ML18170A298
| ML18170A298 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 06/19/2018 |
| From: | Wink R Ameren Missouri, Union Electric Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML18207A460 | List:
|
| References | |
| ULNRC-06442 | |
| Download: ML18170A298 (4) | |
Text
Ameren MISSOURI Callaau P1 June 19, 201$
U LNRC-06442 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-000 1 10 CFR 2.390(d)(l) 10 CFR 50.4(h)(6) 10 CFR 50.71(e) 10 CFR 54.37(b)
Ladies and Gentlemen:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT I UNION ELECTRIC CO.
RENEWED FACILITY OPERATING LICENSE NPF-30 FINAL SAFETY ANALYSIS REPORT REVISION OL-23 AND TECHNICAL SPECIFICATION BASES REt1ISION 14 In accordance with the requirements of 10 CFR 50.71(e). 10 CFR 50.4(h)(6), and Callaway Plant Technical Specification (TS) 5.5.14, Union Electric Company (Ameren Missouri) herewith submits Revision OL-23 to the Callaway Plant Final Safety Analysis Report (ESAR) (Standard Plant and Site Addendum), as well as Revision 14 to the Callaway Plant Technical Specification Bases (IS Bases).
The FSAR has been revised to include all of the changes made to the plant during the period from submittal of the last FSAR tipdate (November 10, 2016) to 6 months prior to the date of this filing.
Pursuant to IS 5.5.14. theTS Bases have been revised to reflect all of the changes made to the plant since the time when Revision 13 was issued (November 10, 2016).
These documents are being transmitted in electronic format in accordance with the guidance of Regulatory Issue Summary (RIS) 2001-05, dated January 25, 2001. With respect to the FSAR, redacted and non-redacted versions are maintained due to the inclusion of sensitive unclassified, non-safeguards information (SUNSI) in the ESAR (as identified and affirmed in response to RIS 20 15-17, dated December 23, 2015). Two CD-ROMs are therefore provided with this submittal. One CD ROM provides a complete non-redacted copy of the Callaway Plant FSAR, including SUNSI material that should be withheld from public disclosure in accordance with 10 CFR 2.390(d)(1). A second CD ROM provides a compLete redacted copy of the Callaway Plant FSAR.
Box 620 fulton, MO 65251 AmerenMissou.com
ULNRC-06442 June 19, 2018 Page 2 of4 In addition to the updated FSAR, the enclosed CD-ROMs include the Callaway Plant Operating License, TS, IS Bases, and NRC Orders for Callaway Plant updated through December 19, 2017.
Also included on each CD-ROM is an FSAR Change Log file that provides infonriation on the FSAR Change Notices that were incorporated into FSAR Revision OL-23.
All of the provided documents are in the PDF Normal fotmat and can be viewed using Adobe Acrobat Reader. A copy of Adobe Acrobat Reader 5.0 with the Search plug-in is included on the CD-ROM.
Also included is an eLDL Readme file that provides a brief description of the format and some basic guidance for using the electronic licensing document library.
This submittal contains PDF files which contain hyperlinks to other files contained on the CD-ROM.
These hyperlinks are not essential to the use of the filing. Any material referenced by a hyperlink to another PDF that was essential for the use of this filing has either been included by reference or submitted as part of this flung, it should be noted that the document file naming convention for the CD-ROMs was created prior to the NRC requirement to use the ISO 9660 naming convention, and due to the interactive linking within the documents. these documents cannot be retrofitted to the ISO 9660 naming convention.
In connection with this update, and in light ofCallaway Plants renewed Operating Licetise, a review of changes subject to inclusion per 10 CFR 54.37(b) was performed for the period of June 24. 2016 through December 19, 2017. The review did not find any newly identified systems, structures, or components that would have been subject to an aging management review or evaluation of time-limited aging analyses in accordance with 10 CER 54.21.
This letter contains no new commitments. Please contact Tom Elwood at 314-225-1905 for any questions you may have regarding this submittal.
I declare under penalty of perjury that the foregoing is true and correct.
Sincerely, Executed on:
/ O/
(J
/ Roger C. Wink
(
Manager, Regulatory Affairs J PKi
Enclosures:
I.
CD ]
- Complete FSAR Text
- Contains Sensitive Information 2.
CD 2
- Redacted FSAR Text
ULNRC-06442 June 19, 2018 Page 3 of4 cc:
Mr. Kriss M. Kennedy (w/o Enclosure 1)
Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector (w Enclosure 1 & 2)
Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. L. John Kios (w/ Enclosure 1 & 2)
P ml ect Manager. Call away Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 09E3 Washimton, DC 20555-000 1 Caitlin Murphy (w/o Enclosure 1) 700 Galleria Parkway SE. Suite 100 Atlanta. GA 30339
ULNRC-06442 June 19, 2018 Page 4 of 4 Index and send hardcopy to QA File A160.0761 Hardcopy: (wlo Enclosure 1)
Certrec Corporation 6100 Western Place, Suite 1050 Fort Worth, TX 76107 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following can be made via FSAR ULNRC Distribution:
w/o attachments F. M. Diya T. E. Hernnann S. P. Banker R. C. Wink T. B. Elwood B. E. Huhmann Corporate Communications NSRB Secretary Mrs. Collette Linder, REP Manager (SEMA)
STARS Regulatory Affairs Mr. Jay Silberg (Pillsbury Winthrop Shaw Pittrnan LLP)
Missouri Public Service Commission Mr. Steve Feeler (DNR)
Mr. Dru Buntin (DNR)