Site: | Turkey Point ![]() |
Issue date: | 04/10/1975 |
From: | Robert E. Uhrig Florida Power & Light Co |
To: | Saltzman J Office of Nuclear Reactor Regulation |
References | |
Download: ML18228A307 (4) | |
Similar Documents at Turkey Point | |
---|---|
Category:Legal-Insurance/Indemnity Document
MONTHYEARL-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023
[Table view]and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2022-012, Florida Power & Light Company Nuclear Property Insurance - 10 CFR 50.54(w)(3)2022-03-16016 March 2022 Florida Power & Light Company Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML21084A2102021-03-22022 March 2021 Units 1 and 2, Nuclear Property Insurance - 10 CFR S0.54(w)(3) L-2020-040, Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2020-03-11011 March 2020 Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2019-052, Florida Power and Light Co. - Nuclear Property Insurance - 10 CFR 50.54(w)(3)2019-03-18018 March 2019 Florida Power and Light Co. - Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML18057B1362018-04-12012 April 2018 Indemnity Agreement No. B-46 L-2018-060, Florida Power & Light: Nuclear Property Insurance - 10 CFR 50.54(w)(3)2018-03-26026 March 2018 Florida Power & Light: Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2017-200, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2017-12-13013 December 2017 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2016-062, NextEra Energy Nuclear Property Insurance - 10 CFR 50.54(w)(3)2016-03-28028 March 2016 NextEra Energy Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML15260A5572015-08-28028 August 2015 Certificate of Liability Insurance ML15260A5542015-08-28028 August 2015 Certificate of Liability Insurance No. ATL-003533264-03, Rev. 3 Issued to NextEra Energy, Inc ML0219804912002-07-0909 July 2002 Marsh, Inc. Nuclear Liability Insurance Endorsements - 2001 ML18228A3061978-09-0808 September 1978 09/08/1978 Letter Amendment No. 9 to Indemnity Agreement No. B-46 ML18228A2571978-01-31031 January 1978 Submit Endorsements Representing Secondary Financial Protection Under Maelu for Plants ML18227D9221978-01-31031 January 1978 1/31/1978 Letter Submits Endorsements No. 1 to Binders XB-59 St. Lucie Unit 1, XB-25 Turkey Point Unit 3, and XB-26 Turkey Point Unit, 4 Representing Secondary Financial Protection Under Maelu for Plants ML18110A2551978-01-17017 January 1978 Letter Enclosing Endorsement No. 18 to Nelia Policy NS-308 Representing Nuclear Energy Liability Coverage ML18228A2601978-01-17017 January 1978 Enclosed Endorsement No. 18 to Nelia Policy NS-308 Representing Nuclear Energy Liability Coverage ML18228A2591978-01-17017 January 1978 Submit Binders Representing Secondary Financial Protection Under Nuclear Energy Liability Insurance Association (Nelia) ML18228A2581978-01-17017 January 1978 Enclosed Endorsement No. 44 to Policy No. NF-185, Nuclear Energy Liability Policy Covering Turkey Point Plants ML18227D9231978-01-17017 January 1978 1/17/1978 Letter Endorsement No. 44 to Policy No. NF-185 Representing Nuclear Energy Liability Coverage at the Turkey Point Plant ML18227D9241978-01-17017 January 1978 1/17/1978 Letter Endorsement No. 18 to Nelia Policy NS-308 Representing Nuclear Energy Liability (Suppliers and Transporters Form) Coverage at Turkey Point and St. Lucie Plants ML18227D9251978-01-17017 January 1978 1/17/1978 Letter Binders EB-25 Turkey Point Unit 3, EB-26 Turkey Point Unit 4, & EB-59 St. Lucie Unit 1 Representing Secondary Financial Protection Under Nuclear Energy Liability Insurance Association (Nelia) ML18110A2591978-01-17017 January 1978 Letter Enclosing Binders EB-25, EB-26, and EB-59 Representing Secondary Financial Protection Under Nuclear Energy Liability Insurance Association ML18228A3111977-10-14014 October 1977 10/14/1977 Letter Indemnity Agreements Nos. 31 Through 36 to Policy No. MF-55, and Indemnity Agreement No. 36 to Policy No. NF-185 ML18228A2611977-09-26026 September 1977 09/26/1977 Letter Endorsement Nos. 16 and 17 to Nelia Policy NS-308, Representing Nuclear Energy Liability L-77-303, 9/26/1977 Letter Endorsement Nos. 16 and 17 to Nelia Policy NS-308 Representing Nuclear Energy Liability (Suppliers and Transporters Form) Coverage at Turkey Point and St. Lucie Plants1977-09-26026 September 1977 9/26/1977 Letter Endorsement Nos. 16 and 17 to Nelia Policy NS-308 Representing Nuclear Energy Liability (Suppliers and Transporters Form) Coverage at Turkey Point and St. Lucie Plants L-77-293, 9/19/1977 Letter Endorsement Nos. 17 & 18 to Maelu Policy MS-59 Representing Nuclear Energy Liability (Suppliers and Transporters Form) Coverage at Turkey Point and St. Lucie Plants1977-09-19019 