Humboldt Bay ISFSI - Transmittal of License Renewal Application
ML18215A180
Person / Time
Site: Humboldt Bay
Issue date: 07/10/2018
From: Welsch J M
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
Shared Package
ML18215A202 List:
References
HIL-18-006
Download: ML18215A180 (3)


Text

July 10, 2018 James M. Welsch Vice President Nuclear Generation and Chief Nuclear Officer Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 805.545.3242 E-Mail: James.Welsch@pge.com PG&E Letter HIL-18-006 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 10 CFR 72.42 Docket No. 72-27, Materials license No. SNM-2514 Humboldt Bay Independent Spent Fuel Storage lm;tallation License Renewal Application for the Humboldt Bay Independent Spent Fuel Storage Installation

/

References:

1. NUREG-1927, Revision 1, Standard Review Plan for Renewal of Specific Licenses and Certificates of Compliance for Dry Storage of Spent Nuclear Fuel, Nuclear Regulatory Commission, Office of Nuclear Material Safety and Safeguards, dated June 2016 2. NEI 14-03, Revision 2, Format, Content and Implementation Guidance for Dry Cask Storage Operations-Based Aging Managem~nt, dated December 2016 Dear Commissioners and Staff: Pursuant to 10 CFR 72.42, Pacific Gas and Electric Company (PG&E) submits the attached application for renewal of the Humboldt Bay (HB) site-specific Independent Spent Fuel Storage Installation (ISFSI) License SNM-2514.

The current license expires Novem,ber 17, 2025. The application requests that this license be renewed for an additional 40 years beyond the current expiration date. The license Renewal Application (LRA) format and content are based on 10 CFR Part 72 and the guidance contained in References 1 and 2. The LRA is included in the Enclosure and is provided on one disk labeled, "Humboldt Bay Independent Spent Fuel Storage Installation Site Specific License Renewal Application, Revision 0, July 2018." It should be noted that the disk also -contains a copy of the HB ISFSI living Updated* Final Safety Analysis Report (UFSAR) as of March 2018. The UFSAR contains the current design bases

  • information as required by 10 CFR 72.70 and is.being provided for reference purposes.

The contents are in Adobe Acrobat Portable Document Format (pdf) ..

,-------Document Control Desk July 10, 2018 PG&E Letter HIL-18-006 Page2 The disk contains the following files: Filename File Size HB ISFSI Living FSAR-March 2018.pdf 227 MB Humboldt Bay ISFSI License Renewal Application, Rev. O.pdf 8.94 MB PG&E's decision to submit the lRA early is based on the current availability of individuals knowledgeable in the license renewal process, and the original design . and licensing of the HB ISf SI. PG&E requests a 60-day implementation period after receiving the renewed license so that applicable program and procedure changes can be completed.

PG&E makes no new or revised regulatory commitments (as defined by NE! 99-04) in this letter. If you have any questions or require additional information, please contact Mr. Philippe Soenen at 805-595-6461.

I declare under penalty of perjury that th'e foregoing is true and correct. Executed on July 10, 2018. Sincerely, Vice President, Nuclear Generation and Chief Nuclear Officer Enclosure cc: cc/enc: Humboldt Distribution William C. Allen, NMSS Project Manager Kristina Banovac, NMSS Project Manager Kriss M. Kennedy, Region IV Administrator Gonzalo L. Perez, California Department of Public Health L __ Enclosure PGE Letter HIL-18-006 Humboldt Bay Independent Spent Fuel Storage Installation Site Specific License Renewal Application, Revision 0, July 2018 i 1