding Fueled Experiments for the Pulstar Research Reactor ML19221B5972019-08-0909 August 2019 North Carolina State University - Updated FSAR for License Renewal Application for Facility Operating License R-120 for Pulstar Research Reactor ML19141A3622019-05-29029 May 2019 Examination Report No. 50-297/OL-19-01, North Carolina State University 2023-08-01
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML21244A3362021-09-21021 September 2021 North Carolina State University Request for Additional Information License Renewal Application for Facility Operating License No. R-120 for the Pulstar Nuclear Research Reactor ML21210A4272021-08-23023 August 2021 North Carolina State University - Request for Additional Information License Renewal Application for Facility Operating License No. R-120 for the North Carolina State University Pulstar Research Reactor ML18348A0132018-12-13013 December 2018 Request for Time Extension for the Request for Additional Information for License Renewal Application for Facility Operating License R-120 for the North Carolina State University Pulstar Research Reactor ML18268A3582018-10-18018 October 2018 North Carolina State University - Request for Additional Information License Renewal Application for Facility Operating License R-120 for the North Carolina State University Pulstar Research Reactor ML18128A0472018-05-21021 May 2018 North Carolina State University Pulstar Research Reactor - Letter Request for Additional Information Regarding the Renewal of Facility Operating License No. R-120, Docket No. 50-297 ML16041A0162016-03-0101 March 2016 297-NC State Fueled Exp RAIs (2-08-16) ML15316A5812015-11-19019 November 2015 North Carolina State University Pulstar Research Reactor- Amendment NO.19 to Amended Facility Operating License No. R-120 ML0728404952007-10-23023 October 2007 Request for Additional Information Regarding Amendment 17 of Operating License R-120 for the North Caroline State University Pulstar Reactor ML0527203492005-10-0707 October 2005 RAI Letter - Security Measures - Cook 2021-09-21
[Table view] |
Text
+
October 18, 2018 Dr. Ayman I. Hawari, Director Nuclear Reactor Program Department of Nuclear Engineering North Carolina State University 2500 Stinson Drive Campus Box 7909 Raleigh, NC 27695-7909
SUBJECT:
NORTH CAROLINA STATE UNIVERSITY - REQUEST FOR ADDITIONAL INFORMATION RE: LICENSE RENEWAL APPLICATION FOR FACILITY OPERATING LICENSE NO. R-120 FOR THE NORTH CAROLINA STATE UNIVERSITY PULSTAR RESEARCH REACTOR (EPID NO. L-2017-RNW-0026)
Dear Dr. Hawari:
The U.S. Nuclear Regulatory Commission (NRC) staff is continuing its review of the North Carolina State University (NCSU) PULSTAR Research Reactor license renewal application (LRA) letter, dated February 24, 2017 (a copy is available on the NRCs public website at www.nrc.gov under Agencywide Documents Access and Management System (ADAMS)
Accession No. ML17088A819). Included with the NCSU LRA was the Safety Analysis Report (ADAMS Accession No. ML17201Q129 - redacted version), the Financial Qualifications Report (ADAMS Accession No. ML17088A828), the Environmental Report (ADAMS Accession No. ML17088A836) and the Reactor Operator Training and Requalification Program (ADAMS Accession No ML17088A840).
The NRC staff has reviewed the NSCU proposed LRA and identified the items in the attached enclosure, which need additional information or clarification. We request that you provide responses within 60 days from the date of this letter.
In accordance with Title 10 of the Code of Federal Regulations (CFR) 50.30(b), Oath or affirmation, NCSU must execute its response in a signed original document under oath or affirmation. The response must be submitted in accordance with 10 CFR 50.4, Written communications. Information included in your response that is considered sensitive or proprietary, that you seek to have withheld from the public, must be marked in accordance with 10 CFR 2.390, Public inspections, exemptions, requests for withholding. Any safeguards information included in your response should be submitted in accordance with 10 CFR 73.21, Protection of Safeguards Information: Performance Requirements. Following receipt of the additional information, the NRC staff will continue its evaluation of the renewal request application.
A. Hawari If you have any questions, or need additional time to respond to this request, contact me at 301-415-3724, or by electronic mail at Duane.Hardesty@nrc.gov.