September 1977 9/19/1977 Letter Endorsement Nos. 17 & 18 to Maelu Policy MS-59 Representing Nuclear Energy Liability (Suppliers and Transporters Form) Coverage at Turkey Point and St. Lucie Plants ML18228A2621977-09-19019 September 1977 09/19/1977 Letter Endorsement Nos. 17 and 18 to Maelu Policy MS-59, Representing Nuclear Energy Liability ML18110A2811977-09-19019 September 1977 Letter Enclosing Endorsement Nos. 17 and 18 to Maelu Policy MS-59 Representing Nuclear Energy Liability Coverage L-77-187, 9/23/1977 Letter Endorsement Nos. 15 and 16 to Maelu Policy MS-59, Representing Nuclear Energy Liability (Suppliers and Transporters Form) Coverage at Turkey Point and St. Lucie Plants1977-06-23023 June 1977 9/23/1977 Letter Endorsement Nos. 15 and 16 to Maelu Policy MS-59, Representing Nuclear Energy Liability (Suppliers and Transporters Form) Coverage at Turkey Point and St. Lucie Plants ML18228A2651977-06-23023 June 1977 06/23/1977 Letter Endorsement Nos. 35 and 36 to Policy No. MF-55, Representing Nuclear Energy Liability ML18228A2631977-06-23023 June 1977 06/23/1977 Letter Endorsement Nos. 15 and 16 to Maelu Policy MS-59, Representing Nuclear Energy Liability L-77-188, 6/23/1977 Letter Endorsement. Nos. 35 and 36 to Policy No. MF-55 Representing Nuclear Energy Liability Coverage at Turkey Point Plant1977-06-23023 June 1977 6/23/1977 Letter Endorsement. Nos. 35 and 36 to Policy No. MF-55 Representing Nuclear Energy Liability Coverage at Turkey Point Plant L-77-170, Transmittal of Endorsement Nos. 14 and 15 to Nelia Policy NS-308 Representing Nuclear Energy Liability (Suppliers and Transporters Form) Coverage1977-06-0909 June 1977 Transmittal of Endorsement Nos. 14 and 15 to Nelia Policy NS-308 Representing Nuclear Energy Liability (Suppliers and Transporters Form) Coverage ML18228A2671977-06-0909 June 1977 06/09/1977 Letter Endorsement Nos. 42 and 43 to Policy No. NF-185 Representing Nuclear Energy Liability Coverage ML18228A3121977-04-25025 April 1977 04/25/1977 Letter Amendment No. 8 to Indemnity Agreement No. B-46 ML18228A2681977-03-0101 March 1977 03/01/1977 Letter Endorsement No. 13 to Maelu Policy MS-59 Representing Nuclear Energy Liability ML18228A2691977-02-24024 February 1977 02/24/1977 Letter Endorsement No. 41 to Policy No. NF-185 Representing Nuclear Energy Liability Coverage ML18228A2701977-02-15015 February 1977 02/15/1977 Letter Endorsement Nos. 31, 32, and 33 to Maelu Policy No. MF-55 Representing Nuclear Energy Liability Coverage ML18227D9381977-01-14014 January 1977 Nuclear Energy Liability Insurance Association Policy No. NF-185 ML18228A2721977-01-14014 January 1977 01/14/1977 Letter Endorsement Nos. 37, 38, 39, and 40 to Policy No. NF-185 Representing Nuclear Energy Liability Coverage ML18228A2711977-01-14014 January 1977 01/14/1977 Letter Endorsement Nos. 11 and 12 to Nelia Policy NS-308 Representing Nuclear Energy Liability Coverage ML19301B6401976-12-0606 December 1976 Advance Premium Endorsement & Standard Premium Endorsement, Calendar Year 1977 for Policy No. MF-55 Issued to Florida Power & Light Company ML18228A2731976-07-0909 July 1976 07/09/1976 Letter Endorsement Nos. 28 and 29 to Policy No. MF-55 Representing Nuclear Energy Liability Coverage ML18228A2741976-06-18018 June 1976 06/18/1976 Letter Endorsement No. 35 to Policy No. NF-185, Nuclear Energy Liability Policy Coverage ML18228A2761976-02-0505 February 1976 02/05/1976 Letter Endorsement No. 27 to Policy No. MF-55 Issued by Mutual Atomic Energy Liability Underwriters ML18110A3201976-02-0404 February 1976 02/04/1976 Letter Enclosure of Nuclear Energy Liability Policy NS-308 and Mutual Atomic Energy Liability Underwriters Policy No. MS-59 ML18228A2751976-02-0404 February 1976 02/04/1976 Letter Nuclear Energy Liability Policy NS-308 and Mutual Atomic Energy Liability Underwriters Policy No. MS-59 for Coverage ML18228A2771976-01-22022 January 1976 01/22/1976 Letter Endorsement No. 34 to Policy No. NF-185, Nuclear Energy Liability Policy ML18227D9211976-01-12012 January 1976 01/12/1976 Letter Endorsement No. 20 to NELIA-NF-195 2023-03-10 Category:Letter MONTHYEARML24023A0342024-02-0505 February 2024
