ML18193A072
| ML18193A072 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 07/12/2018 |
| From: | Arizona Nuclear Power Project |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18193A072 (1) | |
Text
FO M
I 2ND STAGE 2ND STAGE TO FEEOWATER HEATER TA 2ND STAGE REHEAT CONTROLSYSTEM PT TO DRAIN CR TANK HS M
MOISTURE SEPARATOR REHEATER A TO DRAIN TANK TO FEE DWATER HEATER EA TO DRAIN TANK TO MOISTURE SEPARATOR DRAIN TANK 1ST STAGE IST STAGE TO DRAIN TANK TO MOISTURE SEPARATOR DRAINTANK MAINSTEAM FROM STEAM GENERATOR FROM EHC SV FROM EHC EHC )
SYS COMBINED INTERCEPT VALVES ISI TO FEEOWATER HEATER IC TO FEEDWATER HEATER 2C TO FEEDWATER HEATER 3C TO FEEDWATER HEATER 45 TYPICAL FOR ALL LP TURBINES FROM EHC SV FROM EHC 1 ST STAGE n
TO FEE DWA TER HEATER SA CIV IV CIV Lp TURBINE 4 LP TURBINE S LP TURBINE C GENERATOR FROM 5
EHC SV FEEDWATER HEATER 58 FROM I
4 EHC CV IST STAGE PT zn TO FEEDWATER HEATER 58 EHC SYSTEM CIV CIV CIV CR HS TURBINE TRIP AND LOAD REJECTION MAINSTEAM FROM STEAM GENERATOR QHS RRS FO FC AS EXHAUSTHOOD SPRAY FRDM CONDENSATE PUMP DISCHARGE FROM 2
~FROM EHC 2ND STAGE REHEAT CONTROLSYSTEM PT e-0
)
FEEDWATER PUMP TURBINE ORIVERS STOP VALVES 141 CONTROL VALVES 141 TO DRAIN CR TANK
~HS N
2ND STAGE 2ND STAGE TO FEEOWATER HEATER 78 MOISTURE SEPARATOR RE HEATER 8 TO DRAIN TANK NOTE ALL LINES ANO EOUIPMENT SHOWN ON THIS DRAWING ARE NON SEISMIC CATEGORY I PT TO DRAIN TANK TO MOISTURE SEPARATOR DRAINTANK 1ST STAGE 1 ST STAGE TO DRAIN TANK TO MDI5TU R E SEPARATOR DRAIN TANK Arizona Nuclear Power Project Palo Verde Nuclear Generating Station Units t, 2 & 3 MAIN TURBINE GENERATOR Figure 10.2-1 10402.11 4 SAP4-448