ML18208A175

From kanterella
Jump to navigation Jump to search
Revised Site Addendum Item - Chapter 17.0, Quality Assurance
ML18208A175
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/19/2018
From:
Ameren Missouri, Union Electric Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML18207A460 List:
References
ULNRC-06442
Download: ML18208A175 (2)


Text

CALLAWAY - SA17.0-iTABLE OF CONTENTSCHAPTER 17.0QUALITY ASSURANCE Section Page17.2QUALITY ASSURANCE DURING THE OPERATIONS PHASE

..................17.2-1 CALLAWAY - SA17.2-1Rev. OL-13 5/0317.2QUALITY ASSURANCE DURING THE OPERATIONS PHASE The Operational Quality Assu rance Program for the Union Electric Company Callaway Plant is described in the O perating Quality A ssurance Manual (OQAM). The Quality Assurance Program description, formerly also maintained in th is section of the FSAR, is now maintained solely in the OQAM as a separate licens ing document. The OQAM will be maintained in accordance with the requirement s of 10 CFR 50.54.