[Table view]Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0038 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML23341A2102024-01-22022 January 2024 LTR-23-0216-1 - Closure Letter - 2.206 Petition for License Renewal Plant Reactor Pressure Vessel Embrittlement ML23320A3062024-01-22022 January 2024 Issuance of Amendment Nos. 298 and 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report ML23340A0332023-12-0101 December 2023 FPL to Fws, Comments Submitted by Florida Power and Light on the Species Status Assessment Accompanying the September 20, 2023 Proposed Threatened Species Status with Section 4(d) Rule for the Miami Cave Crayfish L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23333A0152023-11-27027 November 2023 Attachment G - Arcadis Memo Re FPL Year 4 Raasr Final (June 2, 2023, Appended to Derm letter)-1 ML23333A0102023-11-27027 November 2023 Attachment B - 11/07/2022 - Waterkeeper Scoping Comments-1 L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles IR 05000250/20230032023-11-0909 November 2023 Integrated Inspection Report 05000250/2023003 and 05000251/2023003 ML23310A1342023-11-0404 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 Petition Amendment; Turkey Point Subsequent Renewal with Petitioner 11/04/2023 ML24016A2622023-10-25025 October 2023 Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected Project L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published IR 05000250/20230102023-09-29029 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000250/2023010 and 05000251/2023010 ML23234A1922023-09-27027 September 2023 Issuance of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications ML23265A5492023-09-22022 September 2023 Transmittal of WCAP-18830-P/NP Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles to Support a License Amendment Request from FPL - License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23243A9522023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9542023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9532023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9552023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application - Tribe- Section 106 Letters ML23199A2352023-09-0505 September 2023 Letter to EPA-Turkey Point Nuclear Generating Station, Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal ML23199A2482023-09-0505 September 2023 Ltr to Florida Power and Light Co - Turkey Point Nuclear Generating Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project IR 05000250/20230052023-08-21021 August 2023 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2023005 and 05000251/2023005) L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000250/20230022023-08-14014 August 2023 Integrated Inspection Report 05000250/2023002 and 05000251/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23242A0922023-08-0606 August 2023 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment ML23198A2702023-08-0303 August 2023 Issuance of the Site-Specific Environmental Impact Statement Scoping Process Summary Report Associated with the Turkey Point Nuclear Generating Unit Numbers 3 and 4, Subsequent License Renewal Application, Environmental Report Supplement 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23178A1872023-07-25025 July 2023 Review of the Spring 2022 Steam Generator Tube Inspections During Refueling Outage No. 33 ML23188A1242023-07-20020 July 2023 Acknowledgment of Temporary Suspension Request for License Request for License Amendment Request Reactor Protection System, Engineered Safety Features System, and Nuclear Instrumentation System ML23200A0672023-07-18018 July 2023 Tp 2023 RQ Inspection Notification Letter ML23173A0812023-07-17017 July 2023 Supplement to Regulatory Audit Plan in Support of Review of License Amendment Request Supporting Digital Instrumentation & Control Modernization Project (EPID L-2022-LLA-0105) - Non-Proprietary L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) 2024-02-05 |
Text
>. O. BOX 013100, gusll/y~~
MIAMI, FLORIDA 33101 c-r I/I 4
//g]I)$%
FLORIDA POWER 5 LIGHT CO'v" I >PsY April 10, 1975 Nr. Jerome Saltzman, Deputy Chief Office of Antitrust and Indemnity Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Dear Nr. Saltzman:
Re: Indemnit A reement No.-B-46 Amendment No. 8 Me are enclosing herewith a copy of a requested change in Indemnity Agreement for Turkey Point Units 3 & 4 (8-46).
This amendment xedesignates the nuclear area for the above units.
Yours very truly, Vice President REU:nch Q/I)
~p ll HELPING 8UILD FLOF\ ISA
Lg P Q I'
lg
Amendment to Indemnity Agreement No. B-46
~~~4 L. Amendment No. 8 Effective April 14, 1975, Indemnity Agreement No. B-46 dated August 4, 1970, between Florida Power 6 Light Company and the Nuclear Regulatory Commission as amended, is hereby further amended as follows:
Item 4 Location is deleted and replaced by the following
.site location description:
Item-4-Location-All of the premises including the land, all buildings and structures.
of Units 3 6 4 of Turkey Point Po~er Station designated as the "nuclear area" on drawing PA-2, attached hereto and made a part hereof. The Turkey Point Power Station is located on the shores of Biscyane Bay approximately twenty-five (25) miles south of Miami, Florida.
4