Sincerely, R/A Duane A. Hardesty, Senior Project Manager Research and Test Reactors Licensing Branch Division of Licensing Projects Office of Nuclear Reactor Regulation Docket No. 50-297 License No. R-120
Enclosure:
As stated cc: See next page
North Carolina State University Docket No. 50-297 cc:
Office of Intergovernmental Relations 116 West Jones Street Raleigh, NC 27603 Dr. Kostadin Ivanov, Head Department of Nuclear Engineering North Carolina State University Campus Box 7909 Raleigh, NC 27695-7909 W. Lee Cox, Section Chief Department of Health and Human Services Division of Health Service Regulation Radiation Protection Section 1645 Mail Service Center Raleigh, NC 27699-1645 Dr. Louis Martin-Vega, Dean College of Engineering North Carolina State University 113 Page Hall Campus Box 7901 Raleigh, NC 27695-7901 Test, Research and Training Reactor Newsletter P.O. Box 118300 University of Florida Gainesville, FL 32611 Gerald Wicks, CHP Reactor Health Physicist Department of Nuclear Engineering North Carolina State University Campus Box 7909 2500 Stinson Dr.
Raleigh, NC 27695-7909 Andrew T. Cook Manager of Engineering and Operations Nuclear Reactor Program Department of Nuclear Engineering North Carolina State University Campus Box 7909 2500 Stinson Drive Raleigh, NC 27695-7909
ML18268A358
- concurrence via email NRR-088 OFFICE NRR/DLP/PRLB/PM NRR/DLP/PRLB/LA* NRR/DLP/PRLB/BC NRR/DLP/PRLB/PM NAME DHardesty(GWertz for) NParker AAdams DHardesty DATE 10/17/2018 10/17/2018 10/18/2018 10/18/2018
OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE RENEWAL FOR THE NORTH CAROLINA STATE UNIVERSITY-PULSTAR REACTOR LICENSE NO. R-120; DOCKET NO. 50-297 The U.S. Nuclear Regulatory Commission (NRC) staff is continuing its review of the North Carolina State University (NCSU) PULSTAR Research Reactor license renewal application (LRA) letter, dated February 24, 2017 (a copy is available on the NRCs public website at www.nrc.gov under Agencywide Documents Access and Management System (ADAMS)
Accession No. ML17088A819). Included with the NCSU LRA was the Safety Analysis Report (SAR) (ADAMS Accession No. ML17201Q129 - redacted version), the Financial Qualifications Report (ADAMS Accession No. ML17088A828), the Environmental Report (ADAMS Accession No. ML17088A836), and the Reactor Operator Training and Requalification Program (ROTRP)
(ADAMS Accession No ML17088A840). The NRC staff has reviewed the NCSU proposed LRA and identified the items below which need additional information or clarification. We request that you provide responses within 60 days from the date of this letter.
These RAIs have been developed based on the following requirements applicable to the NCSU LRA:
- The regulations in Title 10 of the Code of Federal Regulations (10 CFR).
- The regulations in 10 CFR Part 20, Standards for Protection against Radiation, require that radiation doses to workers and members of the public be limited. To support meeting the public dose limits, 10 CFR Part 20, also limits the release of radioactive materials from the licensed facility to the environment (e.g., 10 CFR Part 20, Appendix B, Table 3).
- The regulations in 10 CFR 50.9, Completeness and accuracy of information, require that information provided to the Commission by a licensee shall be complete and accurate in all material respects.
- The regulations in 10 CFR 50.21, Class 104 licenses; for medical therapy and research and development facilities, provides, in part, the definition for a class 104 license for a utilization facility useful in the conduct of research.
- The regulations in 10 CFR Part 51, Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions, provides requirements for environmental protection regulations applicable to NRC's domestic licensing and related regulatory functions.
- The regulations in 10 CFR Part 55, Operators Licenses, provided requirements for the issuance of operator licenses for utilization facilities.
Enclosure
Financial Qualifications Report (ADAMS Accession No. ML17088A828)
- 1. The NCSU LRA Financial Qualifications Report provided annual funding and operating expenditures, in Table 1, PULSTAR Reactor Facility Annual Funding, and annual operating expenditures in Table 2, PULSTAR Reactor Facility Annual Operating Expenditures, for fiscal years 2018 through 2022. However, based on the financial information provided, as referenced above, the NRC staff is unable to verify that the PULSTAR facility continues to operate within the definition of 10 CFR 50.21 as a class 104(c) research facility.
The regulations in 10 CFR 50.21(c), provide the definition of a class 104(c) facility, and which states, that the facility is a production or utilization facility, which is useful in the conduct of research and development activities of the types specified in section 31 of the
[Atomic Energy] Act, and which is not a facility of the type specified in paragraph (b) of this section or in [10 CFR] 50.22. Regulations in 10 CFR 50.22 state, in part, that in the case of a production or utilization facility which is useful in the conduct of research and development activities of the types specified in section 31 of the [Atomic Energy] Act, such facility is deemed to be for industrial or commercial purposes if the facility is to be used so that more than 50 percent of the annual cost of owning and operating the facility is devoted to the production of materials, products, or energy for sale or commercial distribution, or to the sale of services, other than research and development or education or training.
