ML18193A914

From kanterella
Jump to navigation Jump to search
Figure 10.2-1, Main Turbine Generator
ML18193A914
Person / Time
Site: Palo Verde  
Issue date: 07/12/2018
From:
Arizona Nuclear Power Project
To:
Office of Nuclear Reactor Regulation
References
10.2-1
Download: ML18193A914 (1)


Text

FO 2NO STAGE 2NO STAGE TO FEEDWATER HEATER 7A AS 2ND STAGE REHEAT CONTROLSYSTEM PT TO DRAIN CR TANK HS MOISTURE SEPARATOR REHEATER A TO DRAIN TANK TO FEEDWATER HEATER BA TO DRAIN TANK TO MOISTURE SEPARATOR DRAIN TANK 1ST STAGE 1ST STAGE TO DRAIN TANK TO MOISTURE SEPARATOR DRAINTANK MAINSTEAM FROM STEAM GENERATOR FROM EHC SV CV FRDM EHC EHC SYS COMBINED INTERCEPT VALVES (6)

TO FEEDWATER HEATER IC TOFEEDWATER HEATER 2C TO FEEOWATER HEATER 3C TO FEEDWATER HEATER 4C TVPICAL FOR ALL LP TURBINES FROM ~

EHC SV FROM EHC IST STAGE TO FEEDWATER HEATER 6A CIV IV CIV LP TURBINE A LP TORSI NE 8 V

V LP TURBINE C GENERATOR FROM F

EHC SV FEEDWATER HEATER 68 FROM EHC 1 ST STAGE n

TO FEEOWATER HEATER 68 EHC SYSTEM CIV CI V CIV CR HS TURBINE TRIP AND LOAD REJECTION MAINSTEAM FROM STEAM GENERATOR QHS RRS M

FO FC AS EXHAUST HOOD SPRAY FROM CONDENSATE PUMP DISCNARGE FRDM 2

EHC SV CY

~FROM EHC 2ND STAGE REHEAT CONTROL SYSTEM FE OFT FEEDWATER PUMP TURBINE DRIVERS STOP VALVES CONTROL VALVES (41 2ND STAGE 2ND STAGE TO DRAIN CR TANK MOISTURE SEPARATOR REHEATER 8 TO DRAIN TANK TO FEEDWATER HEATER 18 NOTE.

ALLLINES AND EQUIPMENT SHOWN OH THIS DRAWING ARE NON SEISMIC CATEGORY I TO DRAIN TANK TO MOISTURE SEPARATDR DRAINTANK 1ST STAGE 1ST STAGE TO DRAIN TANK TO MOISTURE SEPARATOR DRAIN TANK Arizona Nuclear Power Project Palo Verde Nuclear Generating Station Units l, 2 & 3 MAIN TURBINE GENERATOR Figure 10.2-1 I 0407.1 I A 3AP4-446