Provide a confirmatory statement that no more than 50 percent of the cost of owning and operating the facility is devoted to the production of materials, products, or energy for sale or commercial distribution, or to the sale of services, other than research and development or education or training or justify why no changes are needed.
Environmental Report (ADAMS Accession No: ML17088A836)
- 2. The NCSU LRA letter (ADAMS Accession No: ML17088A819) requested a power level increase of its Facility Operating License from 1.0 megawatt (MWt) to 2.6 MWt. Included in the LRA environmental report (ER), Section 4, Environmental Effects of Facility Operation, was the following statement: Operation of the reactor at 2 MW will not cause a significant increase in radiation levels or effluent. The NRC staff is not clear if the ER was performed at the proposed 2.0 MWt or 2.6 MWt power levels.
The regulations in 10 CFR 51.45(c) contain the requirements for an applicants ER, and states that an ER should contain sufficient data to aid the Commission in its development of an independent analysis.
Provide an updated ER with an environmental impact analysis that describes the operational changes associated with the proposed power level increase including effluents, doses, cooling demand, makeup water usage, and waste generation, including batch discharges to the sanitary sewer for operation at the proposed power level of 2.6 MWt, or justify why no changes are needed.
Note: The updated ER should properly bound the impacts commensurate with the proposed power level increase, including reference to a documented analysis methodology that identifies assumptions and accounts for any margins for instrument inaccuracies and measurement uncertainty in determining maximum power for the analysis.
Safety Analysis Report (ADAMS Accession No: ML17201Q129)
- 3. The NCSU LRA requested a power level increase from 1.0 MWt to 2.6 MWt. Included in LRA SAR, Section 11, Radiation Protection Program and Waste Management, were radiation dose calculations that appear to assume operation at 2.0 MWt. The NRC staff is not clear if the dose calculations were performed at 2.0 MWt rather than the proposed 2.6 MWt power level.
The regulations in 10 CFR Part 20 require that doses to workers and members of the public be limited. LRA SAR Section 11 provided various dose calculations that would be necessary to make this determination (i.e., the concentrations of and the doses to workers/members of the public from any radiological effluents).
Provide clarification that the dose calculations provided in LRA SAR Section 11 comply with the limits in 10 CFR Part 20 for the proposed power level increase of 2.6 MWt or justify why no changes are needed.
Reactor Operator Training and Requalification Program (ADAMS Accession No. ML17088A840)
- 4. The regulations in 10 CFR 55.59, Requalification, paragraph (a)(2) state: Each licensee shall Pass a comprehensive requalification written examination and an annual operating test.
ROTRP Section 2.c states, in part: The responsibility for this program rests with the Manager of Engineering and Operations (or a duly authorized representative). This responsibility shall cover the following items: (c) Granting of exemptions to the requalification program as provided for in this plan.
The granting of exemptions to the requalification program statement is not explained anywhere in the ROTRP. Revise the ROTRP to clarify the use of this statement or justify why no changes are needed.
- 5. The regulations in 10 CFR 55.59(c)(4)(iii) state: The requalification program must include Systematic observation and evaluation of the performance and competency of licensed operators and senior operators by supervisors and/or training staff members, including evaluation of actions taken or to be taken during actual or simulated abnormal and emergency procedures.
ROTRP Section 3.f states, in part: For the first 12 month interval and for the second 12 month interval of the 24 month period, the licensed individual shall (f) Complete a review of documents, including abnormal and emergency procedures.
ROTRP Section 5, Evaluation, makes no mention of how the licensee is going to meet the requirements in 10 CFR 55.59(c)(4)(iii). Revise the ROTRP to state how the 10 CFR 55.59(c)(4)(iii) requirements will be satisfied or justify why no changes are needed.
Supporting Information
- 6. The regulations in 10 CFR 50.9, Completeness and accuracy of information, require that information provided to the Commission by a licensee shall be complete and accurate in all material respects.
The NRC staff, in its review of the NCSU LRA, finds that the following supporting information is necessary to continue its review:
- a. North Carolina State University PULSTAR Reactor, Safety Analysis for Assessing 2 MW Power Upgrade for the NCSU PULSTAR Reactor, March 2017.
- b. North Carolina State University, Burlington Hall Research Reactor Piping Upgrade Final Engineering Report, Enercon Services, October 2013.
- c. North Carolina State University PULSTAR Reactor, Calculation No. NRP-98 Criticality Analysis for a 250 Fresh Fuel Pin Storage Rack, December 1998 (SAR Reference 13-11).
- d. Hey, B.E., Computation of Delayed Fission Product Gamma Ray Dose Rates for NCSU PULSTAR Using Monte Carlo Number Albedo Approach, Master Thesis, 1984 (SAR Reference 13-16).
Provide the following information or justify why the supporting information cannot or will not be provided.